3F0587-06, Monthly Operating Rept for Apr 1987
| ML20215L558 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/30/1987 |
| From: | Graham D, Eric Simpson FLORIDA POWER CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 3F0587-06, 3F587-6, NUDOCS 8705120284 | |
| Download: ML20215L558 (5) | |
Text
- . _ _ - . ~ . . . . . _ - , . . ~ - . - .- --- . - . . - . ~ . ~ -
6, *
^
3 OPERATING DATA REPORT DOCKET NO. 50-302
, DATE 5/1/a7 COMPLETED 8Y m c .hm.
TELEPHONE <;;g 7=5-3802 OPERATING STATUS 4
- 1. Unit Name: creatal River Unit 3 Notes
- 2. Reportug Pened: 4/1/87 - 4/30/87
- 3. Licensed T;sermal Power (MWt): 2544
- 4. Namepiste Rating (Gross MWe): 890
- 5. Design Electrical Ratang (Not MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): ""
, 7. Maximum Dependable Capacity (Net MWe): 821
- 8. If Changes Occur in Capacity Ratangs (Iteens Number 3 Thsough 7) Since Last Report. Give Reasons-E/A -
- 9. Power Level To Which Resencted. If Any (Et MWe): N/A
- 10. Reasons For Resenctions.lf Any: N/A
. in 4: j'1 This Month . Yr..to.Dete Cumuistive "-
i
- 11. Hours In Reporting Pened 719 2879 88823
- 12. Number Of Hours Reactor Was Critical 719 2376 56368.4
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3 l
- 14. Hours Generator On Line 719 2371 55123.1
, 15. Unit Reenrve Shutdown Hours 0 - 0 0
- 16. Gross Themal Emergy Generated (MWH) 1580526 5514743 124118680 .
- 17. Gross Ele.:trical Energy Generated (MWH) "" aa . 1e9911e 42477550
- 18. Nt Elecencal Energy Generated (MWH) %*aaAa 1R27354 40340152
- 19. Unit Service Factor 1001 82.4% 62.11 -
- 20. Unit Avadsbility Factor inni 82.4% 62.1%
- 21. Unit Capacity Factor (Using MDC Nt) na 11 77.3% 56.8%
- 22. Unit Capacity Factor (Using DER Net) 87.7% 76.9% 55.1%
- 23. Unit Forced Outage Rate 01 17.6% 23. 5'A
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eachl: .
Refuel outane scheduled to begin September 19, 1987 and last 12 weeks.
- 25. If Shut Down At End Of Report Period. Estisnated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY
} COMMERCIAL OPERATION 1/to177 3/13/77 R PDR g(
,- a AVERAGE DAILY UNIT POWER LEVEL
",'g-DOCKET NO. m u, UNIT F'M *-3 DATE 5/1/87 COMPLEED BY D. cr-h-TELEPHONE (904) 795-3802 MONTH 4/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 809 37 7%
2 7A1 jg 777 .
3 818 g9 783 4 798 20 783 5 792 21 780 6 798 22 767
.g 7 792 23 773 N g 545 24 719 9 544 25 545 10 , 540 26 788
~
11 951 27 . 788 12 u? 746 23 13 545 29 728 14 771 30 767 15 791 31 16 793 ,
INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77 )
w
<e-w w an.-,--r,----v.-- , - , - p--------w--- - - , - - - - - - - - - - ---,,---m-,--,~,- -------r--,--,-,r- ,-----+-.--------r--~ -+ , - , ,
_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ .~ _ _ . _ _ _ .. ._. _
i
N
(, V -
}
o 1, .
i .
DOCKET NO' u-us l UNIT SHUTDOWNS AND POWER REDUCTIONS = = =
- N E t DATE SII#8' 4
COMPLETED BY 'a = * -
j REFORT MONTH 4/a7 MEPHONE CJ m a "k -
- jg } .3 7j Licensee E, Ea g a. Cause & Corrective i No. Date E E=
j$
5
)sE Event *T A0 5-3 Action to i j;gg Report *
[U Prevent Recurrence 6
I 1
l l 87-Ol i 870408 F 0.0 A 9 N/A BR PumpII Lower Motor Bearing Failure On
} Condensate Pump (CDP) 1A. l 87-0; 8B425 5 0.0 5 5 N/A ME PumpII j Main Purpose for Load Reduction Use [
to Investigate Cause for Excessive vibration on Condemente Pump (CDP-15). During the Beduction, Other Maintenance Activities were 1
i '
Performed. They were: Replace i
I Sacrificial' Iron Crating in ;
circulating Waterbou "C"; Tighten '
Shaft Sleeve on Booster Feedwater Pump 15.
E i
t 2 3 4
'(: Forced Reason: Ma6had Exhibit G Instauctions 5: Scheduled A Equipment Failure (Emplain) 1-Man I for Preperation of Deta B-Meintenance of Test 2-Mans 1 Scra. Entry Sheets for IAvnsee C Refueling .3-Auto Scras. Event Report (LER) File (NUREG.
D-Regulatory Restriction '4-Continued 0161) t E-Operator Training & Ucense Emendnatkm .
5-Reduced toad j F Administret'ive '-'th*" 5 j G-Operational Error (Emplain) Exhibit 1 - Same Source j 19/77) IIOther (Emplain)
- i f _ __
, *- . V MONTHLY OPERATIONAL
SUMMARY
STATEMENT
-t DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/1/87 COMPLETED BY J. O. Molton TELEPHONE (904) 795-3802 MONTH 4/87
SUMMARY
STATEMENT:
Crystal River Unit 3 remained on line all month with two major load reductions, each involving different condensate. pumps.
[.* 's 4
i o
e W
o* "*
a t@.....gA a:
Florida Power CORPORA 7 ION May 8, 1987 3F0587-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit 3 April 1987 Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, E. C. Simpson Acting Director, Nuclear Site Support AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector ff0Y GENERAL OFFICE: 3201 Thirty-fourth Street South
- P.O. Box 14042
- St. Petersburg, Florida 33733 * (813) 866-5151
'lf A Florida Progress Company