Monthly Operating Rept for Apr 1987
ML20215L558
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1987
From: Graham D, Eric Simpson
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
3F0587-06, 3F587-6, NUDOCS 8705120284
Download: ML20215L558 (5)


Text

- . _ _ - . ~ . . . . . _ - , . . ~ - . - .- --- . - . . - . ~ . ~ -

6, *

^

3 OPERATING DATA REPORT DOCKET NO. 50-302

, DATE 5/1/a7 COMPLETED 8Y m c .hm.

TELEPHONE <;;g 7=5-3802 OPERATING STATUS 4

1. Unit Name: creatal River Unit 3 Notes
2. Reportug Pened: 4/1/87 - 4/30/87
3. Licensed T;sermal Power (MWt): 2544
4. Namepiste Rating (Gross MWe): 890
5. Design Electrical Ratang (Not MWe): 825
6. Maximum Dependable Capacity (Gross MWe): ""

, 7. Maximum Dependable Capacity (Net MWe): 821

8. If Changes Occur in Capacity Ratangs (Iteens Number 3 Thsough 7) Since Last Report. Give Reasons-E/A -
9. Power Level To Which Resencted. If Any (Et MWe): N/A
10. Reasons For Resenctions.lf Any: N/A

. in 4: j'1 This Month . Yr..to.Dete Cumuistive "-

i

11. Hours In Reporting Pened 719 2879 88823
12. Number Of Hours Reactor Was Critical 719 2376 56368.4
13. Reactor Reserve Shutdown Hours 0 0 1280.3 l
14. Hours Generator On Line 719 2371 55123.1

, 15. Unit Reenrve Shutdown Hours 0 - 0 0

16. Gross Themal Emergy Generated (MWH) 1580526 5514743 124118680 .
17. Gross Ele.:trical Energy Generated (MWH) "" aa . 1e9911e 42477550
18. Nt Elecencal Energy Generated (MWH)  %*aaAa 1R27354 40340152
19. Unit Service Factor 1001 82.4% 62.11 -
20. Unit Avadsbility Factor inni 82.4% 62.1%
21. Unit Capacity Factor (Using MDC Nt) na 11 77.3% 56.8%
22. Unit Capacity Factor (Using DER Net) 87.7% 76.9% 55.1%
23. Unit Forced Outage Rate 01 17.6% 23. 5'A
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eachl: .

Refuel outane scheduled to begin September 19, 1987 and last 12 weeks.

25. If Shut Down At End Of Report Period. Estisnated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY

} COMMERCIAL OPERATION 1/to177 3/13/77 R PDR g(

,- a AVERAGE DAILY UNIT POWER LEVEL

",'g-DOCKET NO. m u, UNIT F'M *-3 DATE 5/1/87 COMPLEED BY D. cr-h-TELEPHONE (904) 795-3802 MONTH 4/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 809 37 7%

2 7A1 jg 777 .

3 818 g9 783 4 798 20 783 5 792 21 780 6 798 22 767

.g 7 792 23 773 N g 545 24 719 9 544 25 545 10 , 540 26 788

~

11 951 27 . 788 12 u? 746 23 13 545 29 728 14 771 30 767 15 791 31 16 793 ,

INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77 )

w

<e-w w an.-,--r,----v.-- , - , - p--------w--- - - , - - - - - - - - - - ---,,---m-,--,~,- -------r--,--,-,r- ,-----+-.--------r--~ -+ , - , ,

_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ .~ _ _ . _ _ _ .. ._. _

i

N

(, V -

}

o 1, .

i .

DOCKET NO' u-us l UNIT SHUTDOWNS AND POWER REDUCTIONS = = =

  • N E t DATE SII#8' 4

COMPLETED BY 'a = * -

j REFORT MONTH 4/a7 MEPHONE CJ m a "k -

  • jg } .3 7j Licensee E, Ea g a. Cause & Corrective i No. Date E E=

j$

5

)sE Event *T A0 5-3 Action to i j;gg Report *

[U Prevent Recurrence 6

I 1

l l 87-Ol i 870408 F 0.0 A 9 N/A BR PumpII Lower Motor Bearing Failure On

} Condensate Pump (CDP) 1A. l 87-0; 8B425 5 0.0 5 5 N/A ME PumpII j Main Purpose for Load Reduction Use [

to Investigate Cause for Excessive vibration on Condemente Pump (CDP-15). During the Beduction, Other Maintenance Activities were 1

i '

Performed. They were: Replace i

I Sacrificial' Iron Crating in  ;

circulating Waterbou "C"; Tighten '

Shaft Sleeve on Booster Feedwater Pump 15.

E i

t 2 3 4

'(: Forced Reason: Ma6had Exhibit G Instauctions 5: Scheduled A Equipment Failure (Emplain) 1-Man I for Preperation of Deta B-Meintenance of Test 2-Mans 1 Scra. Entry Sheets for IAvnsee C Refueling .3-Auto Scras. Event Report (LER) File (NUREG.

D-Regulatory Restriction '4-Continued 0161) t E-Operator Training & Ucense Emendnatkm .

5-Reduced toad j F Administret'ive '-'th*" 5 j G-Operational Error (Emplain) Exhibit 1 - Same Source j 19/77) IIOther (Emplain)

  • i f _ __

, *- . V MONTHLY OPERATIONAL

SUMMARY

STATEMENT

-t DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/1/87 COMPLETED BY J. O. Molton TELEPHONE (904) 795-3802 MONTH 4/87

SUMMARY

STATEMENT:

Crystal River Unit 3 remained on line all month with two major load reductions, each involving different condensate. pumps.

[.* 's 4

i o

e W

o* "*

a t@.....gA a:

Florida Power CORPORA 7 ION May 8, 1987 3F0587-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 April 1987 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, E. C. Simpson Acting Director, Nuclear Site Support AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector ff0Y GENERAL OFFICE: 3201 Thirty-fourth Street South

  • P.O. Box 14042
  • St. Petersburg, Florida 33733 * (813) 866-5151

'lf A Florida Progress Company