MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24220A1512024-10-0909 October 2024 Examination Result Letter No 50 020 OL 24 02 Massachusetts Institute of Technology IR 05000020/20242012024-09-12012 September 2024 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000020/2024201 ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML24127A1012024-04-26026 April 2024 Mit - Update of Professor Ian A. Waitz Named as Mit Vice President for Research ML24127A1002024-04-24024 April 2024 Mit - Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor ML24094A0482024-03-29029 March 2024 Mit Nuclear Reactor Lab., Annual Report for 2023, Per Technical Specification 7.7.1 ML24081A1642024-03-11011 March 2024 Massachusetts Institute of Technology, NF-0343 & NW-0681 - Submittal of Rescinding Notice of Cancellation ML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology– Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 2024-09-12
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML18026A6262018-01-23023 January 2018 Reportable Occurrence 50-20/2018-1: Operation with Fewer than the Required Number of <100 Kw Nuclear Safety System Level Channel Set to Alarm; NRC OPS Center Log # EN 52157 ML0517504082005-06-16016 June 2005 Reportable Occurrence 50-20/2005-1, Missed Daily Secondary Coolant Sample 2021-05-06
[Table view] |
Text
MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTA L CENTER Edward S. Lau Mail Stop: NW12-122 Phone: 617-253-4211 Assistant Director 138 Albany Street Fax: 617-324-0042 Reactor Operations Cambridge, MA 02139 Email: eslau@mit.edu 6 May 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021 -1: Operation with Less than the Required Staffing on Site; NRC OPS Center Log# EN 55212
Dear Sir or Madam:
The Massachusetts Institute of Technology hereby submits a report of an occurrence at the MIT Research Reactor (MITR) in accordance with paragraph 7.7.2(2) of the Technical Specifications. An initial verbal report was made by telephone to the U.S. Nuclear Regulatory Commission Headquarters Operations Center on Saturday 24 April 2021 at 1705.
The format and content of this report was based on Regulatory Guide 1.16, Revision 1.
- 1. Report No. 50-20/2021-1 ; Ops Center Log # EN 55212 2a. Report Date: 30 April 2021 2b. Date of Occurrence: 24 April 2021
- 3. Facility MIT Nuclear Reactor Laboratory
- 4. Identification of Occurrence:
The MIT Research Reactor operated on 24 April 2021 for a time period of about one hour during which there was only one licensed Senior Reactor Operator and an unlicensed trainee present on site. Technical Specification 7 .1.3(1) requires that whenever the reactor is not shut down, there shall be at least one SRO and one other licensed operator present on site. The SRO and the trainee were both in the control room throughout this time.
ROR 50-20/2021-1 6 May 2021 Page 2 of 4
- 5. Condition Prior to Occurrence:
The reactor had been operating at steady-state 5.7 MW throughout Night Shift (0000-0800) on Saturday 24 April 2021 morning.
- 6. Description of Occurrence:
By 0817, the incoming senior reactor operator (SRO), who would be the reactor duty shift supervisor, had received a turnover from and relieved the outgoing SRO. The incoming SRO proceeded to the reactor control room, received a_turnover from and relieved the outgoing console operator from console watch. The outgoing console operator left the reactor site at 0900 without turning console operator duty over to the incoming console operator. The incoming operator, who had forgotten being scheduled to report to the reactor at 0800, arrived at the reactor site at 1000 and went directly to the control room to receive a console turnover from the SRO in the control room. Afterward, the incoming operator telephoned the outgoing operator, and thereby received an official turnover from the outgoing operator.
During the duration without the minimum staffing requirement, the reactor operated at steady state 5.7 MW with no abnormal conditions or alarms. The SRO remained in the control room, while an operator trainee, sufficiently trained to be capable of assisting in response to abnormal operating conditions, was also present in the control room. Furthermore, during the duration, the incoming console operator was available within one mile to the reactor site, and the outgoing console operator was within three miles.
- 7. Description of Apparent Cause of Occurrence The outgoing console operator performed a turnover to the incoming SRO but failed to register the need to provide another turnover to the incoming console operator. At 0900, the outgoing console operator perceiving the turnover as having been completed, proceeded to depart from the reactor site. The incoming console operator, misremembering the shift schedule for the day, had not yet arrived on site.
- 8. Analysis of Occurrence:
The first sentence of Technical Specification 7.1.3(1) states, "When the reactor is not shut down, the minimum crew complement for a shift shall be two licensed operators including at least one licensed senior reactor operator, one of whom shall be in the control room."
The first part of Technical Specification 7.1.3(2) states, "Whenever the reactor is not secured, two persons shall be onsite, one of whom shall be a licensed senior reactor operator. An operator or senior operator shall be present in the control room."
ROR 50-20/2021-1 6 May 2021 Page 3 of 4 Most licensed staff currently covering weekend shifts are working in non-standard shift patterns, and could have confusion as to shift turnover roles . For instance, the outgoing console operator is a qualified SRO, and may cover a shift as either shift supervisor or console operator.
The individual normally covers evening shifts, but was on night shift in this occurrence. The individual may also have fallen into a "slip and capture" mental error scenario between single-turnover and double-turnover pathways, with the distractions including review of a high-priority document with the incoming SRO. Furthermore, the incoming console operator normally covers evening shifts which start at 1600, and on the day of the occurrence had failed to recognize that the scheduled shift would start at 0800. The ongoing COVID-19 public health emergency aggravated this practice of non-standard shift patterns for weekend operation by creating some staffing shortages, as some licensed operators have not yet returned to campus.
There was already a sign posted at the building exit to serve as shift turnover reminder, but its effectiveness decreases over time. A more effective reminder mechanism would allow ready recognition and confirmation of shift coverage and compliance for all outgoing licensed staff as they depart the facility.
- 9. Corrective Action:
The immediate corrective action, on the day of the occurrence, consisted of the newly-arrived console operator telephoning the outgoing console operator for a shift turnover, as described in Item 6 above.
As a near-term corrective action, a shift coverage and compliance notice board is now installed visible to all outgoing license staff as they depart the facility. This notice board is a magnetic whiteboard (see Figure 1) at the reception desk where the names of the on-duty staff members are to be kept updated by the outgoing shift supervisor and outgoing console operator whenever the building is open.
f F. Arelano ILDleder* Bruco fL Hlno1 I JJ<Mtuns IH.Lee IK M°"'V fP Nawazolslu fs.,,.,_u Figure 1 - Two Views of the New Magnetic Whiteboard at Reception Desk
ROR 50-20/2021-1 6 May 2021 Page 4 of 4 All licensed staff have been advised on the presence and usage of the new notice board.
(Completed 28 April 2021.)
Various engineering solutions which would be more robust are being considered as a possible long-term corrective action.
- 10. Failure Data No related occurrences have been documented.
Sincerely,
~t,Jj, Marshall B. Wade Edward S. Lau Superintendent Assistant Director of Reactor Operations MIT Research Reactor MIT Research Reactor Jo~ e~
Director of Reactor Operations MIT Research Reactor cc: MITRSC USNRC - Senior Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation USNRC - Senior Reactor Inspector Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation