Hurricane Florence

From kanterella
Revision as of 10:09, 26 May 2021 by StriderTol (talk | contribs) (Created page with "{{Hurricane-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

12 October 1988

See also: Hurricane

Scrams (0)

General

 Start dateSiteTitle
ML20309A9133 November 2020Consolidated Interim Storage FacilityComment (10232) E-mail Regarding ISP-CISF Draft EIS
ML20309B0363 November 2020Consolidated Interim Storage FacilityComment (10294) E-mail Regarding ISP-CISF Draft EIS
ML20282A66130 October 2020Section 6 - Security and Emergency Preparedness - 2020-2021 Information Digest, Vol. 32
IR 05000324/202000112 May 2020BrunswickIntegrated Inspection Report Report 05000324/2020001 and 05000325/2020001
ML20045F28514 February 2020RIL-2001, Part 4, - Proceedings of NRC Annual Probabilistic Flood Hazard Assessment Research Workshops I-IV
ML20023B3053 December 2019Transcript of the Advisory Committee on Reactor Safeguards Global Nuclear Fuel Licensing Topical Report Subcommittee Meeting - December 3, 2019 (Open)
ML19270D57525 September 2019M190925: State of Reliability
ML19273A08225 September 2019M190925: Transcript - Joint Meeting of the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) (Public)
ML19220A5226 August 2019NRC-2019-000295 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML19130A1127 May 2019San OnofreIndependent Spent Fuel Storage Facility - 2018 Annual Radiological Environmental Operating Report
ML19018A2066 May 2019BrunswickIssuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time
RA-19-0136, Annual Radiological Environmental Operating Report29 April 2019HarrisAnnual Radiological Environmental Operating Report
NUREG-1100 Volume 35, Congressional Budget Justification Fiscal Year 2020.31 March 2019NUREG-1100, Vol. 35, Congressional Budget Justification Fiscal Year 2020.
IR 05000324/20193014 March 2019BrunswickNRC Operator License Examination Report 05000325/2019301 and 05000324/2019301
RA-19-0083, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation24 January 2019BrunswickReactor Operator and Senior Reactor Operator License Post-Examination Documentation
ML19004A3403 January 2019BrunswickOperator Licensing Examination Approval 05000325/2019301 and 05000324/2019301
IR 05000424/20180039 November 2018VogtleNuclear Regulatory Commission Integrated Inspection Report 05000424/2018003 and 05000425/2018003
IR 05000395/20180038 November 2018SummerNuclear Regulatory Commission Integrated Inspection Report 05000395/2018003
IR 05000321/20180038 November 2018HatchNuclear Regulatory Commission Integrated Inspection Report 05000321/2018003 and 05000366/2018003
IR 05000261/20180037 November 2018RobinsonNuclear Regulatory Commission Inspection Report 05000261/2018003
IR 05000369/20180037 November 2018Mcguire
McGuire
Nuclear Regulatory Commission Integrated Inspection Report 05000369/2018003 and 05000370/2018003
IR 05000324/20180032 November 2018BrunswickNRC Integrated Inspection Report 05000325/2018003 and 05000324/2018003; 05000325/2018502 and 05000324/2018502
IR 05000317/201800331 October 2018Calvert CliffsIntegrated Inspection Report 05000317/2018003 and 05000318/2018003
ML18304A16829 October 2018M181029: Scheduling Note and Slides - Transformation at the NRC (Public Meeting)
ML18304A48029 October 2018M181029: Transcript - Transformation at the NRC (Public)
IR 05000400/201800326 October 2018HarrisNRC Integrated Inspection Report 05000400/2018003
IR 05000280/201800326 October 2018SurryNuclear Regulatory Commission Integrated Inspection Report 05000280/2018003 and 05000281/2018003
ML18274A32627 September 2018M180927: Transcript-Strategic Programmatic Overview of the Operating Reactor Business Line
ML18263A30820 September 2018Brunswick(5) 9-20-18 FEMA Letter (Mcasey): Final Disaster Initiated Review Findings for Brunswick Site (Post-Hurricane Florence)
ENS 5360113 September 2018 04:00:00Indian PointHurricane Notification Per Technical Requirement for Hurricane Florence
Press Release-II-18-033, NRC Expands Nuclear Power Plant Monitoring During Hurricane Florence13 September 2018Press Release-II-18-033: NRC Expands Nuclear Power Plant Monitoring During Hurricane Florence
Press Release-II-18-032, NRC Preparing for Hurricane Florence12 September 2018Press Release-II-18-032: NRC Preparing for Hurricane Florence
ML18261A03010 September 2018North Anna
07200002
North Anna, and ISFSI, Surry and ISFSI, Temporary Modification of Interim Compensatory Measures for Order EA-02-104
ML20245J48227 June 1989SeabrookTranscript of 890627 Evidentiary Hearing in Boston,Ma Re Offsite Emergency Planning.Pp 27,427-27,778.Supporting Info Encl.Witnesses:Sj Ellis,Am Callendrello,Cm Frank,Tf Grew & Tm Carter
IR 05000382/198802112 October 1988WaterfordInsp Rept 50-382/88-21 on 880801-0916.Violation & Deviation Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Followup of Previously Identified Items,Operational Safety Verification & Monthly Maint Observation