NUREG-1100 Volume 35, Congressional Budget Justification Fiscal Year 2020.

From kanterella
Jump to navigation Jump to search
NUREG-1100, Vol. 35, Congressional Budget Justification Fiscal Year 2020.
ML19065A279
Person / Time
Issue date: 03/31/2019
From:
NRC/OCFO
To:
kjd1
References
NUREG-1100 V35
Download: ML19065A279 (189)


Text

NUREG-1100 Volume 35

\ SU.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment CONGRESSIONAL BUDGET JUSTIFICATION FISCAL YEAR 2020

AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material Non-NRC Reference Material As of November 1999, you may electronically access Documents available from public and special technical NUREG-series publications and other NRC records at libraries include all open literature items, such as books, NRCs Library at www.nrc.gov/reading-rm.html. Publicly journal articles, transactions, Federal Register notices, released records include, to name a few, NUREG-series Federal and State legislation, and congressional reports.

publications; Federal Register notices; applicant, Such documents as theses, dissertations, foreign reports licensee, and vendor documents and correspondence; and translations, and non-NRC conference proceedings NRC correspondence and internal memoranda; bulletins may be purchased from their sponsoring organization.

and information notices; inspection and investigative reports; licensee event reports; and Commission papers Copies of industry codes and standards used in a and their attachments. substantive manner in the NRC regulatory process are maintained at NRC publications in the NUREG series, NRC regulations, The NRC Technical Library and Title 10, Energy, in the Code of Federal Regulations Two White Flint North may also be purchased from one of these two sources. 11545 Rockville Pike Rockville, MD 20852-2738

1. The Superintendent of Documents U.S. Government Publishing Office These standards are available in the library for reference Washington, DC 20402-0001 use by the public. Codes and standards are usually Internet: bookstore.gpo.gov copyrighted and may be purchased from the originating Telephone: (202) 512-1800 organization or, if they are American National Standards, Fax: (202) 512-2104 from American National Standards Institute
2. The National Technical Information Service 11 West 42nd Street 5301 Shawnee Road New York, NY 10036-8002 Alexandria, VA 22312-0002 www.ansi.org www.ntis.gov (212) 642-4900 1-800-553-6847 or, locally, (703) 605-6000 Legally binding regulatory requirements are stated only in A single copy of each NRC draft report for comment is laws; NRC regulations; licenses, including technical available free, to the extent of supply, upon written specifications; or orders, not in NUREG-series publications.

The views expressed in contractor prepared publications in request as follows:

this series are not necessarily those of the NRC.

Address: U.S. Nuclear Regulatory Commission The NUREG series comprises (1) technical and Office of Administration administrative reports and books prepared by the staff (NUREG-XXXX) or agency contractors (NUREG/CR-XXXX),

Multimedia, Graphics, and Storage &

(2) proceedings of conferences (NUREG/CP-XXXX),

Distribution Branch (3) reports resulting from international agreements Washington, DC 20555-0001 (NUREG/IA-XXXX),(4) brochures (NUREG/BR-XXXX), and E-mail: distribution.resource@nrc.gov (5) compilations of legal decisions and orders of the Facsimile: (301) 415-2289 Commission and Atomic and Safety Licensing Boards and of Directors decisions under Section 2.206 of NRCs regulations (NUREG-0750).

Some publications in the NUREG series that are posted at NRCs Web site address www.nrc.gov/reading-rm/ DISCLAIMER: This report was prepared as an account doc-collections/nuregs are updated periodically and may of work sponsored by an agency of the U.S. Government.

differ from the last printed version. Although references to Neither the U.S. Government nor any agency thereof, nor any employee, makes any warranty, expressed or implied, material found on a Web site bear the date the material or assumes any legal liability or responsibility for any third was accessed, the material available on the date cited partys use, or the results of such use, of any information, may subsequently be removed from the site. apparatus, product, or process disclosed in this publication, or represents that its use by such third party would not infringe privately owned rights.

NUREG-1100 Volume 35 CONGRESSIONAL BUDGET JUSTIFICATION FISCAL YEAR 2020

TABLE OF CONTENTS CONTENTS Executive Summary ................................................................................................................... ix About the U.S. Nuclear Regulatory Commission ..................................................................... 1 Proposed Fiscal Year 2020 Appropriations Legislation .......................................................... 5 Nuclear Reactor Safety............................................................................................................. 11 Operating Reactors ......................................................................................................... 13 New Reactors .................................................................................................................. 31 Nuclear Materials and Waste Safety ....................................................................................... 43 Spent Fuel Storage and Transportation .......................................................................... 45 Nuclear Materials Users .................................................................................................. 53 Decommissioning and Low-Level Waste ........................................................................ 65 High-Level Waste ............................................................................................................ 73 Fuel Facilities ............................................................................................................... 75 Corporate Support .................................................................................................................... 83 Integrated University Program ................................................................................................ 93 Annual Performance Plan ........................................................................................................ 95 Office of the Inspector General ............................................................................................. 119 Appendix A: Full Cost of U.S. Nuclear Regulatory Commission Programs ..................... 131 Appendix B: Budget Authority by Function ........................................................................ 133 Appendix C: Agency Fee Recovery ..................................................................................... 135 Appendix D: Summary of Reimbursable Work ................................................................... 139 Appendix E: Federal Information Technology Acquisition Reform Act Requirements .. 141 Appendix F: Summary of Planned Rulemaking Activities ................................................. 147 Appendix G: Obligations by Control Point .......................................................................... 157 Appendix H: Report on Drug Testing ................................................................................... 159 Appendix I: FY 2019 Total Budget Authority Comparison ................................................. 161 Appendix J: Glossary ............................................................................................................ 167 Appendix K: Acronym List .................................................................................................... 169 FY 2020 Congressional Budget Justification l iii

FIGURES U.S. Nuclear Regulatory Commission FY 2014-FY 2020 Budget ................................................ ix NRC Organizational Chart ............................................................................................................ 2 U.S. Operating Commercial Nuclear Power Reactors Anticipated to be Operating as of October 1, 2019 ................................................................................................................. 14 New Reactor Applications under Review .................................................................................... 34 Licensed and Operating ISFSIs by State .................................................................................... 46 Spent Fuel Storage and Transportation Workload ...................................................................... 48 Current Agreement States .......................................................................................................... 54 Nuclear Materials Users Workload ............................................................................................. 56 Locations of NRC-Regulated Sites Undergoing Decommissioning ............................................ 66 Uranium Recovery Licensed Facilities and Major Licensing Actions .......................................... 68 Research and Test Reactors and Power/Early Demonstration Reactors Undergoing Decommissioning ........................................................................................................................ 68 Locations of Licensed Fuel Cycle Facilities ................................................................................ 76 Fuel Facilities Workload .............................................................................................................. 78 FY 2020 Congressional Budget Justification l v

TABLES Budget Authority and Full-Time Equivalents ................................................................................. x Budget Authority by Appropriation ............................................................................................... xi Nuclear Reactor Safety ............................................................................................................... 11 Operating Reactors by Product Line ........................................................................................... 13 License Renewal and Medical Radioisotope Facility Review Schedule ..................................... 18 Status of Reactors Transitioning from Operating to Decommissioning ...................................... 19 New Reactors by Product Line ................................................................................................... 31 New Reactor Applications under Review .................................................................................... 35 Nuclear Materials and Waste Safety ........................................................................................... 43 Spent Fuel Storage and Transportation by Product Line ............................................................ 45 Nuclear Materials Users by Product Line .................................................................................... 53 Decommissioning and Low-Level Waste by Product Line .......................................................... 65 High-Level Waste by Product Line .............................................................................................. 73 Fuel Facilities by Product Line .................................................................................................... 75 Corporate Support by Product Line ............................................................................................ 83 Integrated University Program .................................................................................................... 93 Alignment of Resources to NRC Goals ....................................................................................... 96 Strategic Plan Strategies and Supporting Business Lines ........................................................ 116 NRC OIG Budget Authority and Full-Time Equivalents ............................................................ 119 Audits Budget Authority ............................................................................................................ 119 Investigations Budget Authority ................................................................................................ 121 NRC OIG Budget Resources Linked to OIGs Strategic Goals ................................................. 125 Full Cost Budget Authority and Full-Time Equivalents .............................................................. 131 Corporate Support by Business Line ........................................................................................ 132 Budget Authority by Function .................................................................................................... 133 Crosswalk of Business Line Allocation to Fee Classes ............................................................ 136 Agency Fee Recovery ............................................................................................................... 137 Summary of Reimbursable Work .............................................................................................. 139 NRC IT Spending ...................................................................................................................... 142 NRC IT Table ............................................................................................................................ 143 Summary of Planned Rulemaking Activities ............................................................................. 147 Nuclear Regulatory Commission Monthly Congressional Status Report .................................. 158 Budget Authority and Full-Time Equivalents FY 2019 Total Budget Authority Comparison ..... 161 Operating Reactors by Product Line FY 2019 Total Budget Authority Comparison ................. 162 Spent Fuel Storage and Transportation by Product Line FY 2019 Total Budget Authority Comparison............................................................................................................................... 163 Decommissioning and Low-Level Waste by Product Line FY 2019 Total Budget Authority Comparison............................................................................................................................... 164 Corporate Support by Product Line FY 2019 Total Budget Authority Comparison ................... 165 FY 2020 Congressional Budget Justification l vii

EXECUTIVE

SUMMARY

EXECUTIVE

SUMMARY

The mission of the U.S. Nuclear Regulatory Commission (NRC) is to license and regulate the Nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. To sustain the agencys mission success while providing enhanced regulatory infrastructure to address future challenges and innovation in the nuclear sector, the NRCs fiscal year (FY) 2020 budget request is $921.1 million, including 3,062 full-time equivalents (FTE). The FY 2020 budget request reflects an increase of $10.1 million, approximately 1.1 percent, when compared with the FY 2019 Enacted Budget. The increase is principally the result of $38.5 million, including 77 FTE, requested to support licensing activities for the proposed Yucca Mountain deep geologic repository for spent nuclear fuel and other high-level radioactive waste. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, which provides a comparison of the FY 2020 request to the FY 2019 Budget Authority.

1,100 3,799.7 3,800 3,778.5 1,050 15.0 15.0 34.2 3,595.0 3,600 1,000 15.0 Dollars in Millions 3,396.0 3,400 950 15.0 15.0 FTE 1,040.9 15.0 23.0 15.0 3,200 3,186.0 20.0 900 1,000.3 38.5 987.1 3,106.0 3,062.0 850 902.1 907.0 3,000 896.0 882.6 2,985.0 800 2,800 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Enacted Enacted Enacted Enacted Enacted Enacted Request Program and Corporate ($M) Carryover ($M)

High-Level Waste ($M) Integrated University Program ($M)

FTE FTE (Excludes High-Level Waste)

Figure 1: NRC FY 2014-FY 2020 Budget (Includes the Office of the Inspector General)

As shown in Figure 1, since FY 2014, the agency budget has decreased by 15 percent, excluding resources for Yucca Mountain and the Integrated University Program. The agency has also reduced FTE by 21 percent during this period.

FY 2020 Congressional Budget Justification l ix

EXECUTIVE

SUMMARY

Budget Authority and Full-Time Equivalents (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Business Actuals Enacted* Request FY 2019 Line/Major Program $M FTE $M FTE $M FTE $M FTE Operating Reactors 367.0 1,504.5 365.2 1,533.0 361.6 1,485.0 (3.6) (48.0)

New Reactors 95.7 381.2 94.1 386.0 87.8 339.0 (6.3) (47.0)

Nuclear Reactor Safety $462.6 1,885.7 $459.4 1,919.0 $449.5 1,824.0 $(9.9) (95.0)

Spent Fuel Storage and Transportation 26.0 96.6 22.5 100.0 24.2 101.0 1.7 1.0 Nuclear Materials Users 62.3 211.4 60.6 215.0 59.1 205.0 (1.4) (10.0)

Decommissioning and Low-Level Waste 27.1 107.5 24.8 104.0 22.9 93.0 (1.9) (11.0)

High-Level Waste 0.1 0.4 0.0 0.0 38.5 77.0 38.5 77.0 Fuel Facilities 24.6 107.0 23.2 96.0 21.0 88.0 (2.2) (8.0)

Nuclear Materials and Waste Safety $140.1 523.0 $131.0 515.0 $165.7 564.0 $34.7 49.0 Major Program Subtotal $602.8 2,408.6 $590.4 2,434.0 $615.2 2,388.0 $24.8 (46.0)

Corporate Support 296.4 594.0 292.9 609.0 292.6 611.0 (0.4) 2.0 Integrated University Program 15.5 0.0 15.0 0.0 0.0 0.0 (15.0) 0.0 Subtotal $914.7 3,002.6 $898.4 3,043.0 $907.8 2,999.0 $9.4 (44.0)

Inspector General 13.3 60.8 12.6 63.0 13.3 63.0 0.7 0.0 Total $928.1 3,063.4 $911.0 3,106.0 $921.1 3,062.0 $10.1 (44.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, research and licensing activities within the Operating Reactors, Spent Fuel Storage and Transportation, Decommissioning and Low-Level Waste, and Corporate Support Business Lines were funded $20 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

Resources requested for the Nuclear Reactor Safety Program decrease by $9.9 million, including 95 FTE, primarily as a result of a decline in workload, efficiencies in processing licensing actions; the merger of activities within the Office of Nuclear Reactor Regulation and the Office of New Reactors; and the upcoming closures of the Pilgrim, Oyster Creek, and Three Mile Island nuclear generating stations. The requested resources for the Nuclear Reactor Safety Program also include $15.5 million for the continued development of a regulatory infrastructure for advanced nuclear reactor technologies.

Resources for the Nuclear Materials and Waste Safety Program increase by $34.7 million, including 49 FTE. This request includes $38.5 million, including 77 FTE, for licensing activities related to the proposed Yucca Mountain deep geologic repository for the disposal of spent nuclear fuel and other high-level radioactive waste, which accounts for the increase in FY 2020 Congressional Budget Justification l x

EXECUTIVE

SUMMARY

comparison to the FY 2019 Enacted Budget. The four remaining business lines in the Nuclear Materials and Waste Safety Program reflect a decrease of $3.8 million, including 28 FTE, primarily as a result of the anticipated decline in workload.

Resources requested for Corporate Support remain relatively flat, with a total decrease of

$0.4 million, including an increase of 2 FTE, when compared with the FY 2019 Enacted Budget.

The decrease is primarily the result of cost reductions in information technology (IT), as a result of successful efforts to modernize IT by moving to a more secure and cost-effective infrastructure. The decreases are partially offset by increases for (1) permanent-change-of-station costs, (2) renovations at NRC Headquarters to reduce the agencys real estate footprint and costs, and (3) salaries and benefits for a Commission at its full complement of five members.

The Office of the Inspector Generals (OIG) component of the FY 2020 proposed budget is

$13.3 million, including 63 FTE, of which $12.1 million is for auditing and investigation activities for NRC programs and $1.2 million is for the auditing and investigation activities of the Defense Nuclear Facilities Safety Board (DNFSB).

Budget Authority by Appropriation (Dollars in Millions)

FY 2019 FY 2020 Changes from Enacted Request FY 2019 NRC Appropriation $M $M $M Salaries and Expenses (S&E)

Budget Authority 898.4 907.8 9.4 Offsetting Fees 770.5 748.7 (21.8)

Net Appropriated S&E $127.9 $159.1 $31.2 Office of the Inspector General (OIG)

Budget Authority 12.6 13.3 0.7 Offsetting Fees 10.4 10.9 0.6 Net Appropriated OIG $2.3 $2.4 $0.1 Total NRC Budget Authority 911.0 921.1 10.1 Offsetting Fees 780.8 759.6 (21.2)

Total Net Appropriated $130.1 $161.5 $31.4

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

In accordance with the provisions of the Omnibus Budget Reconciliation Act of 1990 (OBRA-90), as amended, the NRCs FY 2020 budget request provides for approximately 90-percent fee recovery, less amounts appropriated from the Nuclear Waste Fund, and amounts appropriated for generic homeland security activities, and for Waste Incidental to Reprocessing activities under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005. The proposed FY 2020 appropriations language will FY 2020 Congressional Budget Justification l xi

EXECUTIVE

SUMMARY

also exclude from OBRA-90s fee recovery requirement the amounts appropriated for advanced reactor regulatory infrastructure activities and OIG services for DNFSB, as well as part of the amount appropriated for international activities.

The NRC will recover $759.6 million of the FY 2020 budget from fees assessed to NRC licensees. This will result in a net appropriation of $161.5 million, which is an increase of

$31.4 million when compared with the FY 2019 Enacted Budget. The increase in net appropriation is primarily the result of $38.5 million requested from the Nuclear Waste Fund for licensing activities related to Yucca Mountain, which is nonfee-recoverable.

Appendix A, Full Cost of U.S. Nuclear Regulatory Commission Programs, to this document provides the full cost of NRC programs, in accordance with the requirements defined in Section 51.2, Requirements for Program Justification, of the U.S. Office of Management and Budget Circular A-11, Preparation, Submission, and Execution of the Budget, issued July 2016.

SIGNIFICANT AGENCYWIDE ACCOMPLISHMENTS IN FY 2018 The NRCs significant agencywide accomplishments include the following:

Continued to oversee the safe and secure operation of nuclear power plants and fuel cycle facilities, as well as the possession and use of radioactive materials.

Continued the technical reviews of large light-water reactor and small modular reactor applications and conducted regulatory oversight of construction activities.

Conducted hundreds of public meetings across the country, as part of the agencys efforts to maintain regular and transparent communications with stakeholders.

Met or exceeded the FY 2018 performance goals for operating power reactor licensing actions and other licensing tasks.

Prepared several draft proposed rules, including rules on reactor decommissioning, emergency preparedness for small modular reactors and other new technologies, and financial qualifications for merchant plants.

Trained over 95 percent of identified staff across the agency on key concepts in licensing basis and backfitting.

Continued to implement actions in the agencys vision and strategy to achieve advanced non-light-water reactor readiness.

Finalized the agreement authoring the State of Wyoming to become an Agreement State and to assume regulatory authority for uranium recovery facilities.

Additional FY 2018 accomplishments specific to each business line are included in each chapter.

FY 2020 Congressional Budget Justification l xii

ABOUT THE U.S. NUCLEAR REGULATORY COMMISSION ABOUT THE U.S. NUCLEAR REGULATORY COMMISSION Mission To license and regulate the Nations civilian use of radioactive material to provide reasonable assurance of adequate protection of public health and safety, to promote the common defense and security, and to protect the environment.

The U.S. Nuclear Regulatory Commission (NRC) is an independent Federal agency established by Congress. It regulates commercial nuclear power plants; research, test, and training reactors; nuclear fuel cycle facilities; and radioactive materials used in medicine, academia, and industry. The agency also regulates the transport, storage, and disposal of radioactive materials and waste and the export or import of radioactive materials. The NRC regulates industries within the United States and works with agencies around the world to enhance global nuclear safety and security. The NRCs key regulatory functions include the following:

Developing regulations and guidance, including participating in consensus standards development.

Licensing and certifying the use of nuclear materials, the operation of nuclear facilities, and the decommissioning of nuclear facilities.

Inspecting and assessing licensee operations and nuclear facilities, including incident response and investigation, and taking enforcement actions when necessary.

Evaluating domestic and international operational experience and taking generic action when appropriate.

Conducting research, holding hearings, and obtaining independent insights that support sound regulatory decision-making.

The NRCs Commission has up to five members nominated by the President and confirmed by the Senate for 5-year terms. The President designates one member to serve as Chairman.

The Chairman is the principal executive officer and spokesperson for the Commission. As a collegial body, the Commission formulates policies and regulations governing the safety and security of nuclear reactors and materials, issues orders to licensees, and adjudicates legal matters brought before it. The Executive Director for Operations carries out the policies and decisions of the Commission and directs the activities of the program and regional offices (see Figure 2).

FY 2020 Congressional Budget Justification l 1

ABOUT THE U.S. NUCLEAR REGULATORY COMMISSION Figure 2: NRC Organizational Chart FY 2020 Congressional Budget Justification l 2

ABOUT THE U.S. NUCLEAR REGULATORY COMMISSION The NRC is headquartered in Rockville, MD. The agency has four regional offices, located in King of Prussia, PA (Region I); Atlanta, GA (Region II); Lisle, IL (Region III); and Arlington, TX (Region IV). The major program offices within the NRC include the following:

The Office of Nuclear Reactor Regulation licenses and oversees activities for existing nuclear power reactors and research and test reactors.

The Office of New Reactors licenses and oversees the design, siting, licensing, and construction of new commercial nuclear power reactors.

The Office of Nuclear Regulatory Research provides independent expertise and information for making timely regulatory judgments, anticipating potentially significant safety problems, and resolving safety issues. It helps develop technical regulations and standards and collects, analyzes, and disseminates information about the safety of commercial nuclear power plants and certain nuclear materials activities.

The Office of Nuclear Material Safety and Safeguards licenses and oversees the production of commercial nuclear fuel; uranium-recovery activities; decommissioning of nuclear facilities; and the use of radioactive materials in medical, industrial, academic, and commercial applications. It regulates safe storage, transportation, and disposal of high- and low-level radioactive waste and spent nuclear fuel. The office also works with other Federal agencies and State, Tribal, and local governments on regulatory matters.

The Office of Nuclear Security and Incident Response supports the program offices in overseeing the implementation of agency security policy for nuclear facilities and users of radioactive material and coordinates with other Federal agencies and international organizations on security issues. This office also maintains the NRCs emergency preparedness and incident response programs.

The regional offices conduct inspections and investigations (in conjunction with the Office of Investigations); take enforcement actions (in coordination with the Office of Enforcement); and maintain emergency response programs for nuclear reactors, fuel facilities, and materials licensees. In addition, the regions carry out licensing for certain materials licensees.

FY 2020 Congressional Budget Justification l 3

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION PROPOSED FISCAL YEAR 2020 APPROPRIATIONS LEGISLATION The NRCs proposed appropriation legislation for Fiscal Year (FY) 2020 is as follows:

SALARIES AND EXPENSES For expenses necessary for the Commission in carrying out the purposes of the Energy Reorganization Act of 1974 and the Atomic Energy Act of 1954, $907,765,000, including official representation expenses not to exceed $25,000, to remain available until expended: Provided, That of the amount appropriated herein, $38,529,000 shall be derived from the Nuclear Waste Fund: Provided further, That of the amount appropriated herein, not more than $10,500,000 may be made available for salaries, travel, and other support costs for the Office of the Commission, to remain available until September 30, 2021: Provided further, That revenues from licensing fees, inspection services, and other services and collections estimated at

$748,669,000 in fiscal year 2020 shall be retained and used for necessary salaries and expenses in this account, notwithstanding 31 U.S.C. 3302, and shall remain available until expended: Provided further, That of the amounts appropriated under this heading, not less than

$15,478,000 shall be for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies, except that the amounts provided under this proviso shall not be derived from fee revenues, notwithstanding 42 U.S.C. 2214: Provided further, That of the amounts appropriated under this heading, $6,451,000 of the amount used for international activities shall not be derived from fee revenues, notwithstanding 42 U.S.C. 2214:

Provided further, That the sum herein appropriated shall be reduced by the amount of revenues received during fiscal year 2020 so as to result in a final fiscal year 2020 appropriation estimated at not more than $159,096,000.

OFFICE OF THE INSPECTOR GENERAL For expenses necessary for the Office of Inspector General in carrying out the provisions of the Inspector General Act of 1978, $13,314,000, to remain available until September 30, 2021:

Provided, That revenues from licensing fees, inspection services, and other services and collections estimated at $10,929,000 in fiscal year 2020 shall be retained and be available until September 30, 2021, for necessary salaries and expenses in this account, notwithstanding section 3302 of title 31, United States Code: Provided further, That the sum herein appropriated shall be reduced by the amount of revenues received during fiscal year 2020 so as to result in a final fiscal year 2020 appropriation estimated at not more than $2,385,000: Provided further, That of the amounts appropriated under this heading, $1,171,000 shall be for Inspector General services for the Defense Nuclear Facilities Safety Board, which shall not be available from fee revenues.

FY 2020 Congressional Budget Justification l 5

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION ANALYSIS OF PROPOSED FY 2020 APPROPRIATIONS LEGISLATION The analysis of the NRCs proposed appropriations legislation for FY 2020 is as follows:

SALARIES AND EXPENSES

1. FOR EXPENSES NECESSARY FOR THE COMMISSION IN CARRYING OUT THE PURPOSES OF THE ENERGY REORGANIZATION ACT OF 1974 AND THE ATOMIC ENERGY ACT OF 1954:

The NRC was established by the Energy Reorganization Act of 1974, as amended (42 United States Code (USC) 5841). This act abolished the Atomic Energy Commission (AEC) and transferred to the NRC all of the AECs licensing and related regulatory functions. These functions included those of the Atomic Safety and Licensing Board Panel and the Advisory Committee on Reactor Safeguards; responsibilities for licensing and regulating nuclear facilities and materials; and conducting research for the purpose of confirmatory assessment related to licensing, regulation, and other activities, including research related to nuclear materials safety and regulation under the provisions of the Atomic Energy Act of 1954, as amended (42 USC 2011 et seq.).

2. INCLUDING OFFICIAL REPRESENTATION EXPENSES:

47 Comp. Gen. 657, 43 Comp. Gen. 305 This language is required because of the established rule restricting an agency from charging appropriations with the cost of official representation unless the appropriations involved are specifically available for such purpose. Congress has appropriated funds for official representation expenses to the NRC and its predecessor, the AEC, each year since FY 1950.

3. TO REMAIN AVAILABLE UNTIL EXPENDED:

Title 31 USC 1301 provides that no regular, annual appropriation shall be construed to be permanent or available continuously unless the appropriation expressly provides that it is available after the fiscal year covered by the law in which it appears (or is for specific uses not applicable here).

4. SHALL BE DERIVED FROM THE NUCLEAR WASTE FUND:

Title 42 USC 10131(b)(4) provides for the establishment of a Nuclear Waste Fund to ensure that the costs of carrying out activities relating to the disposal of high-level radioactive waste and spent nuclear fuel will be borne by the persons responsible for generating such waste and spent fuel.

Title 42 USC 10134 specifically requires the NRC to consider an application for a repository for the disposal of high-level radioactive waste and spent nuclear fuel and sets forth certain licensing procedures. Title 42 USC 10133 also assigns review responsibilities to the NRC in the steps leading to submission of the license application. Thus, the Nuclear Waste Policy Act of 1982, as amended, establishes the NRCs responsibility throughout the repository siting process, culminating in the requirement for NRC licensing as a prerequisite to construction and operation of the repository.

FY 2020 Congressional Budget Justification l 6

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION Title 42 USC 10222(d) specifies that expenditures from the Nuclear Waste Fund can be used for purposes of radioactive waste disposal activities, including identification, development, licensing, construction, operation, decommissioning, and post-decommissioning maintenance and monitoring of any repository constructed under the Nuclear Waste Policy Act of 1982, and for administrative costs of the high-level radioactive waste disposal program.

5. REVENUES FROM LICENSING FEES, INSPECTION SERVICES, AND OTHER SERVICES AND COLLECTIONS SHALL BE RETAINED AND USED FOR NECESSARY SALARIES AND EXPENSES IN THIS ACCOUNT, NOTWITHSTANDING 31 U.S.C. 3302, AND SHALL REMAIN AVAILABLE UNTIL EXPENDED:

Under Title V of the Independent Offices Appropriation Act, 1952, Public Law (PL)82-137, the NRC is authorized to collect user fees from any person who receives a service or thing of value from the Commission. Pursuant to 42 USC 2214 (section 6101 of the Omnibus Budget Reconciliation Act of 1990 (OBRA-90)), the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, PL 108-375, and amounts appropriated to the Commission for generic homeland security activities.

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 assigned new responsibilities to the NRC for waste determinations and monitoring of waste disposal actions for material stored at the U.S. Department of Energy sites in South Carolina and Idaho. Section 3116(b)(4) requires that, beginning with the FY 2006 budget, the Commission include in its budget justification materials submitted to Congress the amounts required, not offset by revenues, for performance of its responsibilities under Section 3116. The

$1,303,000 requested to implement Section 3116 is excluded from OBRA-90s fee recovery requirement.

Section 637 of the Energy Policy Act of 2005, PL 109-58, modified the NRCs fee legislation in 42 USC 2214 to exclude the amounts appropriated to the Commission for homeland security activities from OBRA-90s fee recovery requirement, except for reimbursable costs of fingerprinting and background checks and the costs of conducting security inspections. The

$14,150,000 requested for generic homeland security activities is thus excluded from OBRA-90s fee recovery requirement.

The aggregate amount of license fees and annual charges to be collected for FY 2020 approximates 90 percent of the Commissions budget authority, less the amount requested to be derived from the Nuclear Waste Fund, the amount requested to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and the amount requested for generic homeland security activities pursuant to Section 637 of the Energy Policy Act of 2005.

FY 2020 Congressional Budget Justification l 7

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION Title 31 USC 3302 requires the NRC to deposit all revenues collected to miscellaneous receipts of the Treasury unless specifically authorized by law to retain and use such revenues.

6. NOT LESS THAN $15,478,000 SHALL BE FOR ACTIVITIES RELATED TO THE DEVELOPMENT OF REGULATORY INFRASTRUCTURE FOR ADVANCED NUCLEAR REACTOR TECHNOLOGIES, EXCEPT THAT THE AMOUNTS PROVIDED UNDER THIS PROVISO SHALL NOT BE DERIVED FROM FEE REVENUES, NOTWITHSTANDING 42 U.S.C. 2214:

The NRC is accelerating its activities related to the development of regulatory infrastructure to prepare for effective and efficient reviews of advanced reactor technologies. The proposed statutory language requires the NRC to use at least $15,478,000 for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies.

Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities. This proposed appropriations language makes clear that the amount used for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies is excluded from OBRA-90s fee recovery requirement in the same manner as the amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities.

7. $6,451,000 OF THE AMOUNT USED FOR INTERNATIONAL ACTIVITIES SHALL NOT BE DERIVED FROM FEE REVENUES, NOTWITHSTANDING 42 U.S.C. 2214:

Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities. This proposed appropriations language makes clear that

$6,451,000 of the amount used for international activities is excluded from OBRA-90s fee recovery requirement in the same manner as the amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to implement Section 3116 of the Ronald W.

FY 2020 Congressional Budget Justification l 8

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities.

8. THE SUM HEREIN APPROPRIATED SHALL BE REDUCED BY THE AMOUNT OF REVENUES RECEIVED:

Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities.

OFFICE OF THE INSPECTOR GENERAL

9. FOR EXPENSES NECESSARY FOR THE OFFICE OF INSPECTOR GENERAL IN CARRYING OUT THE PROVISIONS OF THE INSPECTOR GENERAL ACT OF 1978:

PL 100-504 amended the Inspector General Act of 1978, PL 95-452, 5 USC app., to establish an Office of the Inspector General (OIG) in the NRC effective in April 1989, and to require the establishment of a separate appropriation account to fund the OIG.

10. TO REMAIN AVAILABLE UNTIL SEPTEMBER 30, 2021:

In order for an appropriation to remain available for two fiscal years, 31 USC 1301 requires that the appropriation expressly provide that it is available after the fiscal year covered by the law in which it appears.

11. REVENUES FROM LICENSING FEES, INSPECTION SERVICES, AND OTHER SERVICES AND COLLECTIONS SHALL BE RETAINED AND BE AVAILABLE UNTIL SEPTEMBER 30, 2021, FOR NECESSARY SALARIES AND EXPENSES IN THIS ACCOUNT, NOTWITHSTANDING SECTION 3302 OF TITLE 31, UNITED STATES CODE:

Under 31 USC 9701, the NRC is authorized to collect user fees from any person who receives a service or thing of value from the Commission. Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the FY 2020 Congressional Budget Justification l 9

PROPOSED FY 2020 APPROPRIATIONS LEGISLATION Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities.

Title 31 USC 3302 requires the NRC to deposit all revenues collected to miscellaneous receipts of the Treasury unless specifically authorized by law to retain and use such revenue.

12. THE SUM HEREIN APPROPRIATED SHALL BE REDUCED BY THE AMOUNT OF REVENUES RECEIVED:

Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities.

13. AMOUNTS APPROPRIATED FOR INSPECTOR GENERAL SERVICES FOR THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD, WHICH SHALL NOT BE AVAILABLE FROM FEE REVENUES:

Pursuant to 42 USC 2214, the NRC is required to assess and collect user fees from any person who receives a service or thing of value from the Commission and annual charges from NRC licensees and certificate holders, with the exception of the holders of any license for a federally owned research reactor used primarily for educational training and academic research purposes. In accordance with amendments to 42 USC 2214, enacted in the Energy Policy Act of 2005, and consistent with this appropriations request, the aggregate annual amount of collected fees shall approximate 90 percent of the Commissions budget authority, less amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities. This proposed appropriations language makes clear that the $1,171,000 requested to provide Inspector General Services for the Defense Nuclear Facilities Safety Board is excluded from OBRA-90s fee recovery requirement in the same manner as amounts appropriated to the Commission from the Nuclear Waste Fund, amounts appropriated to the Commission to implement Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005, and amounts appropriated to the Commission for generic homeland security activities. The Consolidated Appropriations Act, 2014 (PL 113-

76) and the Consolidated and Further Continuing Appropriations Act, 2015 (PL 113-235) authorize the NRCs Inspector General to exercise the same authorities with respect to the Defense Nuclear Facilities Safety Board, as determined by the NRCs Inspector General, as the Inspector General exercises under the Inspector General Act of 1978 (5 USC App.) with respect to the NRC.

FY 2020 Congressional Budget Justification l 10

NUCLEAR REACTOR SAFETY NUCLEAR REACTOR SAFETY Nuclear Reactor Safety (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Business Line $M FTE $M FTE $M FTE $M FTE Operating Reactors 367.0 1,504.5 365.2 1,533.0 361.6 1,485.0 (3.6) (48.0)

New Reactors 95.7 381.2 94.1 386.0 87.8 339.0 (6.3) (47.0)

Total $462.6 1,885.7 $459.4 1,919.0 $449.5 1,824.0 $(9.9) (95.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, research activities within the Operating Reactors Business Line were funded $10.4 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

The NRCs Nuclear Reactor Safety Program encompasses licensing and overseeing civilian nuclear power reactors, research and test reactors, and medical radioisotope facilities in a manner that adequately protects public health and safety. This program also provides reasonable assurance of the security of facilities and protection against radiological sabotage.

This program contributes to the NRCs safety and security strategic goals through the activities of the Operating Reactors and New Reactors Business Lines that regulate existing and new nuclear reactors to ensure they meet all applicable requirements.

Overall resources requested in the FY 2020 budget for the Nuclear Reactor Safety Program are

$449.5 million, including 1,824 FTE. This funding level represents a decrease of $9.9 million, including 95 fewer FTE, when compared with the FY 2019 Enacted Budget. The budget request reflects reductions resulting from activities associated with the planned merger of the Office of Nuclear Reactor Regulation and the Office of New Reactors. Resources for the Nuclear Reactor Safety budget also include $15.5 million for the continued development of a regulatory infrastructure for advanced nuclear reactor technologies.

FY 2020 Congressional Budget Justification l 11

OPERATING REACTORS OPERATING REACTORS Operating Reactors by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE Event Response 14.4 47.0 18.0 48.0 16.9 45.0 (1.1) (3.0)

Generic Homeland Security 1.6 8.7 1.6 8.0 1.6 8.0 (0.0) 0.0 International Activities 3.4 19.0 3.6 19.0 3.4 18.0 (0.2) (1.0)

Licensing 75.1 384.6 82.6 376.0 78.3 372.0 (4.4) (4.0)

Oversight 112.6 498.2 114.2 536.0 115.5 520.0 1.3 (16.0)

Research 62.9 122.0 47.1 133.0 53.3 128.0 6.2 (5.0)

Rulemaking 8.9 40.0 9.6 47.0 7.5 38.0 (2.1) (9.0)

Mission Support and Supervisors 67.2 362.4 65.2 340.0 63.4 330.0 (1.8) (10.0)

Training 8.1 22.6 8.9 26.0 8.7 26.0 (0.2) 0.0 Travel 12.9 0.0 14.3 0.0 13.0 0.0 (1.4) 0.0 Total $367.0 1,504.5 $365.2 1,533.0 $361.6 1,485.0 $(3.6) (48.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, research activities within the Operating Reactors Business Line were funded $10.4 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

The Operating Reactors Business Line encompasses the regulation of 96 operating civilian nuclear power reactors and 31 research and test reactors in a manner that provides for reasonable assurance of adequate protection of public health and safety, and promotes the common defense and security.

The NRC establishes regulatory requirements for the design, construction, operation, and security of nuclear power plants, research and test reactors, and other nonpower production and utilization facilities (e.g., medical isotope production facilities), in accordance with the provisions of the Atomic Energy Act of 1954, as amended. Through the activities of this business line, the NRC implements programs to meet its safety and security strategic goals in protecting both the public and workers from the radiation hazards of nuclear reactors. To ensure that plants and facilities are operating safely, the NRC licenses the plants to operate and the personnel who operate the plants. The NRC also supports nuclear safety through rulemaking, research, enforcement, and international activities.

The NRC provides continuing oversight of civilian nuclear reactors and verifies operator adherence to the NRCs rules and regulations. The NRC has established requirements to ensure the security of the Nations nuclear facilities. Nuclear power plants must be able to defend successfully against a set of hypothetical threats that the agency refers to as the FY 2020 Congressional Budget Justification l 13

OPERATING REACTORS design-basis threat. These hypothetical threats challenge a plants physical security, personnel security, and cybersecurity. The agency continuously evaluates this set of hypothetical threats against real-world intelligence to ensure safety and security.

Figure 3: U.S. Operating Commercial Nuclear Power Reactors Anticipated To Be Operating as of October 1, 2019 FY 2020 Congressional Budget Justification l 14

OPERATING REACTORS CHANGES FROM FY 2019 ENACTED BUDGET Resources decrease as a result of (1) the closure of Oyster Creek Nuclear Generating Station and the announced closure of the Pilgrim and Three Mile Island nuclear generating stations, (2) a reduction in the number of States requiring potassium iodide replenishment (seven States instead of nine States), (3) efficiencies in processing licensing actions, (4) the completion of flooding and integrated assessment work related to lessons learned from the accident at Fukushima Dai-ichi in Japan, (5) decreased workload for the Decommissioning Transition Rulemaking, (6) the expected completion of the Non-Power Production and Utilization License Renewal Rulemaking, (7) increased accuracy in travel budget estimates to align with projected workload, and (8) efficiencies gained from the merger of the Office of Nuclear Reactor Regulation and the Office of New Reactors.

The resources for research activities increase when compared with the FY 2019 Enacted Budget; however, they decrease when compared to the FY 2019 Total Budget Authority. This variance is because $10.4 million of research activities was funded in FY 2019 through the application of authorized prior-year carryover. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, which provides a comparison of the FY 2020 request to the FY 2019 Budget Authority. IT resources increase within the Oversight Product Line as a result of an adjustment of resources from the Corporate Support Business Line to properly align Technical Library subscriptions and operations and maintenance of the Safeguards Local Area Network/Electronic Safe with the mission area these resources support.

The decrease in the Rulemaking Product Line includes a shift of resources to the Licensing Product Line for work under the regulatory guide update program.

Generally, resources budgeted in the Licensing and Oversight Product Lines impact fees for service. All other resources impact annual fees.

MAJOR ACTIVITIES The major activities within the Operating Reactors Business Line include the following:

Ensure that licensed operating nuclear power reactors operate in accordance with the NRCs rules, regulations, and licensing requirements for safety and security. The Reactor Oversight Process uses both NRC inspection findings and performance indicators from licensees to assess the safety performance of each plant.

Conduct license renewal safety and environmental reviews in accordance with published schedules, including completing the review of three subsequent license renewal applications for six units (Turkey Point Nuclear Plant, Units 3 and 4, Peach Bottom Atomic Power Station, Units 2 and 3, and Surry Power Station, Units 1 and 2).

Support the continued implementation of the Tier 1 lessons learned from the Fukushima accident. Requested resources will support the completion of the review and oversight associated with licensees implementation of the Mitigation of Beyond-Design-Basis Events Rule and continued implementation of the order related to severe-accident-capable hardened vents, as well as the review of licensee responses to the requests for information associated with seismic hazard reevaluations.

FY 2020 Congressional Budget Justification l 15

OPERATING REACTORS Complete approximately 700 licensing actions, including license amendment requests related to risk-informed initiatives such as adopting standard technical specifications, implementing Title 10 of the Code of Federal Regulations (10 CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, digital instrumentation and controls, and power uprates.

Enhance reviewer guidance and perform knowledge management and training activities to increase the staffs capabilities to use risk-informed decision-making and focus on areas of higher risk significance.

Perform project management activities and ensure that operators are qualified and licensed to perform their duties for the 96 operating power reactors and 31 licensed operating research and test reactors.

Streamline the license renewal process for certain classes of nonpower production and utilization facilities.

Conduct operating license application reviews for two proposed medical radioisotope (molybdenum-99) facilities, Northwest Medical Isotopes, LLC (NWMI) and SHINE Medical Technologies, Inc. (SHINE), and provide oversight of their construction.

Conduct preapplication activities for reviews of license amendment applications requesting conversion from high-enriched uranium to low-enriched uranium fuel at research reactors.

Conduct nine high-priority rulemakings and three medium-priority rulemakings as directed by the Commission, and continue the review of petitions for rulemaking.

Complete approximately 300 other licensing tasks, including licensing-basis reviews, license renewal commitment reviews, and quality assurance and emergency plan reviews. Continue developing the licensing infrastructure for the review of accident tolerant fuel designs.

Support cybersecurity program implementation, oversight, and program and policy issues.

Provide potassium iodide replenishment to seven States.

Conduct confirmatory and anticipatory research on topics such as seismic and structural stability; fire safety; probabilistic risk assessment (PRA), including human reliability; digital instrumentation and controls and electrical systems safety; materials performance; probabilistic assessment of reactor component integrity; aging management of operating reactors; fuel performance, including accident tolerant fuel; codes and standards; development and maintenance of analytical tools that support radiation protection, risk, severe accident, consequence, and thermal-hydraulic assessments; evaluation of operational experience; evaluation of generic issues; evaluation of external hazards, including flooding; and human factors analysis. Continue management of the regulatory guide and generic issues programs.

FY 2020 Congressional Budget Justification l 16

OPERATING REACTORS Satisfy international treaty and convention obligations, as well as statutory mandates.

This includes serving as the U.S. lead for implementing the Convention on Nuclear Safety, leading and contributing to multilateral efforts on key nuclear safety and security issues and ensuring appropriate representation at U.S.-led interagency initiatives.

Participate in international nuclear safety peer review missions (e.g., Integrated Regulatory Review Service (IRRS)), exchange information (including regulatory best practices) with established regulatory counterparts bilaterally and multilaterally, and participate in or lead international nuclear safety research activities.

FY 2020 Congressional Budget Justification l 17

OPERATING REACTORS License Renewal and Medical Radioisotope Facility Review Schedule1 Project FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 License Renewal Clinton Comanche New Applications Peak 1&2 Indian Point2 Seabrook2,3 Ongoing Complex Seabrook4 Reviews (resulting from hearings or technical issues)

Ongoing River Bend River Bend2 Clinton Clinton2 Noncomplex Waterford Waterford2 Comanche Reviews (i.e., no Peak 1&2 hearings or technical issues)

Subsequent License Renewal New Applications Peach Bottom Surry North Anna North Ongoing Peach Bottom Turkey Point 2,4 Surry2 Anna2 Noncomplex Turkey Point 4 Surry Reviews (i.e., no Peach Bottom2 hearing)

Medical Radioisotopes SHINE OL Oregon State Unnamed NWMI OL Amendment Nonpower (associated Reactor New Applications with NWMI) Amendment (associated with NWMI)

SHINE OL SHINE OL2 Oregon Unnamed NWMI OL NWMI OL2 State Nonpower Amendment Reactor (associated Amendment Ongoing Reviews with (associated NWMI)2 with NWMI)2 Note: This schedule is subject to change and may not align with the budget because of schedule changes after the budget was formulated.

1 Budgeting for the license renewal and medical radioisotope facility applications is based on information received from applicant correspondence or responses to NRC-issued regulatory information summaries (RISs).

2 The review has been or is expected to be completed in the FY shown.

3This is related to the resolution of technical issues related to the alkali silica reaction. Acronyms 4 Work began in FY 2018.

SHINESHINE Medical Technologies, Inc.

NWMINorthwest Medical Isotopes, LLC OLoperating license FY 2020 Congressional Budget Justification l 18

OPERATING REACTORS Status of Reactors Transitioning from Operating to Decommissioning Site FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 Site Is with Site Is with Site Is with Site Is with Decommissioning Decommissioning Decommissioning Decommissioning Transitioning Site Transfer Is Group in Group in Group in Group in Ft. Calhoun Year Complete Decommissioning Decommissioning Decommissioning Decommissioning and LLW and LLW Business and LLW Business and LLW Business Business Line Line Line Line Site Is with Site Is with Site Is with Shut Down Decommissioning Decommissioning Decommissioning October 2018 Oyster Site Transfer Is Group in Group in Group in Operating (FY 2019)

Creek Complete Decommissioning Decommissioning Decommissioning Transitioning and LLW Business and LLW Business and LLW Business Year Line Line Line Expected to Site Is with Site Is with Site Is with Shut Down Decommissioning Decommissioning Decommissioning June 1, 2019 Site Transfer Is Group in Group in Group in Pilgrim Operating (FY 2019) Complete Decommissioning Decommissioning Decommissioning Transitioning and LLW Business and LLW Business and LLW Business Year Line Line Line Expected to Site Is with Site Is with Site Is with Shut Down Decommissioning Decommissioning Decommissioning September 29, Three Mile Site Transfer Is Group in Group in Group in Operating 2019 Island Complete Decommissioning Decommissioning Decommissioning (FY 2019) and LLW Business and LLW Business and LLW Business Transitioning Line Line Line Year Site Is with Expected to Decommissioning Shut Down Indian Transitioning Year Site Transfer is Group in Operating Operating April 2020 Point 2 until Indian Point 3 Complete Decommissioning (FY 2020)

Shuts Down and LLW Business Transitioning Year Line Site Is with Site Is with Expected to Decommissioning Decommissioning Shut Down Davis Site Transfer Is Group in Group in Operating Operating May 2020 Besse Complete Decommissioning Decommissioning (FY 2020) and LLW Business and LLW Business Transitioning Year Line Line Site Is with Expected to Decommissioning Shut Down Indian Site Transfer Is Group in Operating Operating Operating April 2021 Point 3 Complete Decommissioning (FY 2021) and LLW Business Transitioning Year Line Site Is with Expected to Decommissioning Shut Down Site Transfer Is Group in Perry Operating Operating Operating May 2021 Complete Decommissioning (FY 2021) and LLW Business Transitioning Year Line Expected to Site Is with Shut Down Decommissioning May 2021 Beaver Site Transfer Is Group in Operating Operating Operating (FY 2021)

Valley 1 Complete Decommissioning Transitioning Year and LLW Business until Beaver Valley Line 2 Shuts Down FY 2020 Congressional Budget Justification l 19

OPERATING REACTORS Site FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 Expected to Site is with Shut Down Decommissioning Beaver October 2021 Group in Operating Operating Operating Operating Valley 2 (FY 2022) Decommissioning Site Transfer is and LLW Business Complete Line Expected to Shut Down Site Transfer Is Palisades Operating Operating Operating Operating May 31, 2022 Complete (FY 2022)

Transitioning Year Note: Duane Arnold is expected to shut down in September 2020 but is not included in the table because the NRC has not received official notification.

Data as of November 29, 2018. The status of the plants transitioning from operating to decommissioning is subject to change.

FY 2020 Congressional Budget Justification l 20

OPERATING REACTORS SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Operating Reactors Business Line include the following:

Developed, in conjunction with stakeholders, and issued a project plan to support the review of licensing applications for accident tolerant fuel.

Completed reviews of applications to use a risk-informed program (10 CFR 50.69) at the Limerick and Vogtle nuclear power plants that allows for a graded approach to the treatment and procurement of plant systems.

Issued revised guidance for 10 CFR 50.59 evaluations of digital instrumentation and controls (RIS 2002-22, Supplement 1, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems, dated May 31, 2018) and supported workshops to better enable licensees to implement digital modifications without prior NRC approval.

Began the review of the subsequent license renewal applications for Turkey Point and Peach Bottom nuclear power plants. These applications are the first to request to operate for an additional 20 years beyond their current, already renewed operating licenses.

Completed the review of the license renewal application for Indian Point Nuclear Generating Units Nos. 2 and 3, which brings the total number of renewals to 91 reactor units.

Published the Operating Reactors dashboard of NRC Performance on the NRC's public Web site, which is intended to offer a user-friendly look at the staffs progress toward meeting established performance criteria.

Issued a construction permit to Northwest Medical Isotopes, LLC for a molybdenum-99 radioisotope facility in Columbia, MO.

Implemented and oversaw Joint Composite Adversary Force selection, training, qualification, and exercises for two licensees, as well as the scheduled Force-on-Force exercises throughout the operating reactor fleet.

Conducted via webinar the first virtual" Annual Assessment Meeting under the Reactor Oversight Process at Salem Nuclear Generating Station/Hope Creek Generating Station.

Provided oversight of licensees implementation of the post-Fukushima severe-accident-capable hardened vent order (EA-13-109). A milestone was achieved as the final operating power reactor, FitzPatrick Nuclear Power Plant, achieved compliance with Phase 1 (wetwell vent) of this order.

Provided oversight of licensees implementation of the post-Fukushima mitigating strategies order (EA-12-049). A milestone was achieved as the final operating power reactor, Quad Cities Units 1 and 2, achieved compliance with this order.

FY 2020 Congressional Budget Justification l 21

OPERATING REACTORS Issued the assessment of the Cooper Nuclear Station flood hazard mitigating strategies assessment, the first flood mitigating strategies assessment using a targeted hazard mitigating strategy.

Coordinated with other Federal agencies to support the States affected by Hurricane Florence by monitoring the assessment of offsite infrastructure and response capabilities prior to support of the restart of the Brunswick Station.

Participated in the Eagle Horizon 2018 National-Level Exercise, which included activation of the continuity of operations plan.

Leveraged international cooperation through computer code development and maintenance programs, including thermal-hydraulics code applications and maintenance, cooperative severe accident research, and the radiation protection computer code and maintenance program, while enhancing controls against the misuse of NRC nuclear safety codes.

Led and supported U.S. Government delegations in international meetings addressing the Convention on Nuclear Safety, the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, and the Convention on the Physical Protection of Nuclear Material. Served on multiple International Atomic Energy Agency (IAEA) regulatory peer review missions and guidance committees.

Participated in high-level U.S. Government nuclear safety and security initiatives in collaboration with U.S. executive branch agencies and foreign regulatory counterparts through activities such as the Nuclear Suppliers Group and Joint Standing Committees on Nuclear Energy Cooperation.

Provided training and capacity building to the Japan Nuclear Regulation Authority as the country transitions to a new inspection framework modeled on the NRCs Reactor Oversight Process.

Conducted license renewal workshops and provided aging management support to Chinas National Nuclear Safety Administration and Mexicos National Commission for Nuclear Safety and Safeguards. During the workshops, the NRC shared information on nuclear power plant aging management and license renewal activities in the United States. This information will assist China and Mexico as they review their first license renewal applications.

Led teams of international experts to complete IAEA IRRS missions to Belgium, France, and Hungary. These IRRS missions reviewed the hosts regulatory frameworks for nuclear and radiation safety and compared the frameworks against the IAEA safety standards.

Processed 12 escalated enforcement actions, with five of the escalated actions supported through an investigation by the NRCs Office of Investigations. Issued two confirmatory orders, one to Millstone and one to Grand Gulf.

Published NUREG/CR-7237, Correlation of Seismic Performance in Similar SSCs (Structures, Systems, and Components), issued December 2017, as part of the methodology of seismic PRA for nuclear power plants.

FY 2020 Congressional Budget Justification l 22

OPERATING REACTORS Published a joint NRC/Electric Power Research Institute report, NUREG/CR-7150, Joint Assessment of Cable Damage and Quantification of Effects from Fire (JACQUE-FIRE),

Volume 3, Technical Resolution to Open Issues on Nuclear Power Plant Fire-Induced Circuit Failure, issued November 2017, to better understand failure modes that might occur in electrical control circuits of nuclear power plants as a result of fire damage to electric cables.

OTHER INDICATORS LICENSING Number of License Renewal Applications (Units) on which Final Decision Has Been Made* (OR-01)

Fiscal Year Target Actual Comment FY 2014 0 0

    • The FY 2015 Congressional Budget Justification target was shown as 9 in error.
      • Byron Units 1 and 2 and Braidwood Units 1 and 2 rescheduled for FY 2015 7** 5*** FY 2016.

Diablo Canyon was expected to be completed in FY 2016 but was delayed, and the application has now been suspended. Other units, such as Fermi 2, Grand Gulf, and Seabrook, were expected to be completed in FY 2016 but were all delayed as a result of technical FY 2016 7 5 issues.

The target was not met as result of the licensees decision to FY 2017 7 6 discontinue pursuit of the Diablo Canyon license renewal.

FY 2018 1 2 FY 2019 1 FY 2020 2

Percentage of Licensing Actions Completed in 1 Year or Less* (OR-03)

Fiscal Year Target Actual Comment FY 2014 95 87 Because of the redirection of resources to process the Fukushima-related licensing actions and other licensing tasks, which had completion schedules extending into 2017, the indicator target was not met. The NRC has developed a staffing strategy to identify resources and critical skills needed to address the gap between the FY 2015 95 88 budgeted number of staff and those who are currently on board.

FY 2016 95 95 FY 2017 95 96 FY 2018 95 98 FY 2019 95 FY 2020 95

  • Excludes improved Standard Technical Specification conversions, licensing actions associated with the Fukushima Near-Term Task Force (NTTF) recommendations (beginning in FY 2014), and power uprates. Also excludes license amendment requests that are unusually complex.

FY 2020 Congressional Budget Justification l 23

OPERATING REACTORS Percentage of Licensing Actions Completed in 2 Years or Less* (OR-04)

Fiscal Year Target Actual Comment FY 2014 100 99 Because of the redirection of resources to process the Fukushima-related licensing actions and other licensing tasks, which had completion schedules extending into 2017, the indicator target was not met. The NRC has developed a staffing strategy to identify resources and critical skills needed to address the gap between the FY 2015 100 99 budgeted number of staff and those who are currently on board.

FY 2016 100 100 This target was not met as a result of the need to resolve the technical FY 2017 100 99 adequacy of applications to risk-inform technical specifications.

FY 2018 100 100 FY 2019 100 FY 2020 100

  • Excludes improved Standard Technical Specification conversions, licensing actions associated with the Fukushima NTTF recommendations (beginning in FY 2014), and power uprates. Also excludes license amendment requests that are unusually complex.

Percentage of Other Licensing Tasks Completed in 1 Year or Less* (OR-07)

Fiscal Year Target Actual Comment FY 2014 90 87 Because of the redirection of resources to process the Fukushima-related licensing actions and other licensing tasks, which had completion schedules extending into 2017, the indicator target was not met. The NRC has developed a staffing strategy to identify resources and critical skills needed to address the gap between the FY 2015 90 87 budgeted number of staff and those who are currently on board.

FY 2016 90 90 FY 2017 90 100 FY 2018 90 98 FY 2019 90 FY 2020 90

  • Excludes multiplant actions, licensing tasks associated with the Fukushima NTTF recommendations (beginning in FY 2014), and other unusually complex licensing tasks.

Percentage of Other Licensing Tasks Completed in 2 Years or Less* (OR-08)

Fiscal Year Target Actual Comment FY 2014 100 99 Because of the redirection of resources to process the FY 2015 100 97 Fukushima-related licensing actions and other licensing tasks, which had completion schedules extending into 2017, the indicator target was not met. The NRC has developed a staffing strategy to identify resources and critical skills needed to address the gap between the FY 2016 100 99 budgeted number of staff and those who are currently on board.

FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100

  • Excludes multiplant actions, licensing tasks associated with the Fukushima NTTF recommendations (beginning in FY 2014), and other unusually complex licensing tasks.

OVERSIGHT Percentage of Plants for which All Required Baseline Inspection Procedures Are Completed (OR-12.1)

Fiscal Year Target Actual Comment FY 2018 99 100 New target in FY 2018 (replacing OR-12).

FY 2019 99 FY 2020 99 FY 2020 Congressional Budget Justification l 24

OPERATING REACTORS Percentage of Final Significance Determinations Made within 90 Days for All Potentially Greater Than Green Findings (OR-13)

Fiscal Year Target Actual Comment The 90-day target was exceeded by 1 day for one action because of FY 2014 90 86 one particularly complicated issue.

The target was not met because of the complexity of the flooding issues FY 2015 90 88 associated with Arkansas Nuclear One Units 1 and 2.

FY 2016 90 100 FY 2017 90 100 The target was not met as a result of exceeding the 90-day target for a white finding at the Clinton Power Station. The staff made the decision to exceed the target by 2 weeks to take the necessary time for the staff to conduct a thorough review of the high volume of additional FY 2018 90 83 information provided by the licensee.

FY 2019 90 FY 2020 90 Percentage of Technical Allegation Reviews Completed in 180 Days or Less (OR-15)

Fiscal Year Target Actual Comment FY 2014 95 99 FY 2015 95 99 FY 2016 95 99 FY 2017 95 99 FY 2018 95 99 FY 2019 95 FY 2020 95 Percentage of Technical Allegation Reviews Completed in 360 Days or Less (OR-16)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 Percentage of Enforcement Actions Where No Investigation Is Involved Completed in 160 Days or Less (OR-17)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 87 Three cases missed the metric because of the complexity of each case.

FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 FY 2020 Congressional Budget Justification l 25

OPERATING REACTORS Percentage of Enforcement Actions Where Investigation Is Involved Completed in 330 Days or Less (OR-18)

Fiscal Year Target Actual Comment FY 2014 100 100 One case missed the metric because the case included an investigation to determine whether willfulness was involved on the part of licensee FY 2015 100 86 employees.

FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 Percentage of Investigations That Developed Sufficient Information To Reach a Conclusion Regarding Wrongdoing Completed in 12 Months or Less* (OR-19)

Fiscal Year Target Actual Comment FY 2014 80 84 FY 2015 80 98 FY 2016 80 95 FY 2017 80 97 FY 2018 80 95 FY 2019 85 FY 2020 85

  • Target for FY 2013 and FY 2014 was 9 months or less. The increase of time from 9 to 12 months reflects the implementation of added quality assurance checks during an investigation and the need to ensure that due professional care is used in conducting investigations and preparing related reports, as outlined in the Council of Inspectors General on Integrity and Efficiencys Quality Standards for Investigations, dated November 15, 2011.

Percentage of Investigations Completed in Time To Initiate Civil and/or Criminal Enforcement Action (OR-20)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 FY 2020 Congressional Budget Justification l 26

OPERATING REACTORS RESEARCH Combined Score on a Scale of 1 to 5 for the Technical Quality of Agency Research Technical Products*

(OR-23)

Fiscal Year Target Actual Comment FY 2014 3.75 4.42 FY 2015 3.75 4.66 FY 2016 3.75 4.43 FY 2017 3.75 4.50 FY 2018 Discontinued Indicator to be tracked internally.

Reintroduced in FY 2019. The Technical Quality Survey was discontinued in FY 2018 because of the low response rate. The agency reexamined its performance indicators and believes the Technical Quality Survey indicator provides the best quality measure for research products. The agency is focused on improving the response rate for the surveys and will explore revising the survey FY 2019 4.0 questions to enhance the value of this tool.

FY 2020 4.0

  • The NRC has developed a process to measure the quality of research products on a five-point scale using surveys of end users to determine the usability and value-added of the products. As appropriate, the NRC will develop and add other mechanisms of this process to measure the quality of research products.

DISCONTINUED INDICATORS Number of Licensing Actions Completed* (OR-02)

Fiscal Year Target Actual Comment FY 2014 900 607 737 license amendment requests were submitted in FY 2014.

FY 2015 900 792 736 license amendment requests were submitted in FY 2015.

FY 2016 900 837 754 license amendment requests were submitted in FY 2016.

FY 2017 900 967 905 license amendment requests were submitted in FY 2017.

FY 2018 700 861 835 license amendment requests were submitted in FY 2018.

FY 2019 700 The timeliness metrics associated with licensing actions are better indicators of staff performance. This metric is dependent on the number of licensing actions submitted by licensees in the prior year and not solely on staff performance. Given that the NRC expects up to 10 plants to shut down over the next 4 years, combined with the potential implementation of the Decommissioning Rulemaking in FY 2020 (which could reduce the number of licensing actions required to transition to decommissioning), the number of actions that will be FY2020 Discontinue submitted cannot be estimated with sufficient accuracy.

  • As limited by the number of licensing action requests submitted or accepted the previous FY.

Percentage Increase in the 12-Month Average Percent of Licensing Actions Less Than 1 Year Old for FY 2017 Compared with the Percent of Licensing Actions Less Than 1 Year Old on September 30, 2016*

(OR-05)

Fiscal Year Target Actual Comment FY 2014 New indicator in 2016 FY 2015 FY 2016 2 7 The target does not apply because the inventory is greater than FY 2017 2 N/A 93 percent.

Indicator was for tracking progress in reducing licensing action FY 2018 Discontinued* backlogs that were present in previous FYs.

FY 2019 N/A FY 2020 N/A

  • This target will not apply if the inventory of licensing actions less than 1 year old on September 30 is 93 percent or greater.

FY 2020 Congressional Budget Justification l 27

OPERATING REACTORS Number of Other Licensing Tasks Completed* (OR-06)

Fiscal Year Target Actual Comment FY 2014 500 765 577 other licensing tasks were submitted in FY 2014.

FY 2015 500 461 599 other licensing tasks were submitted in FY 2015.

FY 2016 500 641 597 other licensing tasks were submitted in FY 2016.

FY 2017 500 644 655 other licensing tasks were submitted in FY 2017.

226 other licensing tasks were submitted in FY 2018.

The NRC revised the definition of other licensing tasks during FY 2016 to more accurately reflect the Congressional Budget Justification definition and remove actions that the staff initiates and keep actions that result from licensee submittals. This revision decreased the number of actions counted as other licensing tasks for FY 2017. The target for FY 2018 more accurately reflects expected other licensing FY 2018 300 362 tasks completed under this new definition.

FY 2019 300 The timeliness metrics associated with licensing actions are better indicators of staff performance. This metric is dependent on the number of licensing actions submitted by licensees in the prior year and not solely on staff performance. Given that the NRC expects up to 10 plants to shut down over the next 4 years, combined with the potential implementation of the Decommissioning Rulemaking in FY 2020 (which could reduce the number of licensing actions required to transition to decommissioning), the number of actions that will be FY 2020 Discontinue submitted cannot be estimated with sufficient accuracy.

  • As limited by the number of other licensing task requests submitted or accepted the previous FY.

Percentage Increase in the 12-Month Average Percent of Other Licensing Tasks Less Than 1 Year Old for FY 2017 Compared with the Percent of Other Licensing Tasks Less Than 1 Year Old on September 30, 2016* (OR-09)

Fiscal Year Target Actual Comment FY 2014 New indicator in 2016 FY 2015 FY 2016 2 3 The target does not apply because the inventory is greater than FY 2017 2 N/A 93 percent.

FY 2018 Discontinued The indicator was for FY 2016 and FY 2017 only.

FY 2019 N/A FY 2020 N/A

  • This target will not apply if the inventory of licensing actions less than 1 year old on September 30 is 93 percent or greater.

Number of Initial Operator Licensing Examination Sessions* (OR-10)

Fiscal Year Target Actual Comment FY 2014 55 55 FY 2015 53 42 42 requests for examination sessions were received in FY 2015.

FY 2016 46 40 40 requests for examination sessions were received in FY 2016.

FY 2017 47 41 41 requests for examination sessions were received in FY 2017.

FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • Targets are based upon the nuclear industrys projected demand for initial operator licensing examination sessions.

FY 2020 Congressional Budget Justification l 28

OPERATING REACTORS Number of Generic Fundamentals Examination Sessions Administered (OR-11)

Fiscal Year Target Actual Comment FY 2014 4 4 FY 2015 4 4 FY 2016 4 4 FY 2017 2 3 Three requests for examination sessions were received in FY 2017.

FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A Number of Plants for which All Required Baseline Inspection Procedures Are Completed* (OR-12)

Fiscal Year Target Actual Comment FY 2014 100 100 A fifth operating reactor entered the decommissioning phase at the FY 2015 99 99 beginning of FY 2015.

The increase from 99 to 100 accounts for the startup operation of Watts FY 2016 100 100 Bar Nuclear Plant, Unit 2 in FY 2016.

FY 2017 99 99 Fort Calhoun Station shut down, leaving 99 operating reactors.

FY 2018 Discontinued Replaced by OR-12.1.

FY 2019 N/A FY 2020 N/A

  • The baseline inspection program metric includes the number of reactors in operation.

Percentage of Technical Allegation Reviews Completed in 150 Days or Less (OR-14)

Fiscal Year Target Actual Comment FY 2014 90 97 FY 2015 90 98 FY 2016 90 97 FY 2017 90 97 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A Percentage of Proposed Final Rules Completed in Accordance with Schedules Approved by the Commission (OR-21)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 80 100 FY 2017 80 100 FY 2018 80 100 FY 2019 80 FY 2020 Discontinue Indicator to be tracked internally.

Percentage of Major Milestones for Critical Research Programs Completed On or Before Their Due Date*

(OR-22)

Fiscal Year Target Actual Comment FY 2014 90 100 FY 2015 90 100 FY 2016 90 100 FY 2017 90 100 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • Critical research programs typically respond to high-priority needs from the Commission and the NRCs licensing organizations. Critical research programs will be the highest priority needs identified at the beginning of each FY.

FY 2020 Congressional Budget Justification l 29

OPERATING REACTORS Percentage Assessment of the Agency's Readiness To Respond to a Nuclear or Terrorist Emergency Situation or Other Events of National Interest* (OR-24)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 Discontinue Indicator to be tracked internally.

  • This performance index provides a single overall performance indicator of the agencys readiness to respond to a nuclear or terrorist emergency situation or other events of national interest. The index measures several activities within the Incident Response Program that are critical to support the agencys preparedness and response ability.

Percentage of Information Assessment Team Advisories Issued within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of Notification (OR-25)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 No threat met the threshold for the issuance of an Information FY 2016 90 100 Assessment Team for FY 2016.

No threat met the threshold for the issuance of an Information FY 2017 90 100 Assessment Team for FY 2017.

FY 2018 90 100 FY 2019 90 This indicator is no longer useful as the NRC has issued no Information FY 2020 Discontinue Assessment Team Advisories since 2014.

FY 2020 Congressional Budget Justification l 30

NEW REACTORS NEW REACTORS New Reactors by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE International Activities 1.1 6.1 1.0 5.0 0.8 4.0 (0.2) (1.0)

Licensing 44.5 188.2 39.7 167.0 33.8 133.0 (6.0) (34.0)

Oversight 12.4 66.6 14.9 75.0 12.9 66.0 (2.0) (9.0)

Research 17.7 29.1 14.6 33.0 19.2 47.0 4.6 14.0 Rulemaking 1.2 6.2 1.9 10.0 1.7 9.0 (0.2) (1.0)

Mission Support and Supervisors 14.4 77.7 16.9 87.0 14.1 71.0 (2.8) (16.0)

Training 2.4 7.3 2.8 9.0 2.7 9.0 (0.0) 0.0 Travel 1.8 0.0 2.3 0.0 2.6 0.0 0.3 0.0 Total $95.7 381.2 $94.1 386.0 $87.8 339.0 $(6.3) (47.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

The New Reactors Business Line is responsible for licensing and overseeing the design, siting, and construction of new nuclear power reactors, including small modular reactors (SMRs) and advanced reactors. The new reactors activities ensure that new civilian nuclear power reactor facilities are developed in a manner that protects the health, safety, and security of the public in an efficient manner.

The NRC reviews new nuclear power reactor design certification (DC), combined license (COL),

and early site permit (ESP) applications, consistent with 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants. By issuing a COL, the NRC authorizes the licensee to construct and, with specified conditions, operate a nuclear power plant at a specific site.

The NRC also reviews construction permit and operating license applications for new nuclear power reactors, consistent with 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities. The application process regulated under 10 CFR Part 50which was implemented for all currently operating reactorsinvolves separate applications for the issuance of construction permits and operating licenses.

The NRC continues to perform technical reviews of large, light-water reactors (LLWR) and SMR applications and conduct regulatory oversight of construction activities. These activities include inspecting component suppliers and plants under construction. The NRC continues to interact with vendors about prospective SMR and advanced reactor applications and to refine regulatory processes to prepare for reviewing these potential applications.

FY 2020 Congressional Budget Justification l 31

NEW REACTORS CHANGES FROM FY 2019 ENACTED BUDGET Resources decrease as a result of (1) a delay in the receipt of the Utah Associated Municipal Power System (UAMPS) SMR application and withdrawal of the Blue Castle LLWR application, (2) a delay in the submittal of the Advanced Passive 1000 (AP1000) DC renewal application, (3) the near completion of the NuScale DC review, (4) the completion of the Clinch River ESP technical review (only the mandatory hearing is projected to be completed in FY 2020), (5) the anticipated reduced number of license amendment requests as the units for Vogtle Electric Generating Plant (Vogtle) near completion, (6) the reduced demand for operator licensing work as the support will be limited to Vogtle Units 3 and 4, (7) lower project management costs now that enterprisewide contracts are in place, (8) delays in 10 CFR Part 50 construction and operating license application review activities for Bellefonte Nuclear Station, Units 1 and 2, (9) efficiencies in the areas of enforcement, vendor inspection, and emergency planning and security, and (10) efficiencies gained from the merger of the Office of Nuclear Reactor Regulation and the Office of New Reactors.

The increase in the Research Product Line primarily results from an increase in workload in the area of advanced nuclear reactors technologies in order to accelerate readiness activities consistent with stakeholder plans and readiness. The small increase in the Travel Product Line results from increased field work and meetings associated with the licensees planned completion of construction and the resultant NRC 10 CFR 52.103(g) finding for Vogtle Unit 3.

Generally, resources budgeted in the Licensing and Oversight Product Lines impact fees for service. All other resources impact annual fees.

MAJOR ACTIVITIES The major activities within the New Reactors Business Line include the following:

Perform construction inspection activities at the two reactors units under construction (Vogtle Units 3 and 4).

Develop infrastructure for advanced reactors at a rate consistent with NRC projections for interest in new technologies and cognizance of the industrys plans.

Continue the reviews for two DC applications for NuScale (SMR) and the U.S. Advanced Pressurized-Water Reactor (US-APWR) (LLWR).

Continue the review of one DC renewal application for the General Electric-Hitachi Advanced Boiling-Water Reactor (ABWR) design (LLWR).

Review one ESP application for the Clinch River site (SMR).

Conduct preapplication activities for one COL application (UAMPS).

Perform activities related to the advanced reactor preapplication and review for one anticipated custom COL application.

Review license amendments for post-COL activities.

FY 2020 Congressional Budget Justification l 32

NEW REACTORS Inspect vendors supplying products and services as part of a formal agencywide program to monitor and evaluate counterfeit, fraudulent, and suspect items.

Conduct two high-priority rulemakings and three medium-priority rulemakings as directed by the Commission, and review petitions for rulemaking.

Provide research support for LLWR and SMR DC reviews and analyses, including the development of new reactor plant risk models; seismic, geotechnical, and structural engineering studies; probabilistic seismic hazard assessments; tsunami studies; the probabilistic flood hazard assessment framework; an independent assessment of thermal-hydraulics system responses and severe accidents; and pipe-rupture acceptance criteria. Resources also support the development of guidance for human factors reviews and efforts to maintain and develop codes and models.

Provide international support for the continued participation in the Multinational Design Evaluation Program that will potentially enhance safety at U.S. sites through international exchanges of licensing, construction inspection, and commissioning activities.

Continue to implement strategic bilateral and multilateral cooperation with countries on the regulatory oversight of AP1000 reactor construction. The program also supports IAEA activities, such as those related to generic SMR issues, standards development, and consultancy meetings. In addition, the program supports Nuclear Energy Agency activities, such as those related to new reactor design and commissioning.

Complete the plan for the transition of regulatory oversight as the new AP1000 units move from construction to operation.

FY 2020 Congressional Budget Justification l 33

NEW REACTORS 7

Number of New Reactor Applications under Review 6

6 5

5 4 4 4 4

3 3 3 3 3

2 2 2

1 1 1 1 1 1

0 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Combined License Design Certification Early Site Permit Figure 4: New Reactor Applications under Review FY 2020 Congressional Budget Justification l 34

NEW REACTORS New Reactor Applications under Review New FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Reactor Reviews Bell Lee Lee Unnamed COL Bend Station Station Applicant Lee Levy North (Advanced Station County Anna Reactor)**

Levy North Turkey County Anna Point North South Anna Texas South Project Texas Turkey Project Point Turkey Point U.S. US- US- US- US- US-DC EPR APWR APWR APWR APWR APWR US- ABWR ABWR ABWR ABWR ABWR APWR KHNP KHNP KHNP NuScale NuScale KHNP (APR- (APR- (APR-(APR- 1400) 1400) 1400) 1400) NuScale* NuScale NuScale PSEG PSEG TVA TVA TVA TVA ESP TVA Clinch Clinch Clinch Clinch Clinch River River River River River*

  • Preapplication review
    • Unnamed applicant. The NRC received a proprietary letter on July 22, 2018.

FY 2020 Congressional Budget Justification l 35

NEW REACTORS SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the New Reactors Business Line include the following:

Completed the mandatory hearing for the Turkey Point COL application and subsequently issued the licenses.

Completed the Advanced Power Reactor 1400 (APR1400) DC review within the scheduled 42 months.

Issued the draft safety evaluation in response to a request for exemption to the requirements for emergency preparedness for the Clinch River ESP application. Issued the draft environmental impact statement for the Clinch River ESP application for comment.

Completed Phase 1 of six phases in the NuScale DC application review.

Issued a license amendment for Vogtle that revised the criteria for design and licensing changes that require prior NRC approval (Tier 2).

Developed an Integrated Project Plan that will ensure coordinated and timely consideration of activities associated with the completion of construction, initial testing, implementation of operational programs, and transition to operations for Vogtle Units 3 and 4, including inspections, tests, analyses, and acceptance criteria closure notifications and licensing actions.

Observed preoperational and startup testing at the Sanmen Nuclear Power Plant in China, the first AP1000 to begin commercial power operations, which provided the NRC with unique insights about AP1000 startup issues that will facilitate NRC oversight of the construction and commissioning of the Vogtle AP1000 units.

Chaired the IAEA SMR Forum, and associated working group meetings, to foster international collaboration on the regulation of SMRs, advancing U.S. views on a number of technical and regulatory challenges associated with reviewing and providing oversight of new reactor technologies.

FY 2020 Congressional Budget Justification l 36

NEW REACTORS OTHER INDICATORS LICENSING Non-LWR Reactor Licensing Application Review Timeliness* (NR-19)

Fiscal Year Target Actual Comment FY 2014 FY 2015 New indicator in FY 2016 FY 2019 FY 2017 FY 2018 FY 2019 85 FY 2020 85

  • Percentage of interim milestones supporting non-LWR regulatory engagement plans and license applications reviews that are completed on time in accordance with the schedules agreed upon with reactor designers and applicants (within the NRCs control).

Light-Water Reactor Application Review Timeliness* (NR-20)

Fiscal Year Target Actual Comment New in FY 2020 Consolidated indicators NR-02, NR-04, NR-06, and NR-14.

FY 2020 85

  • Percentage of LWR application review milestones (for ESPs, COLs, DCs, and license amendment requests) completed on the schedules agreed upon with the applicants (within the NRCs control).

RESEARCH Acceptable Technical Quality of Agency Research Technical Products* (NR-18)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2015 3.75 N/A No technical quality surveys requested in FY 2015.

FY 2016 3.75 4.31 FY 2017 3.75 4.42 FY 2018 Discontinued Indicator to be tracked internally.

Reintroduced in FY 2019. The Technical Quality Survey was discontinued in FY 2018 because of the low response rate. The agency reexamined its performance indicators and believes the Technical Quality Survey indicator provides the best quality measure for research products. The agency is focused on improving the response rate for the surveys and will explore FY 2019 4.0 revising the survey questions to enhance the value of this tool.

FY 2020 4.0

  • The NRC has developed a process to measure the quality of research products on a five-point scale using surveys of end users to determine the usability and value-added of the products. As appropriate, the NRC will develop and add other mechanisms to this process to measure the quality of research products.

FY 2020 Congressional Budget Justification l 37

NEW REACTORS DISCONTINUED INDICATORS Percentage of Early Site Permit Review Interim Milestones Completed on Time (NR-02)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 100 FY 2017 85 100 FY 2018 85 100 FY 2019 85 This indicator was consolidated into NR-20 to streamline timeliness FY 2020 Discontinue indicators for LWR application review timeliness.

Percentage of Design Certification Review Interim Milestones Completed on Time (NR-04)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 100 FY 2017 85 100 FY 2018 85 100 FY 2019 85 This indicator was consolidated into NR-20 to streamline timeliness FY 2020 Discontinue indicators for LWR application review timeliness.

Percentage of Milestones for COL Application Reviews Completed in Accordance with the Schedules Agreed Upon with the Applicants (NR-06)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 100 FY 2017 85 100 FY 2018 85 100 FY 2019 85 This indicator was consolidated into NR-20 to streamline timeliness FY 2020 Discontinue indicators for LWR application review timeliness.

Percentage of Interim Milestones for SMR DC Reviews That Are Completed in Accordance with the Schedules Agreed Upon with the Applicants (NR-08)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 NA No reactor design submitted for review.

FY 2017 85 100 FY 2018 Discontinued Indicator to be consolidated with NR-04.

FY 2019 N/A FY 2020 N/A FY 2020 Congressional Budget Justification l 38

NEW REACTORS Identify and Resolve Policy and Key Technical Issues Facing the Review of SMR Applications and Implement Resolutions through Rule Changes or Guidance Development (NR-09)

Fiscal Year Target Actual Comment Complete All milestones 100% of completed as FY 2014 milestones appropriate.

necessary to All milestones support the completed as FY 2015 resolution of appropriate.

FY 2016 policy and 100 key technical issues.

In addition, complete milestones necessary to support implement-ation of FY 2017 resolutions. 100 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A Percentage of SMR Preapplication Review Interim Milestones Completed in Accordance with the Schedule Agreed Upon with the Applicants for Two DC Applications (NR-11)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 N/A No milestones associated with preapplication reviews.

FY 2017 85 N/A No SMR preapplication activities during FY 2017.

FY 2018 Discontinued SMR preapplication review timeliness will be tracked internally.

FY 2019 N/A FY 2020 N/A Percentage of Interim Milestones for SMR COL and Construction Permit Application Reviews Completed in Accordance with the Schedule Agreed Upon with the Applicants (NR-13)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 The NRC had no SMR COL or SMR construction permit application for FY 2016 85 N/A review during FY 2016.

The NRC had no SMR COL or SMR construction permit application for FY 2017 85 N/A review during FY 2017.

FY 2018 Discontinued Indicator to be consolidated with NR-06.

FY 2019 N/A FY 2020 N/A FY 2020 Congressional Budget Justification l 39

NEW REACTORS Percentage of License Amendment Reviews Completed on the Schedules Agreed Upon with the Licensee (Within the NRC's Control) (NR-14)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 85 100 FY 2017 85 100 Although the NRC was meeting tracked dates, the agency conservatively considered the metric as not met because of a lack of supporting documentation on the determination of the schedule. In September 2018, the NRC developed a new process that better FY 2018 85 80 documents discussions about the feasibility of dates.

FY 2019 85 This indicator was consolidated into NR-20 to streamline timeliness FY 2020 Discontinue indicators for LWR application review timeliness.

Number of Domestic and International Vendor Inspections Completed (NR-15)

Fiscal Year Target Actual Comment FY 2014 30 36 FY 2015 30 39 FY 2016 30 34 FY 2017 35 37 The target was increased based on increased workload.

Fewer inspections were performed as a result of reduced nuclear FY 2018 30 25 construction activity.

FY 2019 20 The target was decreased based on decreased workload.

FY 2020 Discontinue Workload is expected to decrease. Indicator to be tracked internally.

Percent of Proposed Final Rules Completed in Accordance with the Schedule Approved by the Commission (NR-16)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 80 N/A There were no final rulemakings in FY 2016.

FY 2017 80 N/A There were no final rulemakings in FY 2017 FY 2018 80 100 FY 2019 80 FY 2020 Discontinue Rulemaking will be tracked with a different indicator internally.

FY 2020 Congressional Budget Justification l 40

NEW REACTORS Timeliness of Completing Actions on Critical Research Program* (NR-17)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 No critical research 90% of major program milestones met actions on or before completed in FY 2015 their due date FY 2015.

90% of major milestones met There were no critical milestones associated with the on or before research activities conducted in this business line in FY 2016; FY 2016 their due date N/A thus, there are no performance data to report.

90% of major milestones met There were no critical milestones associated with the on or before research activities conducted in this business line in FY 2017; FY 2017 their due date N/A thus, there are no performance data to report.

FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • Critical research programs typically respond to high-priority needs from the Commission and the NRCs licensing organizations. Critical research programs will be the highest priority needs identified at the beginning of each FY.

FY 2020 Congressional Budget Justification l 41

NUCLEAR MATERIALS AND WASTE SAFETY NUCLEAR MATERIALS AND WASTE SAFETY Nuclear Materials and Waste Safety (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Business Line $M FTE $M FTE $M FTE $M FTE Spent Fuel Storage and Transportation 26.0 96.6 22.5 100.0 24.2 101.0 1.7 1.0 Nuclear Materials Users 62.3 211.4 60.6 215.0 59.1 205.0 (1.4) (10.0)

Decommissioning and Low-Level Waste 27.1 107.5 24.8 104.0 22.9 93.0 (1.9) (11.0)

High-Level Waste 0.1 0.4 0.0 0.0 38.5 77.0 38.5 77.0 Fuel Facilities 24.6 107.0 23.2 96.0 21.0 88.0 (2.2) (8.0)

Total $140.1 523.0 $131.0 515.0 $165.7 564.0 $34.7 49.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, licensing activities within the Spent Fuel Storage and Transportation and Decommissioning and Low-Level Waste Business Lines were funded $2.4 million and $0.6 million, respectively, through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

The Nuclear Materials and Waste Safety Program reflects the NRCs effort to license and oversee nuclear materials in a manner that adequately protects public health and safety. This program provides assurance of the physical security of the materials and waste, and protection against radiological sabotage, theft, or diversion of nuclear materials. Through this program, the NRC regulates uranium processing and fuel facilities, research and pilot facilities, nuclear materials users (medical, industrial, research, and academic), spent fuel storage, spent fuel and material transportation and packaging, decontamination and decommissioning of facilities, and low-level and high-level radioactive waste. The program contributes to the NRCs safety and security strategic goals through the activities of the Spent Fuel Storage and Transportation, Nuclear Materials Users, Decommissioning and Low-Level Waste (LLW), High-Level Waste, and Fuel Facilities Business Lines.

Overall resources requested in the FY 2020 budget for the Nuclear Materials and Waste Safety Program are $165.7 million, including 564 FTE. This funding level represents an increase of

$34.7 million, including 49 FTE, when compared with the FY 2019 Enacted Budget. This budget includes $38.5 million, including 77 FTE for the proposed Yucca Mountain deep geologic repository for spent nuclear fuel (SNF) and other high-level radioactive waste. These resources are derived from the Nuclear Waste Fund and are nonfee-recoverable.

FY 2020 Congressional Budget Justification l 43

SPENT FUEL STORAGE AND TRANSPORTATION SPENT FUEL STORAGE AND TRANSPORTATION Spent Fuel Storage and Transportation by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE International Activities 0.3 1.7 0.6 2.0 0.4 2.0 (0.2) 0.0 Licensing 15.5 56.9 13.7 62.0 15.5 62.0 1.8 0.0 Oversight 2.4 13.2 2.5 13.0 2.5 13.0 0.0 0.0 Research 1.7 1.9 1.0 2.0 1.1 3.0 0.1 1.0 Rulemaking 2.5 6.2 1.1 6.0 1.1 6.0 0.0 0.0 Mission Support and Supervisors 3.1 16.6 2.9 15.0 2.9 15.0 (0.0) 0.0 Training 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 Travel 0.5 0.0 0.6 0.0 0.6 0.0 (0.0) 0.0 Total $26.0 96.6 $22.5 100.0 $24.2 101.0 $1.7 1.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, licensing activities within the Spent Fuel Storage and Transportation Business Line were funded

$2.4 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

Spent Fuel Storage and Transportation Business Line activities support the safe and secure storage of SNF and the safe and secure transport of radioactive materials. These activities include conducting safety, security, and environmental reviews of license applications for SNF storage casks and independent spent fuel storage installations (ISFSIs), as well as performing safety and security reviews of radioactive material transportation packages. This work also includes reviewing storage system and ISFSI renewal applications, developing and updating related regulations and guidance, conducting safety inspections of transportation package and storage cask vendors and fabricators, observing ISFSI operations, and performing security inspections of ISFSIs.

FY 2020 Congressional Budget Justification l 45

SPENT FUEL STORAGE AND TRANSPORTATION Figure 5: Licensed and Operating ISFSIs by State FY 2020 Congressional Budget Justification l 46

SPENT FUEL STORAGE AND TRANSPORTATION CHANGES FROM FY 2019 ENACTED BUDGET Resources for licensing activities increase when compared with the FY 2019 Enacted Budget; however, resources decrease when compared to the FY 2019 Total Budget Authority. This variance is because $2.4 million of licensing activities was funded in FY 2019 through the application of authorized prior-year carryover. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, which provides a comparison of the FY 2020 request to the FY 2019 Budget Authority. In addition, requested resources increase to support (1) reviews of storage license renewal applications, (2) inspection activities for four ISFSI pad construction sites in preparation for site decommissioning, and (3) fuel performance research (e.g., licensing technical basis for evaluating fuel cladding performance with regard to gross ruptures during loading and unloading).

These increases are partially offset by decreases as a result of (1) the completion of the effort to consolidate standard review plans, (2) the completion of knowledge management activities related to thermal modeling, (3) the delay of certain enhancements to the SCALE code, (4) the implementation of the Safeguards and Security Inspection Program, and (5) budget estimates that are better aligned with projected workload.

Generally, resources budgeted in the Licensing and Oversight Product Lines impact fees for service. All other resources impact annual fees.

MAJOR ACTIVITIES The major activities within the Spent Fuel Storage and Transportation Business Line include the following:

Review new applications, amendment requests, and license renewal applications for transportation packages and SNF storage applications to ensure the safe and secure storage of SNF and the safe and secure transport of other radioactive materials.

Conduct safety inspections of storage and transportation cask vendors, fabricators, and designers, as well as ISFSI pad construction, dry-run operations, initial loading campaigns, and routine operations.

Perform the technical, legal, and environmental reviews for consolidated interim storage facility applications.

Conduct security-related activities associated with radioactive materials in quantities of concern and with transportation security route approvals.

Conduct spent fuel storage and transportation rulemakings and develop associated regulatory guidance documents.

Coordinate with IAEA to compare regulatory frameworks, share research information on storage and transportation matters, and harmonize the certification of transport packages and the licensing of storage cask designs with international standards.

FY 2020 Congressional Budget Justification l 47

SPENT FUEL STORAGE AND TRANSPORTATION Satisfy international treaty and convention obligations as well as statutory mandates, including the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.

Provide oversight of the NRCs safeguards and ISFSI security inspection program.

80 69 69 70 60 50 50 46 42 Actions 40 30 19 20 20 20 16 16 17 16 16 11 12 10 1 1 2 2 2 0

FY 2016 Actual FY 2017 Actual FY 2018 Actual FY 2019 FY 2020 Workload Inventory Workload Inventory Workload Inventory Target/Planned Target/Planned Workload Inventory Workload Inventory Transport Package Reviews Storage System and Storage Site Reviews Consolidated and Interim Storage Facility and Topical Safety Analysis Report Application Reviews Inspections Figure 6: Spent Fuel Storage and Transportation Workload SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Spent Fuel Storage and Transportation Business Line include the following:

Accepted and began the review of the Holtec International application for a consolidated interim storage facility (CISF) and resumed the review of the CISF application from Interim Storage Partners, a joint venture between Waste Control Specialists (WCS) and Orano. The applicant previously requested a pause in the staffs review of the application.

Issued the renewed license for the ISFSI at the North Anna Power Station. The license was renewed for an additional 40-year term expiring on June 30, 2058. The license contains a condition that requires the implementation of an aging management program (AMP) to ensure that structures, systems, and components important to safety will continue to perform their intended functions during the extended storage period authorized by the renewal.

FY 2020 Congressional Budget Justification l 48

SPENT FUEL STORAGE AND TRANSPORTATION Held six public scoping meetings in support of the environmental review for the Holtec HI-STORE CISF license application. The staff held open houses before the meetings to address questions from the public and conducted multiple government-to-government meetings with local and State officials.

Issued an Information Notice 2018-01, Noble Fission Gas Releases during Spent Fuel Casks Loading Operations, dated February 21, 2018. The notice provides information on operating experience related to noble fission gas releases during spent fuel loading operations.

Published guidance NUREG/CR-7239, Review of Exemptions and General Licenses for Fissile Material in 10 CFR 71, issued January 2018, that explains the provisions for exemptions from classification as fissile material based upon the 2004 rulemaking. The guidance assists fissile material licensees in their interpretation and application of the provisions such that criticality safety is ensured during transportation activities.

Issued a Temporary Instruction (TI) (2690/011, Review of Aging Management Programs at Independent Spent Fuel Storage Installations, dated January 30, 2018), that applies to a renewed license of a specific ISFSI or a renewed Certificate of Compliance (CoC).

The purpose of the TI is to evaluate, through inspection, whether licensees have adequate processes or procedures planned or in place to implement Aging Management Programs provided in the renewed license or CoC.

Completed 42 transport package design and 12 storage cask and facility license reviews. The agency also conducted 17 inspections of activities related to radioactive material package certificate holders and spent fuel storage cask certificate holders, as well as support to regional inspections at ISFSIs to ensure the casts are being designed, fabricated, and used according to approved safety requirements.

Published a revised document (NUREG/CR-7198, Revision 1, Mechanical Fatigue Testing of High-Burnup Fuel for Transportation Applications, issued October 2017), that documented testing at Oak Ridge National Laboratory to assess whether high-burnup SNF maintains its integrity under storage and transport conditions. This document will serve as the technical basis for multiple updates to the agencys position on the storage and transportation of high-burnup fuel.

FY 2020 Congressional Budget Justification l 49

SPENT FUEL STORAGE AND TRANSPORTATION OTHER INDICATORS LICENSING Percentage of Spent Fuel Storage and Transportation Container and Installation Design Reviews, Renewals, and Major Licensing Actions Completed in 3 Years or Less* (SF-10)

Fiscal Year Target Actual Comment New in FY 2020 Consolidated indicators SF-01, SF-02, SF-03, and SF-04.

FY 2020 85

  • This indicator will include all spent fuel storage container and installation design reviews previously captured under SF-01 and SF-02, spent fuel transportation container design reviews previously captured under SF-03 and SF-04, renewals, and major licensing actions, including the review of two consolidated interim storage facilities.

Percentage of Non-Spent-Fuel Transportation Container Design Reviews Completed in 1 Year or Less*

(SF-11)

Fiscal Year Target Actual Comment New in FY 2020 Previously part of SF-04.

FY 2020 85

  • This indicator will account for and track non-spent-fuel transportation container design reviews that were previously tracked under SF-04. The timeframe is being decreased from 2 years to 1 year to specify that this indicator will only capture non-spent-fuel transportation container design reviews, which generally take less time.

OVERSIGHT Number of Spent Fuel Storage and Transportation Inspections Completed (SF-06)

Fiscal Year Target Actual Comment FY 2014 16 18 FY 2015 16 19 FY 2016 16 16 FY 2017 16 16 FY 2018 16 17 FY 2019 16 FY 2020 16 DISCONTINUED INDICATORS Percentage of Storage Container and Installation Design Reviews Completed in 13 Months or Less*

(SF-01)

Fiscal Year Target Actual Comment FY 2014 80 94 FY 2015 80 84 FY 2016 80 89 The target was not met as a result of insufficient staffing to support design reviews. Management has developed staffing strategies to FY 2017 80 63 address timeliness.

FY 2018 80 100 FY 2019 80 FY 2020 Discontinue This indicator will be consolidated and tracked under SF-10.

  • Modified from 12.6 months to 13 months in FY 2018 to simplify the measurement period.

FY 2020 Congressional Budget Justification l 50

SPENT FUEL STORAGE AND TRANSPORTATION Percentage of Storage Container and Installation Design Reviews Completed in 2 Years or Less (SF-02)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 The NRC developed a revised work prioritization strategy to improve FY 2016 100 95 this metric.

FY 2017 100 100 The target was reduced to allow for a few complex cases that are FY 2018 90 100 expected to take significantly longer than 2 years to complete.

FY 2019 90 FY 2020 Discontinue This indicator will be consolidated and tracked under SF-10.

Percentage of Transportation Container Design Reviews Completed in 8 Months or Less* (SF-03)

Fiscal Year Target Actual Comment FY 2014 80 96 FY 2015 80 90 FY 2016 80 93 FY 2017 80 96 FY 2018 80 88 FY 2019 80 This indicator will be incorporated and captured under SF-10 for spent fuel transportation design reviews and SF-11 for non-spent-fuel FY 2020 Discontinue transportation design reviews.

  • Modified from 7.4 months to 8 months in FY 2018 to simplify the measurement period.

Percentage of Transportation Container Design Reviews Completed in 2 Years or Less (SF-04)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 The target was reduced to allow for a few complex cases that are FY 2018 90 100 expected to take significantly longer than 2 years to complete.

FY 2019 90 This indicator will be incorporated and captured under SF-10 for spent fuel transportation design reviews and SF-11 for non-spent-fuel FY 2020 Discontinue transportation design reviews.

Percentage of Major Milestones for Critical Research Programs Completed On or Before Their Due Date*

(SF-08)

Fiscal Year Target Actual Comment FY 2014 90 N/A There were no critical milestones associated with the research activities FY 2015 90 N/A conducted in this business line in FY 2014, FY 2015, FY 2016, and FY 2016 90 N/A FY 2017.

FY 2017 90 N/A FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • Critical research programs typically respond to high-priority needs from the Commission and the NRCs licensing organizations. Critical research programs for the highest priority needs are identified at the beginning of the FY.

FY 2020 Congressional Budget Justification l 51

SPENT FUEL STORAGE AND TRANSPORTATION Combined Score on a Scale of 1 to 5 for the Technical Quality of Agency Research Technical Products*

(SF-09)

Fiscal Year Target Actual Comment FY 2014 3.75 5.0 FY 2015 3.75 5.0 FY 2016 3.75 4.68 FY 2017 3.75 5.0 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • The NRC has developed a process to measure the quality of research products on a five-point scale using surveys of end users to determine the usability and value-added of the products. As appropriate, other mechanisms will be developed and added to this process to measure the quality of research products.

FY 2020 Congressional Budget Justification l 52

NUCLEAR MATERIALS USERS NUCLEAR MATERIALS USERS Nuclear Materials Users by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE Event Response 0.5 2.6 0.6 3.0 0.5 3.0 (0.0) 0.0 Generic Homeland Security 11.8 15.0 10.6 15.0 10.2 15.0 (0.4) 0.0 International Activities 8.4 12.3 8.5 14.0 7.8 12.0 (0.7) (2.0)

Licensing 8.9 44.3 9.6 48.0 8.8 44.0 (0.7) (4.0)

Oversight 12.2 48.1 11.2 51.0 10.6 47.0 (0.7) (4.0)

Research 0.2 0.8 0.2 1.0 0.9 2.0 0.7 1.0 Rulemaking 1.4 7.5 2.0 11.0 2.5 12.0 0.5 1.0 State, Tribal and Federal Programs 5.1 26.6 5.0 26.0 4.7 24.0 (0.4) (2.0)

Mission Support &

Supervisors 9.4 51.3 8.4 43.0 8.8 43.0 0.4 0.0 Training 1.8 2.9 1.6 3.0 1.5 3.0 (0.1) 0.0 Travel 2.5 0.0 2.9 0.0 2.8 0.0 (0.1) 0.0 Total $62.3 211.4 $60.6 215.0 $59.1 205.0 $(1.4) (10.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

Nuclear Materials Users Business Line activities support the licensing, inspection, event evaluation, research, incident response, allegations review, enforcement, import and export authorizations, rulemaking, programmatic oversight of Agreement States, Integrated Materials Performance Evaluation Program (IMPEP), and interactions with the Organization of Agreement States. Activities also include intergovernmental communication and coordination, implementation of the Tribal Policy Statement and coordination with other Federal agencies on Tribal matters, and maintenance of major IT systems to support the regulatory safety and security infrastructure needed to track the possession and use of nuclear materials.

Agreement States are those States that have signed an agreement with the NRC in accordance with Section 274.b of the Atomic Energy Act of 1954, as amended (AEA), which authorizes the NRC to discontinue, and the State to assume, regulatory authority over certain materials cited in the AEA. With respect to Agreement States, the NRC has programmatic oversight responsibility to periodically review the State programs to ensure adequacy and compatibility. The most recent agreement, with the State of Wyoming, was signed on September 25, 2018, and became effective on September 30, 2018. The State of Vermont has applied to become an Agreement State, which if approved would bring the total number of Agreements States to 39 by FY 2020.

FY 2020 Congressional Budget Justification l 53

NUCLEAR MATERIALS USERS Figure 7: Current Agreement States Security activities in the Nuclear Materials Users Business Line include the implementation of a national registry to ensure the control of radioactive sources of concern1 and to prevent their malevolent use. The Integrated Source Management Portfolio has integrated three core systems: the National Source Tracking System (NSTS), Web-Based Licensing, and the License Verification System. The systems provide one management mechanism to license and track sources and other radioactive materials. Security-related activities also include inspecting materials facilities with radioactive materials in quantities of concern and performing prelicensing reviews of new materials license applicants.

CHANGES FROM FY 2019 ENACTED BUDGET Resources decrease primarily as a result of a reduction in multilateral international assistance activities, the reduction of regional resources for the Nuclear Safety Professional Development Program, and budget estimates that are better aligned with projected workload.

These decreases are partially offset by an increase in resources to support (1) the update of regulatory guidance related to the release of patients treated with radioactive materials; (2) the reallocation of contract support resources to the Nuclear Materials Users Business Line to make budget execution more efficient; (3) the rulemaking activities involving 10 CFR Part 30, Rules of General Applicability to Domestic Licensing of Byproduct Material, and 10 CFR Part 34, 1 Radioactive sources of concern refers to sources with quantities of radioactive material meeting or exceeding the Category 1 and Category 2 activity levels contained in 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Materials.

FY 2020 Congressional Budget Justification l 54

NUCLEAR MATERIALS USERS Licenses for Industrial Radiography and Radiation Safety Requirements for Industrial Radiographic Operations; and developing guidance for emerging medical technologies and radiopharmaceuticals.

Generally, for the Nuclear Materials Users Business Line, budgeted resources impact annual fees charged to licensees in accordance with 10 CFR Part 171, Annual Fees for Reactor Licenses and Fuel Cycle Licenses and Materials Licenses, Including Holders of Certificates of Compliance, Registrations, and Quality Assurance Program Approval and Government Agencies Licensed by NRC.

MAJOR ACTIVITIES The major activities within the Nuclear Materials Users Business Line include the following:

Complete reviews of approximately 2,000 materials licensing actions (new applications, amendments, renewals, and terminations).

Complete approximately 900 routine health, safety, and security inspections; reciprocity and reactive inspections; and inspections for certain general licensees.

Oversee and support the Agreement States regulation of approximately 17,000 specific and 150,000 general licenses, conduct nine IMPEP reviews, and review Agreement State incidents and events as reported.

Implement the agencys Tribal Policy Statement, including outreach, guidance development, and staff training; coordinate with other Federal agencies on Tribal matters and NRC projects involving Tribal consideration; and update contact databases and mapping tools.

Coordinate and serve as liaison for homeland security regulatory initiatives, control and track imports and exports of sources, and develop and implement the Integrated Source Management Portfolio.

Satisfy international treaty and convention obligations, as well as statutory mandates. This includes implementing the Code of Conduct on the Safety and Security of Radioactive Sources.

Support international programs and activities to develop or enhance global controls over radioactive sources, consistent with the Code of Conduct on the Safety and Security of Radioactive Sources.

FY 2020 Congressional Budget Justification l 55

NUCLEAR MATERIALS USERS 2,500 2,075 2,000 2,000 2,000 Licensing Actions/Inspections 1,774 1,565 1,513 1,500 956 920 900 1,000 900 832 788 500 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019* FY 2020*

Licensing Actions Inspections

  • Values provided for FY 2019-FY 2020 are projections.

Figure 8: Nuclear Materials Users Workload FY 2020 Congressional Budget Justification l 56

NUCLEAR MATERIALS USERS SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Nuclear Materials Users Business Line include the following:

Finalized the agreement authorizing the State of Wyoming to become an Agreement State as of September 30, 2018, and to assume regulatory authority over uranium and thorium milling, the possession and use of source materials involved in the extraction and concentration of uranium and thorium in source material and ores at milling facilities, and the management and disposal of byproduct materials as defined in AEA Section 11e.(2).

Completed a comprehensive evaluation of patient release regulations, which resulted in a decision to conduct a comprehensive revision to Regulatory Guide 8.39, Release of Patients Administered Radioactive Materials, issued April 1997.

Facilitated the development and subsequent issuance of the 2018 Radiation Source Protection and Security Task Force Report with 14 Federal agencies and one State organization.

Issued Interim Guidance for dispositioning violations for failure to control and maintain constant surveillance for portable gauges in May 2018, that modifies the approach to assigning severity levels for violations involving portable gauge security requirements by providing a graded approach to evaluating the likelihood for an opportunity for the loss or theft of a portable gauge, or exposure to workers or the public.

Published the revised 10 CFR Part 35, Medical Use of Byproduct Material, to amend the medical event definition for reporting and notification requirements for permanent implant brachytherapy. The final rule also amends the requirements for training and experience and for measuring molybdenum contamination (breakthrough). The rule adds a new requirement for the reporting of failed technetium and rubidium generators and allows licensees to name associate radiation safety officers on a medical license.

The new regulations and guidance became effective on January 14, 2019.

Published nine revised volumes of NUREG-1556, Consolidated Guidance about Materials Licenses, which provides guidance to applicants in preparing license applications for the possession and use of radioactive materials.

Continued to build and maintain open communications and good working relationships with Tribal nations, including facilitating training for the Navajo, Seneca, and Catawba Nations.

Engaged internationally and domestically to enhance nuclear safety and security through the regulatory oversight of radioactive sources. The NRC participated in numerous meetings of technical and legal experts on IAEAs Code of Conduct for the Safety and Security of Radioactive Sources. The NRC also worked with other U.S. Government agencies and IAEA to develop international security guidance documents for radioactive sources.

Supported bilateral and regional (Africa, Latin America and the Caribbean, and the former Soviet Union) regulatory assistance efforts, including the continued development FY 2020 Congressional Budget Justification l 57

NUCLEAR MATERIALS USERS and completion of verified national registries of radioactive sources through the NRCs Radioactive Sources Regulatory Partnership.

Provided technical support to U.S. executive branch agencies and participated in negotiations to enter into new, and implement existing, bilateral agreements between the U.S. Government and the governments of several countries establishing the framework for cooperation in the peaceful uses of nuclear energy. Such agreements must be in place for the NRC to approve exports of reactor-related technology, major reactor equipment, and reactor fuel. The NRC provided assistance for new section 123 agreements with Mexico and the United Kingdom, which are awaiting the exchange of diplomatic notes.

Managed the NRCs export/import licensing program to ensure all proposed exports met legal and regulatory requirements.

Led a team of international experts to complete an IAEA IRRS mission to the Republic of Georgia and an IAEA International Physical Protection Advisory Service review of Lithuanias nuclear security program.

FY 2020 Congressional Budget Justification l 58

NUCLEAR MATERIALS USERS OTHER INDICATORS LICENSING Percentage of Licensing Application Reviews for New Materials Licenses and License Amendments (Excluding Change of Control Amendments)* Completed in 90 Days or Less (NM-01)

Fiscal Year Target Actual Comment FY 2014 92 94 FY 2015 92 95 FY 2016 92 95 FY 2017 92 93 FY 2018 92 96 FY 2019* 92 FY 2020 92

  • For FY 2019, this indicator description excludes change of control amendments. The process for reviewing change of control amendments involves public notification and legal steps that are more complex and require more time than for other typical amendment reviews. Hence, change of control amendments are now being captured under NM-03.

Percentage of Licensing Application Reviews for New Materials Licenses and License Amendments (Excluding Change of Control Amendments)* Completed in 2 Years or Less (NM-02)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019* 100 FY 2020 100

  • For FY 2019, this indicator description excludes change of control amendments. Change of control amendments are now being captured under NM-04.

Percentage of Licensing Application Reviews for Materials License Renewals and Sealed Source and Devices Reviews and Associated Licensing Actions, and Change of Control Amendments* Completed in 180 Days or Less (NM-03)

Fiscal Year Target Actual Comment FY 2014 92 93 FY 2015 92 94 FY 2016 92 94 FY 2017 92 96 FY 2018 92 100 FY 2019* 92 FY 2020 92

  • As previously noted, change of control amendments were added to this indicator description for FY 2019. Hence, change of control amendments that were being captured in NM-01 will be captured under NM-03 starting in FY 2019.

FY 2020 Congressional Budget Justification l 59

NUCLEAR MATERIALS USERS Percentage of Licensing Application Reviews for Materials License Renewals and Sealed Source and Devices Reviews and Associated Licensing Actions, and Change of Control Amendments* Completed in 2 Years or Less (NM-04)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019* 100 FY 2020 100

  • As previously noted, change of control amendments were added to this indicator description for FY 2019. Hence, change of control amendments that were being captured in NM-02 will be captured under NM-04 starting in FY 2019.

OVERSIGHT Percentage of Safety Inspections of Materials Licensees Completed on Time (NM-05)

Fiscal Year Target Actual Comment FY 2014 98 100 FY 2015 98 99 FY 2016 98 100 FY 2017 98 100 FY 2018 98 99 FY 2019 98 FY 2020 98 Percentage of Technical Allegation Reviews Completed in 180 Days or Less (NM-07)

Fiscal Year Target Actual Comment FY 2014 95 97 FY 2015 95 100 FY 2016 95 95 FY 2017 95 100 FY 2018 95 100 FY 2019 95 FY 2020 95 Percentage of Technical Allegation Reviews Completed in 360 Days or Less* (NM-08)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015* 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100

  • This corrects the error in the FY 2015 Congressional Budget Justification that listed FY 2013 through FY 2015 targets as 330 days.

FY 2020 Congressional Budget Justification l 60

NUCLEAR MATERIALS USERS Percentage of Enforcement Actions Where No Investigation Is Involved Completed in 160 Days or Less (NM-09)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 The staff will focus on the early identification of enforcement cases that are likely to involve complex technical, legal, or policy issues that need FY 2016 100 96 to be resolved across multiple program offices to ensure timely resolution.

FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 Percentage of Enforcement Actions in which Investigation Is Involved Completed in 330 Days or Less (NM-10)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 One action was completed beyond the target date because of the FY 2017 100 86 challenging nature of the issues involved.

FY 2018 100 100 FY 2019 100 FY 2020 100 Percentage of Investigations That Developed Sufficient Information to Reach a Conclusion Regarding Wrongdoing Completed within 12 Months or Less (NM-11)

Fiscal Year Target Actual Comment FY 2014 85 90 FY 2015 85 95 FY 2016 85 88 FY 2017 85 89 FY 2018 85 87 FY 2019 85 FY 2020 85 Percentage of Investigations Completed in Time to Initiate Civil Enforcement and/or Criminal Prosecution Action (NM-12)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 FY 2020 Congressional Budget Justification l 61

NUCLEAR MATERIALS USERS STATE, TRIBAL, AND FEDERAL PROGRAMS Number of Integrated Materials Performance Evaluation Program Review Reports Not Completed within 30 Days of the Management Review Board Meeting (NM-21)

Fiscal Year Target Actual Comment FY 2014 FY 2015 New indicator in FY 2016 FY 2018 FY 2017 FY 2018 <2 1 FY 2019 <2 FY 2020 <2 DISCONTINUED INDICATORS Percentage of Technical Allegation Reviews Completed in 150 Days or Less (NM-06)

Fiscal Year Target Actual Comment FY 2014 90 97 FY 2015 90 96 FY 2016 90 94 FY 2017 90 100 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A Percentage of Major Milestones for Critical Research Programs Completed On or Before Their Due Date*

(NM-15)

Fiscal Year Target Actual Comment FY 2014 90 100 There were no critical milestones associated with the research activities FY 2015 90 N/A conducted in this business line in FY 2015.

There were no critical milestones associated with the research activities FY 2016 90 N/A conducted in this business line in FY 2016.

There were no critical milestones associated with the research activities FY 2017 90 N/A conducted in this business line in FY 2017.

The projected level of research for this business line is not expected to FY 2018 Discontinued meet the criteria for this indicator.

FY 2019 N/A FY 2020 N/A

  • Critical research programs typically respond to high-priority needs from the Commission and the NRC's licensing organizations. Critical research programs on the highest priority needs are identified at the beginning of the FY.

FY 2020 Congressional Budget Justification l 62

NUCLEAR MATERIALS USERS Combined Score on a Scale of 1 to 5 for the Technical Quality of Agency Research Technical Products*

(NM-16)

Fiscal Year Target Actual Comment FY 2014 3.75 5.0 No research products were produced for this business line during FY 2015 3.75 N/A FY 2015.

No research products were produced for this business line during FY 2016 3.75 N/A FY 2016.

FY 2017 3.75 4.0 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • The NRC has developed a process to measure the quality of research products on a five-point scale using surveys of end users to determine the usability and value-added of the products. As appropriate, other mechanisms will be developed and added to this process to measure the quality of research products.

Percentage Assessment of the Agencys Readiness to Respond to a Nuclear or Terrorist Emergency Situation or Other Event of National Interest (NM-17)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 Discontinue Indicator to be tracked internally.

Percentage of Information Assessment Team Advisories Issued within 24 Hours of Notification (NM-18)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 90 100 FY 2017 90 100 FY 2018 90 100 FY 2019 90 This indicator is no longer useful as the NRC has issued no Information FY 2020 Discontinue Assessment Team Advisories since 2014.

Percentage of Integrated Materials Performance Evaluation Program Review Reports Completed within 30 Days of the Management Review Board Meeting (NM-20)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 The NRC increased management oversight to ensure the timeliness of FY 2016 85 75 reports and will continue to monitor.

FY 2017 85 100 Replaced by the number of IMPEP review reports that were not FY 2018 Discontinued completed within 30 days of the Management Review Board meeting (NM-21).

FY 2019 N/A FY 2020 N/A FY 2020 Congressional Budget Justification l 63

DECOMMISSIONING AND LOW-LEVEL WASTE DECOMMISSIONING AND LOW-LEVEL WASTE Decommissioning and Low-Level Waste by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE International Activities 0.6 3.2 1.2 6.0 0.8 4.0 (0.4) (2.0)

Licensing 14.4 56.1 11.6 49.0 11.1 43.0 (0.5) (6.0)

Oversight 5.4 25.0 5.4 25.0 5.1 24.0 (0.3) (1.0)

Research 1.3 2.0 0.5 1.0 0.5 1.0 (0.0) 0.0 Rulemaking 0.9 4.2 1.8 9.0 1.6 8.0 (0.2) (1.0)

Mission Support and Supervisors 3.3 17.0 2.6 14.0 2.4 13.0 (0.2) (1.0)

Training 0.7 0.0 0.8 0.0 0.6 0.0 (0.2) 0.0 Travel 0.6 0.0 0.9 0.0 0.7 0.0 (0.2) 0.0 Total $27.1 107.5 $24.8 104.0 $22.9 93.0 $(1.9) (11.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, licensing activities within the Decommissioning and LLW Business Line were funded $0.6 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

Decommissioning and Low-Level Waste (LLW) Business Line activities support the licensing and oversight of uranium recovery facilities and sites undergoing decommissioning. They also include the oversight of the national LLW program and monitoring of the U.S. Department of Energys (DOEs) Waste Incidental to Reprocessing (WIR) activities at the Savannah River Site and the Idaho National Laboratory consistent with the NRCs responsibilities under the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005. Other business line activities include interfacing with licensees, applicants, Federal and State agencies, Native American Tribal governments, and the public on regulatory matters.

Decommissioning is the safe removal of a nuclear facility from service and the reduction of residual radioactivity to a level that permits the termination of the NRC license. The NRC rules for decommissioning establish site release criteria and provide for unrestricted or, under certain conditions, restricted release of a site. The NRC regulates the decommissioning of complex materials sites, fuel cycle facilities, uranium recovery facilities, power reactors, and research and test reactors, with the ultimate goal of license termination.

FY 2020 Congressional Budget Justification l 65

DECOMMISSIONING AND LOW-LEVEL WASTE Figure 9: Locations of NRC-Regulated Sites Undergoing Decommissioning CHANGES FROM FY 2019 ENACTED BUDGET Resources decrease as a result of (1) the reduction in the number of operating uranium recovery facilities and major licensing actions, (2) the completion of specific support to the State of Wyoming for the Agreement State transition, (3) the expected license terminations for Humboldt Bay Power Plant and Zion Nuclear Power Station, Units 1 and 2 when decommissioning is completed and reduced decommissioning efforts at La Crosse Boiling Water Reactor as it approaches license termination in FY 2020, (4) the disposition of numerous sites under the nonmilitary radium program, (5) anticipated workload reductions for the military radium program, and (6) the completion of activities for the Centrus Lead Cascade fuel facility and the Westinghouse Electric Company, LLC (WEC), complex materials Hematite facility.

These resource decreases are partially offset by increases to support (1) the anticipated license amendment requests and technical reviews for decommissioning of the Homestake Mining Company and United Nuclear Corporation Church Rock uranium recovery facilities, (2) the complex materials decommissioning at the West Valley Demonstration Project, (3) the anticipated review of the Rare Elements Resources materials license application, (4) the transition of Pilgrim Nuclear Power Station (Pilgrim), Oyster Creek Nuclear Generating Station (Oyster Creek), and Three Mile Island Nuclear Station, Unit 1 (TMI 1) to the power reactor decommissioning program, (5) decommissioning activities for Rensselaer Polytechnic Institutes research and test reactor, and (6) rulemaking activities, including rule development, associated guidance development, and environmental reviews. Specific rulemakings include the Greater-Than-Class-C Rulemaking, the Integrated Radioactive Source Security and Accountability Rulemaking, and the Transuranic Waste Rulemaking.

FY 2020 Congressional Budget Justification l 66

DECOMMISSIONING AND LOW-LEVEL WASTE Generally, resources budgeted in the Licensing and Oversight Product Lines impact fees for service. All other resources impact annual fees.

MAJOR ACTIVITIES The major activities within the Decommissioning and LLW Business Line include the following:

Perform licensing and oversight activities for the decommissioning of four research and test reactors.

Perform licensing and oversight activities for 20 power reactors within the power reactor decommissioning program, including the addition of Pilgrim, Oyster Creek, and TMI 1.

Conduct oversight activities associated with the non-military radium program.

Perform licensing and oversight associated with ground water restoration activities at one licensed uranium recovery facility and for one licensed operating uranium recovery facility in non-Agreement States.

Perform licensing and oversight of 11 complex materials sites undergoing decommissioning and depleted uranium sites, and the execution of the memorandum of understanding with the U.S. Department of Defense to minimize dual regulation and duplicative regulatory requirements at military sites with radioactive materials under the Defense Environmental Restoration Program.

Perform licensing and oversight of five private uranium mill sites undergoing decommissioning.

Conduct oversight of 30 decommissioned Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I sites and eight decommissioned UMTRCA Title II sites that are under long-term care and maintenance by DOE.

Coordinate the National LLW Program, including developing guidance, supporting IMPEP evaluations in the LLW area, and responding to inquiries from Agreement States.

Provide oversight of the activities related to WIR, including monitoring activities at the DOE Savannah River Site and Idaho National Laboratory.

Conduct research activities to support the application of new technologies at complex sites and analytical tools used in decommissioning reviews.

Support cooperative programs to exchange information with regulatory counterparts bilaterally and multilaterally on decommissioning issues, the licensing of uranium recovery facilities, the development of regulations for the handling and disposal of LLW, and the decommissioning process for power reactors and other nuclear facilities.

Satisfy international treaty and convention obligations as well as statutory mandates, including the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.

FY 2020 Congressional Budget Justification l 67

DECOMMISSIONING AND LOW-LEVEL WASTE 12 11 11 Licensed Facilities and Licensing Actions 10 10 10 8 8 8

6 4

3 3 2

2 FY 2016 FY 2017 FY 2018 FY 2019* FY 2020*

Uranium Recovery Licensed Facilities Major Uranium Recovery Licensing Actions

  • Values provided for FY 2019-FY 2020 are projections and reflect a decrease in NRC-regulated uranium recovery facilities as a result of the State of Wyoming's transition to an Agreement State.

Figure 10: Uranium Recovery Licensed Facilities and Major Licensing Actions 25 20 20 20 19 19 19 15 Reactors 10 5 5 5 4 4 4 FY 2016 FY 2017 FY 2018 FY 2019* FY 2020*

Research and Test Reactors Undergoing Decom Power and Early Demo Reactors Undergoing Decom

  • Values provided for FY 2019-FY 2020 are projections.

Figure 11: Research and Test Reactors and Power/Early Demonstration Reactors Undergoing Decommissioning FY 2020 Congressional Budget Justification l 68

DECOMMISSIONING AND LOW-LEVEL WASTE SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Decommissioning and LLW Business Line include the following:

Completed major uranium recovery licensing actions, including the safety evaluation reports and the environmental assessments for the Uranium One Ludeman in situ recovery (ISR) major expansion, the Kennecott Sweetwater conventional mill license renewal, the Crow Butte Marsland uranium ISR major expansion, and the Cameco Smith Ranch Highland uranium ISR facility license renewal.

Partnered with the U.S. National Park Service to coordinate response actions involving radioactive material at the Great Kills Park site in Staten Island, NY, and the Spring Creek Park in Queens, NY. This ongoing coordination minimizes dual regulation and duplicative regulatory requirements while ensuring adequate standards for health, safety, and the environment.

Terminated the licenses for the WEC Hematite fuel fabrication facility located in Festus, MO, and the State University of New York at Buffalo research reactor in Buffalo, NY, and released the sites for unrestricted use.

Amended the license for the U.S. Department of Agricultures Beltsville Agricultural Research Center site in Beltsville, MD, to approve unrestricted release of a portion of the site that was used for onsite burial.

Completed one non-military radium scoping survey and six initial site visits, issued nine final reports, and performed oversight activities during the cleanup performed at the Benrus Clock Company and the ongoing cleanup for the New Haven Clock Company. The staff also coordinated with the U.S. Environmental Protection Agency about the ongoing removal action at the Bristol Instrument Gears site. The NRC also supported information requests from the Agreement States by providing updated information to New York, Texas, and North Dakota on the list of potential radium sites identified in Agreement States. The NRC staff has dispositioned 45 out of 47 original unique site owner properties and is working to disposition the remaining two original unique site owner properties where site visits have not been performed.

FY 2020 Congressional Budget Justification l 69

DECOMMISSIONING AND LOW-LEVEL WASTE OTHER INDICATORS LICENSING Percentage of Licensing Actions Including Interim Milestones Completed as Scheduled (DL-05)

Fiscal Year Target Actual Comment FY 2014 Yes Yes FY 2015 Yes Yes The target was changed to a percentage beginning in FY 2016 to FY 2016 90 100 provide a more informative indicator.

FY 2017 90 98 FY 2018 90 94 FY 2019 90 FY 2020 90 DISCONTINUED INDICATORS Percentage of Environmental Reviews and Environmental Review Documents Completed as Scheduled (DL-01)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 Completion of environmental reviews associated with licensing actions will be reported as a part of DL-05. The discontinuation of this indicator reduces the duplication of reporting requirements as environmental FY 2020 Discontinue reviews are an interim step of a licensing action.

Percentage of Time Saved in Completing Safety Evaluation Reports through Use of Presubmission Audits (DL-03)

Fiscal Year Target Actual Comment New indicator in FY 2014 FY 2015 There were not enough licensing actions to conduct a presubmission FY 2015 10 No data audit.

FY 2016 10 25 FY 2017 10 22 There were not enough licensing actions to conduct a presubmission FY 2018 10 No data audit.

Given market conditions and the cost of uranium, the NRC does not anticipate any applications, so conducting additional presubmission FY 2019 Discontinued audits will not be possible in the foreseeable future.

FY 2020 N/A FY 2020 Congressional Budget Justification l 70

DECOMMISSIONING AND LOW-LEVEL WASTE Percentage of Review or Monitoring Plan Activities for Waste to Incidental Reprocessing (WIR) That Are Completed as Scheduled (DL-07)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 80 100 FY 2017 80 100 FY 2018 80 86 The NRC does not have regulatory or enforcement authority over DOE for monitoring activities associated with WIR. For all DOE WIR consultations with the NRC, the NRC serves in an advisory capacity and its advice does not constitute regulatory approval. The potential impact of not achieving the target is considered to be low, therefore it FY 2019 Discontinued has been discontinued.

FY 2020 N/A Percentage of Major Milestones for Critical Research Programs Completed On or Before Their Due Date*

(DL-08)

Fiscal Year Target Actual Comment FY 2014 90 N/A There were no critical milestones associated with the research activities FY 2015 90 N/A conducted in this business line in FY 2013, FY 2014, FY 2015, FY 2016 90 N/A FY 2016, or FY 2017.

FY 2017 90 N/A FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • Critical research programs typically respond to high-priority needs from the Commission and the NRC's licensing organizations. Critical research programs for the highest priority needs are identified at the beginning of the FY.

Combined Score on a Scale of 1 to 5 for the Technical Quality of Agency Research Technical Products*

(DL-09)

Fiscal Year Target Actual Comment No research products were produced for this business line during FY 2014 3.75 N/A FY 2014.

FY 2015 3.75 5.0 FY 2016 3.75 4.75 3.75 There were no critical milestones associated with the research FY 2017 N/A activities.

FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A

  • The NRC has developed a process to measure the quality of research products on a five-point scale using surveys of end users to determine the usability and value-added of the products. As appropriate, other mechanisms will be developed and added to this process to measure the quality of research products.

FY 2020 Congressional Budget Justification l 71

HIGH-LEVEL WASTE HIGH-LEVEL WASTE High-Level Waste by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE Licensing 0.1 0.4 0.0 0.0 30.6 45.0 30.6 45.0 Oversight 0.0 0.0 0.0 0.0 0.2 1.0 0.2 1.0 Rulemaking 0.0 0.0 0.0 0.0 1.3 7.0 1.3 7.0 Mission Support and Supervisors 0.0 0.0 0.0 0.0 5.4 22.0 5.4 22.0 Training 0.0 0.0 0.0 0.0 0.4 2.0 0.4 2.0 Travel 0.0 0.0 0.0 0.0 0.7 0.0 0.7 0.0 Total $0.1 0.4 $0.0 0.0 $38.5 77.0 $38.5 77.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

The High-Level Waste Business Line supports the NRCs activities involving the proposed Yucca Mountain deep geologic repository for the disposal of SNF and other high-level radioactive waste using appropriations from the Nuclear Waste Fund.

FY 2020 resources will support the resumption of the licensing proceeding for the potential issuance of a construction authorization for a repository. Principal activities would include support for, and restart of, the adjudicatory proceeding; infrastructure activities for hearing facilities and IT capabilities; support for rulemakings associated with the geologic repository operations area; and related support activities such as acquisitions, recruitment, staffing, and training.

CHANGES FROM FY 2019 ENACTED BUDGET In FY 2020, resources support the activities associated with adjudication, which includes the hearing facility space and associated IT and audiovisual infrastructure installations. Resources will also support the prehearing conferences, associated travel, and subject matter experts needed to inform these efforts. Limited appellate and federal litigation activities are expected.

Resources also support necessary nonadjudicatory activities, particularly allegation and investigation activities, as well as the resumption of rulemakings associated with the geologic repository operations area.

FY 2020 Congressional Budget Justification l 73

HIGH-LEVEL WASTE MAJOR ACTIVITIES The major activities within the High-Level Waste Business Line include the following:

Conduct of infrastructure activities for hearing facility and IT/audiovisual support, including testing, verification, and training for IT systems (Licensing Support Network, Electronic Information Exchange, and Electronic Hearing Docket).

Resume the adjudication, including conduct of prehearing activities, such as discovery depositions, case management conferences, and summary disposition motions.

Preparation for and participation in ongoing federal litigation.

Support of allegation and investigation activities, as well as the continuation of rulemakings associated with a geologic repository operations area.

FY 2020 Congressional Budget Justification l 74

FUEL FACILITIES FUEL FACILITIES Fuel Facilities by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE Event Response 0.3 1.5 0.4 2.0 0.4 2.0 0.0 0.0 Generic Homeland Security 2.7 3.5 2.3 3.0 2.4 3.0 0.0 0.0 International Activities 1.3 6.8 1.3 7.0 1.3 7.0 0.0 0.0 Licensing 5.2 27.1 5.9 27.0 5.0 23.0 (0.9) (4.0)

Oversight 8.0 39.2 6.8 33.0 6.1 30.0 (0.7) (3.0)

Rulemaking 1.1 4.5 0.7 4.0 0.6 3.0 (0.2) (1.0)

Mission Support and Supervisors 4.8 24.5 4.0 20.0 3.7 20.0 (0.3) 0.0 Training 0.3 0.0 0.6 0.0 0.5 0.0 (0.1) 0.0 Travel 1.0 0.0 1.1 0.0 1.1 0.0 (0.0) 0.0 Total $24.6 107.0 $23.2 96.0 $21.0 88.0 $(2.2) (8.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

The Fuel Facilities Business Line encompasses the licensing and oversight of fuel cycle facilities in a manner that adequately protects public health and safety and promotes the common defense and security. The uranium fuel cycle begins with uranium ore that is mined and then milled to extract uranium from the ore. The uranium continues through processes for conversion, enrichment, and fuel fabrication. Conversion of the uranium changes it into a form suitable for enrichment. The enrichment process makes uranium suitable for use as nuclear fuel.

The Fuel Facilities Business Line also provides licensing and oversight support for a number of additional licensees that possess greater than critical mass quantities of special nuclear material (SNM), such as universities and research and test facilities.

FY 2020 Congressional Budget Justification l 75

FUEL FACILITIES Figure 12: Locations of Licensed Fuel Cycle Facilities Some licensed fuel facilities possess SNM, such as plutonium and enriched uranium. Those licensees verify and document their inventories and material transfers in the Nuclear Material Management and Safeguards System database. Fuel Facilities Business Line activities also include interactions with the Nuclear Materials Information Program (NMIP) and the interagency agreement with DOE for the certification and accreditation of classified computer systems at enrichment facilities.

The NMIP is an interagency effort managed by DOEs Office of Intelligence and Counterintelligence, in close coordination with the U.S. Departments of State, Defense, Homeland Security, and Justice, as well as the NRC and agencies under the Director of National Intelligence. The goal of the NMIP is to consolidate information from all sources pertaining to worldwide nuclear materials holdings and their security status into an integrated and continuously updated information management system.

Other activities supported by the Fuel Facilities Business Line include licensing action reviews, inspections, allegation and enforcement, rulemaking, development and implementation of security requirements, emergency preparedness, international cooperation and assistance, IAEA missions, and export and import licensing.

FY 2020 Congressional Budget Justification l 76

FUEL FACILITIES CHANGES FROM FY 2019 ENACTED BUDGET Resources decrease primarily as a result of (1) an expected decline in work associated with submission of license renewal applications, (2) a decrease in the anticipated number of license amendments, (3) efficiencies gained as a result of changes to the Fuel Facilities Inspection Program and workload projections, (4) a reduction in rulemaking activities involving enhanced security for SNM, and (5) elimination of workload associated with the Mixed-Oxide Fuel Fabrication Facility (MFFF).2 In addition, resources decrease under the Mission Support and Supervisors Product Line to reflect the reallocation of contract support resources to the Nuclear Materials Users Business Line to make budget execution more efficient.

Generally, resources budgeted in the Licensing and Oversight Product Lines impact fees for service. All other resources impact annual fees.

MAJOR ACTIVITIES The major activities within the Fuel Facilities Business Line include the following:

Ensure that licensed fuel facilities operate in accordance with the NRCs rules, regulations, and license requirements for safety and security.

Perform licensing and oversight activities for 10 fuel facilities, including conversion, enrichment, fuel fabrication, and uranium deconversion facilities. Licensing actions include reviews of license amendments, decommissioning funding plans, emergency plans, and security plans. Seven facilities are currently operating, and three licensed facilities have not started construction.

Support the regulation of 12 university and test research licensees under 10 CFR Part 70, Domestic Licensing of Special Nuclear Material.

Conduct inspections, force-on-force exercises, and readiness reviews.

Conduct rulemaking for fuel cycle facilities in security-related areas.

Support U.S. nonproliferation activities by implementing international safeguards and licensing the import and export of nuclear materials and equipment.

Support the NRCs work with international counterparts, including activities involving obligation tracking, approvals, and treaty compliance; 10 CFR Part 810, Assistance to Foreign Atomic Energy Activities; and review of the import and export of nuclear materials, technology, and equipment. Support bilateral visits with other countries possessing or obtaining U.S.-origin SNM with regard to physical protection and material 2 By letter dated November 1, 2018, MOX Services, LLC (MOX Services), formally notified the NRC that as of October 12, 2018, MOX Services ceased NRC-regulated construction activities on the MFFF at the Savannah River Site, near Aiken, SC. MOX Services ceased NRC-regulated construction following receipt of a Notice of Termination from the DOE/National Nuclear Security Administration (NNSA) of the contract between DOE/NNSA and MOX Services to design, build, and operate the MFFF. Because of the cessation of NRC-regulated construction activities at the MFFF and the Notice of Termination, MOX Services requested that the NRC terminate Construction Authorization No. CAMOX-001.

FY 2020 Congressional Budget Justification l 77

FUEL FACILITIES control and accounting. Provide technical assistance to IAEA and support U.S. initiatives to enhance international safeguards and verification programs.

Support the tracking of source material and SNM inventories, material balances, and transactions for more than 400 commercial manufacturers and users in the United States, in cooperation with DOE, through the Nuclear Material Management and Safeguards System.

140 127 115 117 120 109 Licensing Actions/Inspections 100 80 58 60 45 40 40 36 20 0

FY 2017 FY 2018 FY 2019* FY 2020*

Licensing Actions** Inspections***

  • Values provided for FY 2019-FY 2020 are projections.
    • Only license amendment reviews are included under Licensing Actions. License renewals and new license applications are excluded.
      • Total number of inspection procedures completed. Multiple inspection procedures are typically performed during an inspection.

Figure 13: Fuel Facilities Workload FY 2020 Congressional Budget Justification l 78

FUEL FACILITIES SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Fuel Facilities Business Line include the following:

Issued two 10-year license renewals for the possession of a greater than critical mass of SNM for the Massachusetts Institute of Technology and Pennsylvania State University.

Issued a memorandum documenting the closure of Generic Letter (GL) 2015-01, Treatment of Natural Phenomena Hazards in Fuel Cycle Facilities, dated June 22, 2015. Based on the technical review of the licensee responses to GL 2015-01 and the results of associated inspection activities, the NRC staff concluded that licensees performed appropriate evaluations of natural phenomena hazards for their facilities.

Issued an extensive update to Regulatory Guide 3.71, Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores, in October 2018, (Revision 3).

Issued two information notices (INs)IN 2018-05, Long-Term Fissile Material Accumulation Due to Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities, dated March 26, 2018, and IN 2018-06, Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures, dated April 10, 2018.

Published final revisions of 10 CFR Part 75, Safeguards on Nuclear Material Implementation of Safeguards Agreements Between the United States and the International Atomic Energy Agency, to implement the modified Small Quantities Protocol (mSQP) for U.S. Caribbean Territories and completed entry-into-force of the mSQP, including supporting licensees in completing initial inventories and submitting the inventories to IAEA.

FY 2020 Congressional Budget Justification l 79

FUEL FACILITIES OTHER INDICATORS LICENSING Percentage of Fuel Cycle Licensing Reviews Completed in 150 Days or Less (FF-04)

Fiscal Year Target Actual Comment New indicator in FY 2014 FY 2015 Eleven licensing actions exceeded the 150-day performance metric because of complex licensing issues. Improvement plans include FY 2015 80 77 sharing lessons learned, evaluating the licensing tracking process, and increasing management oversight.

FY 2016 80 91 FY 2017 80 90 FY 2018 80 100 FY 2019 80 FY 2020 80 Percentage of Fuel Cycle Licensing Reviews Completed in 1.5 Years or Less (FF-05)

Fiscal Year Target Actual Comment New indicator in FY 2014 FY 2015 One licensing action exceeded the 1.5-year metric because of a significantly expanded scope from the initial review of the action.

Improvement plans include reviewing licensing guidance to determine FY 2015 100 98 whether updates are needed, sharing lessons learned, and communicating with licensees about potential impacts to schedules as issues arise or changes are requested.

FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 OVERSIGHT Percentage of Technical Allegation Reviews Completed in 180 Days or Less (FF-07)

Fiscal Year Target Actual Comment FY 2014 95 97 FY 2015 95 100 FY 2016 95 100 FY 2017 95 100 FY 2018 95 100 FY 2019 95 FY 2020 95 Percentage of Technical Allegation Reviews Completed in 360 Days or Less (FF-08)

Fiscal Year Target Actual Comment One allegation was open for 395 days; therefore, the business line did FY 2014 100 97 not meet the allegation timeliness metric of closing 100 percent of all allegations in 360 days.

FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 FY 2020 Congressional Budget Justification l 80

FUEL FACILITIES Percentage of Operating Fuel Facilities for which the Core Inspection Program Was Completed as Planned during the Most Recently Ended Inspection Cycle (FF-09)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 100 DISCONTINUED INDICATORS Percentage of Technical Allegation Reviews Completed in 150 Days or Less (FF-06)

Fiscal Year Target Actual Comment FY 2014 90 95 FY 2015 90 100 FY 2016 90 100 FY 2017 90 100 FY 2018 Discontinued Indicator to be tracked internally.

FY 2019 N/A FY 2020 N/A Percentage Assessment of the Agencys Readiness to Respond to a Nuclear or Terrorist Emergency Situation or Other Events of National Interest* (FF-10)

Fiscal Year Target Actual Comment New indicator in FY 2014 FY 2015 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 FY 2018 100 100 FY 2019 100 FY 2020 Discontinue Indicator to be tracked internally.

  • This performance index provides a single overall performance indicator of the agencys readiness to respond to a nuclear or terrorist emergency situation or other event of national interest. The index measures several activities in the Incident Response Program that are critical for supporting the agencys preparedness and response ability.

Percentage of Information Assessment Team Advisories Issued within 24 Hours of Notification (FF-11)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 90 100 FY 2017 90 100 FY 2018 90 100 FY 2019 90 This indicator is no longer useful because the NRC has issued no FY 2020 Discontinue Information Assessment Team Advisories since 2014.

FY 2020 Congressional Budget Justification l 81

CORPORATE SUPPORT CORPORATE SUPPORT Corporate Support by Product Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted* Request FY 2019 Product Line $M FTE $M FTE $M FTE $M FTE Acquisitions 14.6 51.2 15.6 54.0 15.2 51.0 (0.5) (3.0)

Administrative Services 89.8 73.6 85.5 76.0 89.3 78.0 3.8 2.0 Financial Management 34.0 99.9 32.2 99.0 29.7 96.0 (2.5) (3.0)

Human Resource Management 19.2 48.0 17.7 44.0 22.9 44.0 5.2 0.0 IT/IM Resources 107.4 179.1 104.9 174.0 97.9 179.0 (7.1) 5.0 Outreach 3.5 13.0 3.3 13.0 3.2 13.0 (0.1) 0.0 Policy Support 22.8 115.6 29.3 136.0 30.3 137.0 0.9 1.0 Training 5.2 13.6 4.3 13.0 4.2 13.0 (0.2) 0.0 Total $296.4 594.0 $292.9 609.0 $292.6 611.0 $(0.4) 2.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, administrative services and IT/IM activities within the Corporate Support Business Line were funded

$4 million and $2.6 million, respectively, through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

The NRCs Corporate Support Business Line involves centrally managed activities that are necessary for agency programs to accomplish the agencys mission and achieve goals. These activities include acquisitions, administrative services, financial management, human resource management, IT/information management (IM), outreach, policy support, and training.

The FY 2020 resources requested for the Corporate Support Business Line constitute approximately 32 percent of the agencys total budget and remain relatively flat with a

$0.4 million decrease, including an increase of two FTE, when compared with the FY 2019 Enacted Budget. The FY 2020 budget request supports continuing efforts to modernize IT to increase productivity and security, leverage data as a strategic asset, share quality services, leverage common contracts and best practices to drive cost reductions and efficiencies, improve outcomes through Federal IT spending transparency, improve the management of major acquisitions, improve the efficiency and effectiveness of administrative services, develop agency workforce, focus on the highest value work, and improve the customer experience with Federal services.

Appendix E, Federal Information Technology Acquisition Reform Act Requirements, to this report contains a complete list of the NRCs IT investments, including those budgeted in the Corporate Support Business Line and in the other business lines.

FY 2020 Congressional Budget Justification l 83

CORPORATE SUPPORT CHANGES FROM FY 2019 ENACTED BUDGET Resources remain relatively flat in FY 2020 as a result of modernizing agency IT by moving to a more secure and cost-effective infrastructure. As such, the decrease in the Corporate Support Business Line is primarily attributable to reductions in the IT/IM Resources Product Line, which are largely associated with the transition to the NRCs Global Infrastructure and Development Acquisition and the General Services Administrations Enterprise Infrastructure Solutions contract. Additional reductions are the result of planned and completed innovations, including implementation of a cloud-based e-mail service, consolidation of nontiered data centers, and implementation of unified communications and IT asset management services. Resources also decrease in the IT/IM Resources Product Line as a result of resource shifts to the Operating Reactors Business Line to properly align electronic journal subscriptions and specific controlled document networks with the mission area they support. Resources also decrease in the IT/IM Resources Product Line as a result of a redistribution across programmatic business lines to properly align costs for seat management and workstation support, e-mail/messaging, file/print, and network infrastructure services based on FTE distribution.

In addition, mission IT resources decrease in multiple corporate support product lines as a result of cost reductions for operations and maintenance and fewer system enhancements. Mission IT resources in the Financial Management Product Line decrease as a result of reduced hosting, software, and support costs for the Financial Accounting and Integrated Management Information System, Human Resources Management System, and Budget Formulation System as a result of migration to the cloud.

In accordance with Executive Order 13834, Executive Order Regarding Efficient Federal Operations, dated May 17, 2018, decreases also include reductions in utility costs at NRC Headquarters as a result of energy efficiencies gained from building improvements. In addition, by leveraging common contracts and best practices to drive savings and efficiencies, the budget request for Corporate Support reflects reduced costs for various administrative support services (e.g., Federal Register notices, U.S. Government Publishing Office services, agency central printing, paper, mail services, transcription services).

The budget request also includes reductions in both the Acquisitions and Financial Management Product Lines, based on efficiencies and current and projected declines in workload.

Reductions are partially offset by an increase in the Acquisitions Product Line to support a nondiscretionary biennial upgrade for the Strategic Acquisition System, and in the Training Product Line to support operations and maintenance of the Talent Management System and its associated help desk to support the agencys efforts to develop NRCs workforce. The IT/IM Product Line resources increase to digitize paper-based Atomic Energy Commission documents from years before 1979, in accordance with the U.S. Office of Management and Budget (OMB) direction to accelerate the transition to the electronic management, transfer, and preservation of permanent Government records and to support compliance with the direction provided by OMB and the Federal Chief Information Officer Council on Identity, Credential, and Access Management.

The FY 2020 budget request includes an increase for rent, following the period of reduced rent from the limited-time 7-month rent abatement for the Two White Flint North building in FY 2019, which was part of the negotiation for renewal of the building lease. This increase is partially offset by the release of office and related space. The budget request includes an increase for renovation for the One White Flint North building to configure the space to accommodate more FY 2020 Congressional Budget Justification l 84

CORPORATE SUPPORT employees in less square footage as the agency releases other leased space at Headquarters.

The budget includes an increase in FTE to support implementation of the Office of the Director of National Intelligence (ODNI) requirements in Security Executive Agent Directive 3, Reporting Requirements for Personnel with Access to Classified Information or Who Hold a Sensitive Position, dated December 14, 2016, as well as timeliness metrics for adjudications, stipulated by ODNI within the Intelligence Reform and Terrorism Prevention Act of 2004.

When compared with the FY 2019 Enacted Budget, the resources for the Administrative Services Product Line increase. This variance is due to $4 million funded in FY 2019 through the application of authorized prior-year carryover. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, which provides a comparison of the FY 2020 request to the FY 2019 Budget Authority.

The Human Resource Management Product Line increases as a result of the permanent-change-of-station costs, and the Policy Support Product Line increases to support a Commission at its full complement of five members.

MAJOR ACTIVITIES The major activities within the Corporate Support Business Line include the following:

Perform contract operations and oversight necessary to ensure that the agency obtains goods and services to support mission needs.

Provide rent and utilities for NRC Headquarters, regional offices, and the Technical Training Center; building operations and maintenance; general building alterations; furniture and workstation modifications; labor and custodial services; guard services; security investigations; drug testing; security equipment and support; insider threat program; vehicle fleet management; transit subsidies; print and publication services; transcription and adjudicatory hearing support; technical editing; graphic design; audiovisual services; postage and mail services; and office supplies.

Maintain and operate the agencys financial systems and manage budget development and execution, agency financial services, accounting and reporting activities, development of the annual fee rule, and administration of the internal control program.

Conduct human resource management activities, work-life services, employee and labor relations, enhanced strategic workforce planning, and permanent change-of-station, including resident inspector moves.

Manage the IT/IM portfolio, including the following:

- Maintain cost-effective enterprise solutions and secure infrastructure technologies and services to enable the agencys mission and corporate functions.

- Promote mobility to respond to mission needs.

- Ensure effective management and appropriate dissemination of physical and electronic information and records.

FY 2020 Congressional Budget Justification l 85

CORPORATE SUPPORT

- Provide public meeting support to ensure transparency and promote public involvement in the agencys regulatory activities.

- Support the Public Document Room and Technical Library.

- Support essential information collections and implementation of the Freedom of Information Act and Privacy Act.

- Develop and implement cybersecurity policies and standards to mitigate cybersecurity vulnerabilities, threats, and incidents.

- Prevent unauthorized disclosure of NRC information and protect classified and controlled unclassified information.

- Support Enterprise Architecture, capital planning, IT governance, and other functions of the Chief Information Officer.

- Improve outcomes through Federal IT spending transparency.

- Make targeted investments in transformational activities to yield future cost savings or avoidance, such as modernizing IT to increase productivity and security; supporting disaster recovery and continuity of operations planning, testing, and management; and moving from the current tape library backup system to a cloud backup solution.

Maintain the civil rights complaints process; promote affirmative employment, diversity, and inclusion; ensure compliance with small business laws; conduct business development assistance and provide the maximum practicable prime and subcontract opportunities for small businesses; and continue efforts to implement the NRCs Outreach and Compliance Coordination Program, in accordance with applicable Federal civil rights statutes and NRC regulations.

Provide agencywide policy formulation and guidance, strategic planning, performance management, legal advice and appellate adjudicatory support to the Commission, independent evaluations of agency programs and implementation of Commission policy directives, advice and assistance to the Commission on congressional and protocol issues and public affairs activities, management and oversight of agency programs, interactions on matters of international nuclear safety and security issues and developments, and operation of the Commissioners offices.

Maintain the agencys corporate support training infrastructure, including operation of the Professional Development Center, agency leadership programs such as the Senior Executive Service Career Development Program, organizational development, training systems, and corporate-related external training.

FY 2020 Congressional Budget Justification l 86

CORPORATE SUPPORT SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The significant accomplishments within the Corporate Support Business Line include the following:

Fully transitioned the NRCs mobility services from the legacy IT Infrastructure Services and Support contract to a Global Infrastructure and Development Acquisition Blanket Purchase Agreement and began similarly transitioning Security Operations Center work.

Achieved the goal of having 100 percent of agency systems under an active Authority to Operate.

Completed the remaining four FY 2018 fee transformation items, including redesigning invoices, to further improve transparency of costs.

Fully transitioned to a Federal Shared Service Provider for support of financial services in accounts payable, accounts receivable, and travel.

Received an A+ Small Business grade. This marked the sixth consecutive year that the Small Business Administration has recognized the NRC for meeting its goal, and the agencys second consecutive A+.

Completed the enhanced strategic workforce planning process pilot. Results showed the process can be used to better integrate the agencys workload projection, skills identification, human capital management, individual development, and workforce management activities. The Executive Director for Operations approved broader agency implementation, which is currently underway.

Executed the release of approximately 25,000 square feet of office and related space in Three White Flint North, anticipated to yield savings of $1.2 million in annual rent and security costs in FY 2019 and beyond.

FY 2020 Congressional Budget Justification l 87

CORPORATE SUPPORT OTHER INDICATORS ACQUISITIONS Percentage of Spend Under Management* (CS-03)

Fiscal Year Target Actual Comment FY 2019 38 Target will be equal to the target set for Chief Financial Officers Act of FY 2020 TBD 1990 agencies by the Presidents Management Council for FY 2020.

  • Spend under management is a key measure of an agencys use of smart buying practices, such as strong strategic leadership and oversight, and the collection and sharing of critical data, including terms and conditions, performance, and prices paid.

ADMINISTRATIVE SERVICES NRC-Leased Space Compared to the Agencys FY 2015 Freeze the Footprint Baseline (1,033,171 Usable Square Feet (USF)White Flint Campus) (CS-18)

Fiscal Year Target Actual Comment New in FY 2020 FY 2020 619,000 USF This is a new indicator for FY 2020 and replaces CS-05.

HUMAN RESOURCE MANAGEMENT Percentage of Key Human Capital Indicators Met* (CS-16)

Fiscal Year Target Actual Comment FY 2015 75 75 FY 2016 75 75 FY 2017 75 75 FY 2018 75 75 FY 2019 75 FY 2020 75

  • The specific subindicators that will be included under this indicator will be evaluated and updated on an annual basis to reflect agency needs. Examples may include the percentage of time that information complaints and investigations of formal complaints of discrimination are within time guidelines; whether agency staffing levels are equal to or less than the agency FTE ceiling; the NRCs averaged index scores for employee engagement, global satisfaction, and new IQ (diversity and inclusion); the number of training assessments completed for efficiency and effectiveness gains using blended learning solutions; and the percentage of strategic workforce planning and competency activities planned that are successfully implemented.

FY 2020 Congressional Budget Justification l 88

CORPORATE SUPPORT FINANCIAL MANAGEMENT Percentage of Collections Achieved When Compared with Projected Collections (CS-06)

Fiscal Year Target Actual Comment Contributing factors to missing the target include a fee policy written to collect 98 percent of the 90-percent target and a final fee rule that did not become effective until the end of August, leaving no time to recover FY 2014 100 93.6 from licensee delays in the payment of fees.

FY 2015 100 99.6 FY 2016 100 98.4 FY 2017 100 98.1 The target was reduced to 98 percent to comply with the regulatory requirement to collect approximately 90 percent of the agencys FY 2018 >98 98.9 appropriation.

FY 2019 >98 FY 2020 98 Percentage of Fee Transformation Items Planned That Are Successfully Implemented (CS-19)

Fiscal Year Target Actual Comment New in FY 2020 FY 2020 80 INFORMATION TECHNOLOGY/INFORMATION MANAGEMENT The NRC's Score on the Annual American Customer Satisfaction Index for Federal Web Sites (CS-10)

Fiscal Year Target Actual Comment FY 2014 73 76 FY 2015 73 79 FY 2016 73 81 FY 2017 73 78 FY 2018 73 78 FY 2019 73 FY 2020 73 Percentage of Projects within Schedule and within Budget Based on Information Collected for Major IT Investments Reported to the OMB IT Dashboard (CS-13)

Fiscal Year Target Actual Comment

>= 80%

projects on schedule and on FY 2019 budget

>= 85% Based on experience using this indicator in FY 2018, the targets for of schedule and budget are being separated out to provide better projects transparency for the information from the OMB IT Dashboard. In within addition, the target for projects within schedule is being increased to schedule, continue the focus on improving agency performance.

and >=

80% of projects within FY 2020 budget FY 2020 Congressional Budget Justification l 89

CORPORATE SUPPORT DISCONTINUED INDICATORS Percentage of Eligible Service Contracting Dollars (Contracts over $25,000) That Use Performance-Based Contracting Techniques during the Fiscal Year (CS-01)

Fiscal Year Target Actual Comment FY 2014 65 64 FY 2015 65 68 The annual metric for performance-based contracting ran 1.8 percent FY 2016 65 63 less than the annual target, which is within the margin of error.

Many contracts awarded by the NRC were not suitable to be FY 2017 65 62 performance-based contracts.

Not all services must be awarded as performance-based contracts.

Therefore, this indicator does not provide useful information on the effectiveness of the NRCs acquisition organization, and it is being FY 2018 Discontinued discontinued.

FY 2019 N/A FY 2020 N/A Percentage of Required Synopses for Acquisitions That Are Posted on the Governmentwide Point-of-Entry Web Site (www.FedBizOpps.gov) during the Fiscal Year (CS-02)

Fiscal Year Target Actual Comment FY 2014 100 100 FY 2015 100 100 FY 2016 100 100 FY 2017 100 100 The Federal Acquisition Regulation requires the posting of synopses on FedBizOpps for procurements over a certain dollar value. Posting required synopses has never been a challenge at the NRC, and the goal of 100 percent has been met every year. Because this indicator does not provide useful information on the effectiveness of the NRCs FY 2018 Discontinued acquisition organization, it is being discontinued.

FY 2019 N/A FY 2020 N/A Percentage of Time Physical Security Responds to Incidents That Result in Harm to Occupants, Damage to NRC Property, or Loss of Protected Information within 15 Minutes of Notification (CS-04)

Fiscal Year Target Actual Comment FY 2014 New indicator in FY 2015 FY 2016 FY 2016 90 100 FY 2017 90 100 FY 2018 90 100 This indicator is tracked by alarm response logs that the security guards maintain to ensure that the requirement to respond to an alarm in specific agency rooms, such as secure or other limited access areas, within 15 minutes of an alarm is met. Given this level of operational FY 2019 Discontinued detail, this will now be maintained as an internal agency indicator.

FY 2020 N/A FY 2020 Congressional Budget Justification l 90

CORPORATE SUPPORT Percentage of NRC-Leased Space Compared to the Agencys FY 2012 Freeze the Footprint Baseline (1,170,242 Usable Square Feet) (CS-05)

Fiscal Year Target Actual Comment FY 2014 N/A FY 2015 N/A FY 2016 N/A FY 2017 N/A FY 2018 N/A FY 2019 96 New indicator for FY 2019.

Replaced with indicator CS-18. For FY 2020, the percentage is based upon the 2015 Reduce the Footprint office space baseline of FY 2020 Discontinue 1,033,171 USF.

Percentage of Annual Billings That Are Past Due Accounts Receivable (CS-07)

Fiscal Year Target Actual Comment FY 2014 1 1 FY 2015 1 1 FY 2016 1 0.7 The target was not met as a result of $3,720,089 in invoices that were only 2 days overdue, and $966,210 in invoices protected by the FY 2017 1 1.6 Westinghouse Electric Company, LLC bankruptcy filing.

FY 2018 <1 0.7 FY 2019 <1 Indicator will be tracked internally to support streamlining corporate FY 2020 Discontinue support indicator reporting.

Percentage of Nonsalary Payments Made Electronically and Accurately within Established Schedule (CS-08)

Fiscal Year Target Actual Comment FY 2014 98 98 FY 2015 98 98 FY 2016 98 98 FY 2017 98 99.6 FY 2018 98 99 FY 2019 98 Indicator will be tracked internally to support streamlining corporate FY 2020 Discontinue support indicator reporting.

Number of Targets Met Out of Four for Key Information Dissemination Channels (Freedom of Information Act, Public Meetings Notices, and Public Document Release Timeframe)* (CS-09)

Fiscal Year Target Actual Comment FY 2014 3 4 FY 2015 3 3 FY 2016 3 4 FY 2017 4 5 FY 2018 4 4 Most of the targets associated with this indicator are either tracked at the agency level or subject to other external reporting, or both. As such, this indicator will continue to be tracked internally to ensure that FY 2019 Discontinued the agency is meeting the multiple dissemination targets.

FY 2020 N/A

  • Targets: (1) Percentage of time the NRC responds to Freedom of Information Act requests within 20 working days (75 percent), (2) percentage of Category 1, 2, and 3 meetings on regulatory issues for which the NRC posted a meeting notice on the public meeting notice Web site at least 10 days in advance of the meeting (90 percent),

(3) percentage of nonsensitive, unclassified regulatory documents generated by the NRC and sent to the agency's Document Processing Center that are released to the public by the sixth working day after the date of the document (90 percent), and (4) percentage of nonsensitive, unclassified regulatory documents received by the NRC that are released to the public by the sixth working day after the document is added to the ADAMS main library (90 percent).

FY 2020 Congressional Budget Justification l 91

CORPORATE SUPPORT Percentage of Agency Investments That Are Green per OMBs IT Dashboard (CS-11)

Fiscal Year Target Actual Comment The OMB Exhibit 300 score indicator IT Investment Management Average Score on a Scale of 110 for All NRC IT Investments on the OMB IT Dashboard, was replaced with Percentage of Agency Target Investments That Are Green per OMBs IT Dashboard, beginning in FY 2014 7.5 met FY 2015.

Target FY 2015 80 met FY 2016 80 90 FY 2017 80 84 FY 2018 80 85 Replaced for FY 2019 with indicator CS-13, which provides more FY 2019 Discontinued quantitative information.

FY 2020 N/A Satisfactory Rating Achieved for the NRC's Cybersecurity Program Effectiveness Based upon the Annual Inspector General Federal Information Security Management Act (FISMA) Audit (CS-12)

Fiscal Year Target Actual Comment OIG did not report any material weaknesses in its evaluation report FY 2014 Yes Yes (OIG-15-A-02).

OIG did not report any material weaknesses in its evaluation report FY 2015 Yes Yes (OIG-16-A-01)

OIG did not report any material weaknesses in its evaluation report FY 2016 Yes Yes (OIG-17-A-01)

OIG did not report any material weaknesses in its evaluation report FY 2017 Yes Yes (OIG-18-A-01)

FY 2018 Discontinued This indicator does not measure the impact or effectiveness of the cybersecurity program. The Cybersecurity Performance Index will be substituted, which will demonstrate the change in cybersecurity posture FY 2019 N/A year over year, with results reported internally.

FY 2020 N/A The NRCs Annual Average Rank among Top Agencies across the U.S. Office of Personnel Management (OPM) Human Capital Indices on the Federal Employee Viewpoint Survey (FEVS) (CS-14)

Fiscal Year Target Actual Comment FY 2015 5 4 Based on the 2016 FEVS results from OPM, the NRC was ranked seventh overall. To ensure an engaged workforce, the NRC is implementing an agencywide action plan aimed at cultivating an NRC culture that fosters a greater climate of trust, as well as office-specific plans. Action leads have been encouraged to revise plans, as FY 2016 5 7 needed, in accordance with current FEVS results.

FY 2017 5 9 FY 2018 Discontinued Replaced with indicator CS-15.

FY 2019 N/A FY 2020 N/A The NRCs Averaged Index Scores for Employee Engagement, Global Satisfaction, and New IQ (Diversity and Inclusion) Remain at Least 7.5% Above the Federal Employee Viewpoint Survey (FEVS)

Governmentwide Average Score (CS-15)

Fiscal Year Target Actual Comment FY 2015 N/A FY 2016 N/A FY 2017 N/A FY 2018 7.5 10 New indicator for FY 2018.

FY 2019 7.5 This indicator will be tracked internally to support streamlining corporate FY 2020 Discontinue support indicator reporting.

FY 2020 Congressional Budget Justification l 92

INTEGRATED UNIVERSITY PROGRAM INTEGRATED UNIVERSITY PROGRAM Integrated University Program (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Actuals Enacted Request FY 2019 Business Line $M FTE $M FTE $M FTE $M FTE Integrated University Program $15.5 0.0 $15.0 0.0 $0.0 0.0 $(15.0) 0.0 Total $15.5 0.0 $15.0 0.0 $0.0 0.0 $(15.0) 0.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

The Integrated University Program provides grants to academic institutions to support education in nuclear science and engineering and related fields. The NRC has provided funding for university research and development as well as for scholarships, fellowships, and faculty development. In addition, the agency strives to include minority-serving institutions as part of the program through the competitive grant selection process.

CHANGES FROM FY 2019 ENACTED BUDGET Resources for the Integrated University Program are not included in the FY 2020 budget request.

SIGNIFICANT ACCOMPLISHMENTS IN FY 2018 The NRC awarded 51 grants totaling more than $15.5 million to 40 academic institutions in 25 States.

FY 2020 Congressional Budget Justification l 93

ANNUAL PERFORMANCE PLAN ANNUAL PERFORMANCE PLAN The NRC published its strategic plan (NUREG-1614, Volume 7) for FY 2018-FY 2022 in February 2018. The plan lists the agencys strategic goals and their associated objectives. This chapter of the NRCs Performance Budget provides the performance goals and performance indicators and criteria associated with the NRCs strategic plan.

The Government Performance and Results Act (GPRA) Modernization Act of 2010 requires a more integrated framework for planning and performance management that demonstrates a governance structure showing better connection of plans, programs, and performance information in the Performance Budget. More specifically, the law requires an agency to describe how the performance goals contained in its performance plan contribute to the goals and objectives established in the agencys strategic plan. The performance indicators in this section reflect these goals and objectives.3 The NRCs mission is to license and regulate the Nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. Therefore, the trends for progress on the agencys strategic goals and objectives are to be at either zero or very low levels. The agency works to prevent or minimize the outcomes tracked by the safety and security performance indicators.

FY 2020 Strategic Goals Goal 1: Safety: Ensure the safe use of radioactive materials.

Safety Objective 1: Prevent, mitigate, and respond to accidents and ensure radiation safety.

Goal 2: Security: Ensure the secure use of radioactive materials.

Security Objective 1: Ensure protection of nuclear facilities and radioactive materials.

Security Objective 2: Ensure protection of classified and Controlled Unclassified Information.

3 On July 20, 2011, OMB exempted the NRC from the GPRA Modernization Act of 2010 requirement for establishing agency or cross-agency priority goals because of the NRCs statutory mission to be an independent regulator of the civilian use of radioactive materials. Thus, this narrative includes no such goals.

FY 2020 Congressional Budget Justification l 95

ANNUAL PERFORMANCE PLAN RELATING RESOURCES TO GOALS The following table shows the alignment of the NRCs fully costed Nuclear Reactor Safety Program and Nuclear Materials and Waste Safety Program with the safety and security goals.

The full cost includes an allocation of the agencys infrastructure and support costs to specific programs.

Alignment of Resources to NRC Goals (Dollars in Millions)

(Excludes Office of the Inspector General)

FY 2019 FY 2020 Enacted Request Major Programs Safety Security Total Safety Security Total Nuclear Reactor Safety 640.4 65.0 705.4 634.1 38.9 673.0 Nuclear Materials and Waste Safety 157.0 36.0 193.0 199.4 35.4 234.8 Total $797.3 $101.0 $898.4 $833.5 $74.3 $907.8

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

PERFORMANCE INDICATORS: FY 2018-FY 2022 The NRC developed the following performance indicators in conjunction with the development of the agencys FY 2018-2022 Strategic Plan.

Safety Objective 1: Prevent, mitigate, and respond to accidents and ensure radiation safety.

Performance Goal 1: Prevent radiation exposures that significantly exceed regulatory limits.

Performance Indicator: Number of radiation exposures that meet or exceed Abnormal Occurrence (AO) Criteria I.A.1 (unintended radiation exposure to an adult), I.A.2 (unintended radiation exposure to a minor), or I.A.3 (radiation exposure that has resulted in unintended permanent functional damage to an organ or physiological system)4 Timeframe: Annual 4 All references to the AO criteria in this section refer to the criteria approved by the Commission in SRM-SECY-17-0019, Staff RequirementsSECY-17-0019Final Revision to Policy Statement on Abnormal Occurrence Reporting Criteria, dated August 24, 2017.

FY 2020 Congressional Budget Justification l 96

ANNUAL PERFORMANCE PLAN Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Operating Reactors Target 0 0 0 0 0 0 Operating Reactors Actual 0 0 0 0 New Reactors Target 0 0 0 0 0 0 New Reactors Actual 0 0 0 0 Fuel Facilities Target 0 0 0 0 0 0 Fuel Facilities Actual 0 0 0 0 Decommissioning and Target 0 0 0 0 0 0 Low-Level Waste Decommissioning and Actual 0 0 0 0 Low-Level Waste Spent Fuel Storage and Target 0 0 0 0 0 0 Transportation Spent Fuel Storage and Actual 0 0 0 0 Transportation Nuclear Materials Users Target <3 <3 <3 <3 <3 <3 Nuclear Materials Users Actual 1* 2 0 1

  • Reported in the FY 2017 Congressional Budget Justification as 2 because of one event previously labeled as an AO reclassified upon further investigation as not meeting the AO threshold.

Performance Goal 2: Prevent releases of radioactive materials that significantly exceed regulatory limits.

Performance Indicator: Number of releases of radioactive materials that meet or exceed AO Criterion I.B (discharge or dispersal of radioactive material from its intended place of confinement)

Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Operating Reactors Target 0 0 0 0 0 0 Operating Reactors Actual 0 0 0 0 New Reactors Target 0 0 0 0 0 0 New Reactors Actual 0 0 0 0 Fuel Facilities Target 0 0 0 0 0 0 Fuel Facilities Actual 0 0 0 0 Decommissioning and Target 0 0 0 0 0 0 Low-Level Waste Decommissioning and Actual 0 0 0 0 Low-Level Waste Spent Fuel Storage and Target 0 0 0 0 0 0 Transportation Spent Fuel Storage and Actual 0 0 0 0 Transportation Nuclear Materials Users Target 0 0 0 0 0 0 Nuclear Materials Users Actual 0 0 0 0 Performance Goal 3: Prevent the occurrence of any inadvertent criticality events.

Performance Indicator: Number of instances of unintended nuclear chain reactions involving NRC-licensed radioactive materials Timeframe: Annual FY 2020 Congressional Budget Justification l 97

ANNUAL PERFORMANCE PLAN Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Operating Reactors Target 0 0 0 0 0 0 Operating Reactors Actual 0 0 0 0 Fuel Facilities Target 0 0 0 0 0 0 Fuel Facilities Actual 0 0 0 0 Decommissioning and Target 0 0 0 0 0 0 Low-Level Waste Decommissioning and Actual 0 0 0 0 Low-Level Waste Performance Goal 4: Prevent accident precursors and reductions of safety margins at commercial nuclear power plants (operating or under construction) that are of high safety significance.

Performance Indicator: Number of malfunctions, deficiencies, events, or conditions at commercial nuclear power plants (operating or under construction) that meet or exceed AO Criteria II.A-II.E (commercial nuclear power plant licensees)

Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Operating Reactors Target 0 0 0 0 0 0 Operating Reactors Actual 0 0 0 0 New Reactors Target 0 0 0 0 0 0 New Reactors Actual 0 0 0 0 Performance Goal 5: Prevent accident precursors and reductions of safety margins at nonreactor facilities or during transportation of nuclear materials that are of high safety significance.

Performance Indicator: Number of malfunctions, deficiencies, events, or conditions at nonreactor facilities or during transportation of nuclear materials that meet or exceed AO Criteria III.A or III.B (events at facilities other than nuclear power plants and all transportation events)

Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Fuel Facilities Target 0 0 0 0 0 0 Fuel Facilities Actual 0 1* 0 0 Decommissioning and Target 0 0 0 0 0 0 Low-Level Waste Decommissioning and Actual 0 0 0 0 Low-Level Waste Spent Fuel Storage and Target 0 0 0 0 0 0 Transportation Spent Fuel Storage and Actual 0 0 0 0 Transportation

  • Reported in the FY 2018 Congressional Budget Justification. As referenced in NUREG-0090, Volume 39, Report to Congress on Abnormal Occurrences, Fiscal Year 2016, dated May 2, 2017 (ADAMS Accession No. ML17103A289),

an event occurred at the Westinghouse Columbia Fuel Fabrication Facility, Columbia, SC (NRC16-03).

FY 2020 Congressional Budget Justification l 98

ANNUAL PERFORMANCE PLAN Security Objective 1: Ensure protection of nuclear facilities and radioactive materials.

Performance Goal 1: Prevent sabotage, theft, diversion, or loss of risk-significant quantities of radioactive material.

Performance Indicator: Number of instances of sabotage, theft, diversion, or loss of risk-significant quantities of radioactive material that meet or exceed AO Criteria I.C.1 (stolen, abandoned, or unrecovered lost),

I.C.2 (radiological sabotage), or I.C.3 (substantiated case of actual theft, diversion, or loss of a formula quantity of SNM or inventory discrepancy)

Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 All Business Lines Target 0 0 0 0 0 0 All Business Lines Actual 0 0 0 0 Performance Goal 2: Prevent substantial breakdowns of physical security, cybersecurity, or material control and accountability.

Performance Indicator: Number of substantial breakdowns of physical security, cybersecurity, or material control and accountability that meet or exceed AO Criteria I.C.4 (substantial breakdown of physical security, cybersecurity, or material control and accountability), or I.C.3 (substantiated case of actual theft, diversion, or loss of a formula quantity of SNM or an inventory discrepancy)

Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 All Business Lines Target 1 1 1 1 1 1 All Business Lines Actual 0 0 0 0 Security Objective 2: Ensure protection of classified and Controlled Unclassified Information.

Performance Goal 3: Prevent significant unauthorized disclosures of classified or Safeguards Information.

Performance Indicator: Number of significant unauthorized disclosures of classified or Safeguards Information by licensees as defined by AO Criterion I.C.5 (significant unauthorized disclosures of classified information or Safeguards Information) and by NRC employees or contractors, as defined by NRC internal criteria Timeframe: Annual Business Line FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 All Business Lines Target 0 0 0 0 0 0 All Business Lines Actual 0 0 0 0 FY 2020 Congressional Budget Justification l 99

ANNUAL PERFORMANCE PLAN VERIFICATION AND VALIDATION OF PERFORMANCE INDICATORS Goal 1: Safety: Ensure the safe use of radioactive materials.

Nuclear Reactor Safety Safety Objective 1: Prevent, mitigate, and respond to accidents and ensure radiation safety.

Performance Indicators:

FY 2015-2020: Performance Goal 1: Number of radiation exposures that meet or exceed AO Criteria I.A.1 (unintended radiation exposure to an adult), I.A.2 (unintended radiation exposure to a minor), or I.A.3 (radiation exposure that has resulted in unintended permanent functional damage to an organ or physiological system)

Reactor Safety Target: Zero Verification: Licensees report overexposures through the licensee event report (LER) process, and the reports are then entered into a searchable database. The database is used to identify those LERs that report overexposures. NRC resident inspectors stationed at each nuclear power plant provide a high degree of assurance that all events meeting reporting criteria are reported to the NRC. In addition, the NRC conducts inspections if there is any indication that an exposure exceeded, or could have exceeded, a regulatory limit. Finally, areas of the facility that may be subject to radiation contamination have monitors that record radiation levels. These monitors would immediately reveal any instances in which high levels of radiation exposure occurred.

Validation: Given the nature of the process of using radioactive materials to generate power, overexposure to radiation is a potential danger from the operation of nuclear power plants. Such exposure to radiation in excess of the applicable regulatory limits may potentially occur through either a nuclear accident or other malfunctions at the plant. Consequently, tracking the number of overexposures that occur at nuclear reactors is an important indicator of the degree to which safety is being maintained.

FY 2015-2020: Performance Goal 2: Number of releases of radioactive materials that meet or exceed AO Criterion I.B (discharge or dispersal of radioactive material from its intended place of confinement)

Reactor Safety Target: Zero Verification: Licensees report environmental releases of radioactive materials that are in excess of regulations or license conditions through the LER process, and the reports are then entered into a searchable database. The database is used to identify those LERs reporting FY 2020 Congressional Budget Justification l 100

ANNUAL PERFORMANCE PLAN releases, and the number of reported releases is then applied to this indicator. The NRC also conducts periodic inspections of licensees to ensure that they properly monitor and control releases to the environment through effluent pathways. In addition, onsite monitors record any occasions when a plant releases radiation into the environment. If the inspections or the monitors reveal any indication that an accident or inadvertent release has occurred, the NRC conducts follow-up inspections.

Validation: The generation of nuclear power creates radioactive materials that are released into the environment in a controlled manner.

These radioactive discharges are subject to regulatory controls that limit the amount discharged and the resultant dose to members of the public. Consequently, the NRC tracks all releases of radioactive materials in excess of regulatory limits as a performance indicator because large releases in excess of regulatory limits have the potential to endanger public safety or harm the environment. The NRC inspects every nuclear power plant for compliance with regulatory requirements and specific license conditions related to radiological effluent releases. The inspection program includes enforcement actions for violations of the regulations or license conditions, based on the severity of the event. This performance indicator includes the public dose limits in 10 CFR Part 20, Standards for Protection against Radiation.

FY 2015-2020: Performance Goal 3: Number of instances of unintended nuclear chain reactions involving NRC-licensed radioactive materials Reactor Safety Target: Zero Verification: An accidental criticality is defined in 10 CFR 70.52(a). Each NRC program office or region reviews event documents for its specific program area to identify events as potential AOs.

The program office or regional AO coordinators will assess an event to determine whether it meets the AO criteria. If an event meets the AO criteria, the program office or regional AO coordinator will develop a potential AO event description. The potential AO event description will include the applicable AO criteria and contain the information specified in Section 208 of the Energy Reorganization Act of 1974, such as the nature and probable consequences of the event. The AO coordinator in the NRCs Office of Nuclear Regulatory Research coordinates with the program office and regional AO coordinators about incidents and events identified as potential AOs that generate interest from the Executive Director for Operations.

Validation: The agency is required to submit a Report to Congress on Abnormal Occurrences each FY for those events that, by Commission determination, meet the AO criteria. The staff has developed and revised these AO criteria over several decades, with extensive review by both the Commission and the public. In SECY-95-083, Revised Abnormal Occurrence Criteria, dated FY 2020 Congressional Budget Justification l 101

ANNUAL PERFORMANCE PLAN April 5, 1995, the staff describes the basis of the AO criteria as follows:

The AO reporting policy has been developed to comply with the legislative intent of Section 208 of the Energy Reorganization Act of 1974, as amended, to keep Congress and the public informed of unscheduled incidents or events which the Commission considers significant from the standpoint of public health and safety. The thresholds are generally above the normal level of reporting events by licensees to NRC to exclude those events which involve some variance from regulatory limits, but are not significant enough from the standpoint of public health and safety to be reported to Congress.

For each event that meets the AO criteria, the NRC includes in the report a description of the incident or event, as well as any action taken to prevent recurrence. Such actions include those taken by licensees, as well as more programmatic actions deemed necessary by the Commission to prevent recurrence across a class or classes of licensees. Establishing performance indicators at the threshold levels described by the AO criteria is appropriate and consistent with the principle that the NRCs regulatory processes (e.g., licensing, oversight, enforcement) are adequate to address a wide scope of infractions against regulatory requirements and do not generally warrant a focused reevaluation of the programs associated with those processes for every infraction. Therefore, only significant deviations from the regulatory requirements or unacceptable frequencies of occurrence of such deviations should be indicators of the need to reevaluate regulatory strategies and programs. This principle has been central to the staffs selection of performance goals and performance indicator thresholds for determining whether the NRCs performance in reasonably ensuring the safe and secure use of radioactive material has been adequate.

FY 2015-2020: Performance Goal 4: Number of malfunctions, deficiencies, events, or conditions at commercial nuclear power plants (operating or under construction) that meet or exceed AO Criteria II.A-II.E (commercial nuclear power plant licensees)

Reactor Safety Target: Zero Verification: The data for this performance indicator are collected in two ways as part of the NRCs ROP. NRC inspectors report inspection findings at a minimum on a quarterly basis. Inspectors use formal detailed inspection procedures to review plant operations and maintenance. NRC managers review inspection findings to assess their significance as part of the ROPs significance determination process. Licensees collect the data for performance indicators and submit them to the NRC quarterly.

The significance of the data is determined by thresholds for each indicator. The NRC conducts inspections of licensee processes FY 2020 Congressional Budget Justification l 102

ANNUAL PERFORMANCE PLAN for collecting and submitting the data to ensure completeness, accuracy, consistency, timeliness, and validity.

The NRC enhances the quality of its inspections through inspector feedback and periodic reviews of inspection results.

The NRC inspectors are trained through a rigorous qualification program. The quality of performance indicators is improved through continuous feedback from licensees and inspectors that is incorporated into guidance documents. The NRC publishes the inspection findings and performance indicators on the agencys Web site and incorporates feedback received from all stakeholders, as appropriate.

Validation: The inspection findings and performance indicators that the ROP uses cover a broad range of plant operations and maintenance.

NRC managers review significant issues that are identified, and inspectors conduct supplemental inspections of selected aspects of plant operations, as appropriate. On an annual basis, senior agency managers review a self-assessment of the ROP and plants that are identified as having performance issues, and the results are reported to the Commission.

Nuclear Materials and Waste Safety Safety Objective 1: Prevent, mitigate, and respond to accidents and ensure radiation safety.

Performance Indicators:

FY 2015-2020: Performance Goal 1: Number of radiation exposures that meet or exceed AO Criteria I.A.1 (unintended radiation exposure to an adult), I.A.2 (unintended radiation exposure to a minor), or I.A.3 (radiation exposure that has resulted in unintended permanent functional damage to an organ or physiological system)

Materials Safety Target Less than or equal to three (Fuel Facilities, Nuclear Materials Users, and Spent Fuel Storage and Transportation):

Waste Safety Target Zero (Decommissioning and Low-Level Waste):

Verification: This performance indicator includes any event involving licensed radioactive materials that results in significant radiation exposures to members of the public or occupational workers that exceed the dose limits in the AO reporting criteria. Because of the extremely high doses used during medical applications of radioactive materials, it is also appropriate to use a radiation exposure that results in unintended permanent functional damage to an organ or a physiological system to a radiation therapy patient, as determined by a physician, as a criterion for FY 2020 Congressional Budget Justification l 103

ANNUAL PERFORMANCE PLAN this indicator. AO Criterion I.A.3 is used as the basis for this indicator.

Should an event meeting this threshold occur, it would be reported to the NRC or Agreement States, or both, through a number of sources but primarily through required licensee notifications. These events are summarized in event notifications and preliminary notifications, which are used to widely disseminate the information to internal and external stakeholders.

The processes used in the Fuel Facilities, Nuclear Materials Users, Spent Fuel Storage and Transportation, and Decommissioning and LLW Business Lines contain elements to verify the completeness and accuracy of licensee reports.

IMPEP also provides a mechanism to verify that Agreement States and NRC regions are consistently collecting and reporting such events as received from the licensees and entering them into the Nuclear Material Events Database (NMED).

The NRC promotes timely and effective reviews of materials event data. Agency processes include an assessment of the NMED data during monthly staff reviews; emphasis and analysis during the IMPEP reviews; NMED training at NRC Headquarters, the regions, and Agreement States; and discussions at Agreement State and Conference of Radiation Control Program Directors meetings.

Validation: The NRC provides regulatory controls that limit or prevent radiation exposures to the public and occupational workers from radioactive material that exceed AO Criterion I.A. An incident or event is considered an AO if it involves a major reduction in the degree of protecting of public health or safety.

Events of this magnitude are rare. In the unlikely event that an AO should occur, the NRC or Agreement State technical specialists will confirm whether the criteria were met, with input from expert consultants as necessary.

The NRC does not statistically sample data to determine results.

Rather, the staff reviews all event data to determine whether the performance indicator has been met. There are two important data limitations in determining this performance indicator:

(1) delay time for receiving information and (2) failure to inform the NRC of an event that causes significant radiation exposures to the public or occupational workers. The NRC regulations associated with event reporting include specific requirements for timely notifications; a lag time separates the occurrence of an event and its known consequences.

The NRC believes the probability of not being aware of an event that causes significant radiation exposures to the public or FY 2020 Congressional Budget Justification l 104

ANNUAL PERFORMANCE PLAN occupational workers is very small. Periodic licensee inspections and regulatory reporting requirements are sufficient to ensure that an event of this magnitude would become known. If such an event occurred, it would result in a prompt and thorough investigation of the event, its consequences, its root causes, and the necessary actions by the licensee and the NRC to mitigate the situation and prevent recurrence. In addition to these immediate actions, the NRC holds periodic meetings during which staff and management validate the occurrence of these events.

FY 2015-2020: Performance Goal 2: Number of releases of radioactive materials that meet or exceed AO Criterion I.B (discharge or dispersal of radioactive material from its intended place of confinement)

Materials and Waste Zero Safety Target:

Verification: This performance indicator is defined as any release to the environment from the activities of the Fuel Facilities, Nuclear Materials Users, Spent Fuel Storage and Transportation, and Decommissioning and LLW Business Lines that exceed applicable regulations, as defined in 10 CFR 20.2203(a)(3). In accordance with Federal requirements, a 30-day written report is required on such releases.

Should an event meeting this threshold occur, it would be reported to the NRC or Agreement States, or both, through a number of sources but primarily through required licensee notifications. These events are summarized in event notifications and preliminary notifications, which are used to widely disseminate the information to internal and external stakeholders.

The fuel facilities, nuclear materials users, spent fuel storage and transportation, and decommissioning and LLW programs contain elements that verify the completeness and accuracy of licensee reports. IMPEP also provides a mechanism to verify that Agreement States and NRC regions are consistently collecting and reporting such events, as received from the licensees, and entering them into NMED.

The NRC promotes timely and effective reviews of materials event data. Agency processes include an assessment of the NMED data during monthly staff reviews; emphasis and analysis during the IMPEP reviews; NMED training at NRC Headquarters, the regions, and Agreement States; and discussions at Agreement State and Conference of Radiation Control Program Directors meetings.

Validation: The NRC provides regulatory controls to limit radiation releases to ensure protection of the environment. The regulations in FY 2020 Congressional Budget Justification l 105

ANNUAL PERFORMANCE PLAN 10 CFR Part 20 provide standards for protection against radiation. Releases subject to a 30-day reporting requirement in 10 CFR 20.2203(a)(3)(ii) serve as a performance indicator for ensuring the protection of the environment. The NRCs regulatory process, including licensing, inspection, guidance, regulations, and enforcement activities, is sufficient to ensure that releases of radioactive materials that exceed regulatory limits are infrequent.

In the unlikely event that a release to the environment exceeds regulatory limits, the NRC, Agreement State technical specialists, or agency consultants will confirm whether the criteria were met, with input from expert consultants as necessary.

The NRC does not statistically sample data to determine results; rather, the staff reviews all event data to determine whether the performance indicator has been met. There are two important data limitations in determining this performance indicator:

(1) delay time for receiving information and (2) the failure to inform the NRC of an event that causes environmental impacts.

The NRC regulations associated with event reporting include specific requirements for timely notifications. A lag time separates the occurrence of an event and its known consequences.

The NRC believes the probability of not being aware of an event that causes a radiological release to the environment that exceeds applicable regulations is very small. Periodic licensee inspections and regulatory reporting requirements are sufficient to ensure that an event of this magnitude would become known.

If such an event occurred, it would result in a prompt and thorough investigation of the event, its consequences, its root causes, and the necessary actions by the licensee and the NRC to mitigate the situation and prevent recurrence. In addition to these immediate actions, the NRC holds periodic meetings during which staff and management validate the occurrence of these events.

FY 2015-2020: Performance Goal 3: Number of instances of unintended nuclear chain reactions involving NRC-licensed radioactive materials Materials and Waste Zero Safety Target:

Verification: An accidental criticality is defined in 10 CFR 70.52(a). Each NRC office reviews event documents for its specific program area to identify events that meet or exceed AO Criterion III.A.1 (accidental criticality).

FY 2020 Congressional Budget Justification l 106

ANNUAL PERFORMANCE PLAN The program office or regional AO coordinators will assess an event to determine whether it meets the AO criteria. If an event meets the AO criteria, the program office or regional AO coordinator will develop a potential AO event description. The potential AO event description will include the applicable AO criteria and contain the information specified in Section 208 of the Energy Reorganization Act of 1974, such as the nature and probable consequences of the event.

The AO coordinator in the NRCs Office of Nuclear Regulatory Research coordinates with the program office and regional AO coordinators on incidents and events identified as potential AOs.

Validation: The agency is required to submit a Report to Congress on Abnormal Occurrences each FY for those events that, by Commission determination, meet the AO criteria. The staff has developed and revised these AO criteria over several decades with extensive review by both the Commission and the public. In SECY-95-083, the staff describes the basis of the AO criteria as follows:

The AO reporting policy has been developed to comply with the legislative intent of Section 208 of the Energy Reorganization Act of 1974, as amended, to keep Congress and the public informed of unscheduled incidents or events which the Commission considers significant from the standpoint of public health and safety. The thresholds are generally above the normal level of reporting events by licensees to NRC to exclude those events which involve some variance from regulatory limits, but are not significant enough from the standpoint of public health and safety to be reported to Congress.

For each event that meets the AO criteria, the NRC includes in the report a description of the incident or event, as well as any action taken to prevent recurrence. Such actions include those taken by licensees, as well as more programmatic actions deemed necessary by the Commission to prevent recurrence across a class or classes of licensees. Establishing performance indicators at the threshold levels described by the AO criteria is appropriate and consistent with the principle that the NRCs regulatory processes (e.g., licensing, oversight, enforcement) are adequate to address a wide scope of infractions against regulatory requirements and do not generally warrant a focused reevaluation of the programs associated with those processes for every infraction. Therefore, only significant deviations from the regulatory requirements or unacceptable frequencies of occurrence of such deviations should be indicators of the need to reevaluate regulatory strategies and programs. This principle has been central to the staffs selection of performance goals and performance indicator thresholds for determining whether the NRCs performance in ensuring the safe and secure use of radioactive material has been adequate.

FY 2020 Congressional Budget Justification l 107

ANNUAL PERFORMANCE PLAN FY 2015-2020: Performance Goal 5: Number of malfunctions, deficiencies, events, or conditions at nonreactor facilities or during transportation of nuclear materials that meet or exceed AO Criteria III.A (events at facilities other than nuclear power plants) or III.B (all transportation events)

Materials and Waste Zero Safety Target:

Verification: Each NRC office reviews event documents for its specific program area to identify events as potential AOs.

The program office or regional AO coordinators will assess an event to determine whether it meets the AO criteria. If an event meets the AO criteria, the program office or regional AO coordinator will develop a potential AO event description. The potential AO event description will include the applicable AO criteria and contain the information specified in Section 208 of the Energy Reorganization Act of 1974, such as the nature and probable consequences of the event.

The AO coordinator of the NRCs Office of Nuclear Regulatory Research coordinates with the program office and regional AO coordinators on incidents and events identified as potential AOs.

Validation: The agency is required to submit a Report to Congress on Abnormal Occurrences each FY for those events that the Commission has determined to meet the AO criteria. The staff has developed and revised these AO criteria over several decades with extensive review by both the Commission and the public. In SECY-95-083, the staff describes the basis of the AO criteria as follows:

The AO reporting policy has been developed to comply with the legislative intent of Section 208 of the Energy Reorganization Act of 1974, as amended, to keep Congress and the public informed of unscheduled incidents or events which the Commission considers significant from the standpoint of public health and safety. The thresholds are generally above the normal level of reporting events by licensees to NRC to exclude those events which involve some variance from regulatory limits, but are not significant enough from the standpoint of public health and safety to be reported to Congress.

For each event that meets the AO criteria, the NRC includes in the report a description of the incident or event, as well as any action taken to prevent recurrence. Such actions include those taken by licensees, as well as more programmatic actions deemed necessary by the Commission to prevent recurrence across a class or classes of licensees. Establishing performance indicators at the threshold levels described by the AO criteria is appropriate and consistent with the principle that the NRCs FY 2020 Congressional Budget Justification l 108

ANNUAL PERFORMANCE PLAN regulatory processes (e.g., licensing, oversight, enforcement) are adequate to address a wide scope of infractions against regulatory requirements and do not generally warrant a focused reevaluation of the programs associated with those processes for every infraction. Therefore, only significant deviations from the regulatory requirements or unacceptable frequencies of occurrence of such deviations should be indicators of the need to reevaluate regulatory strategies and programs. This principle has been central to the staffs selection of performance goals and performance indicator thresholds for determining whether the NRCs performance in ensuring the safe and secure use of radioactive material has been adequate.

Goal 2: Security: Ensure the secure use of radioactive materials.

Nuclear Reactor and Nuclear Materials and Waste Security Security Objective 1: Ensure protection of nuclear facilities and radioactive materials.

Performance Indicators:

FY 2015-2020: Performance Goal 1: Number of instances of sabotage, theft, diversion, or loss of risk-significant quantities of radioactive material that meet or exceed AO Criteria I.C.1 (stolen, diverted, abandoned, or unrecovered lost), I.C.2 (radiological sabotage),

or I.C.3 (substantiated case of actual theft, diversion, or loss of a formula quantity of SNM or an inventory discrepancy).

Security Target: Zero Verification: Under AO Criterion I.C.1, the agency counts any stolen, diverted, abandoned, or unrecovered lost radioactive material that meets or exceeds the thresholds listed in Appendix A, Category 1 and Category 2 Radioactive Materials, to 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material. Excluded from reporting under this criterion are those events involving sources that are lost or abandoned under the following conditions: sources that have been lost and for which a reasonable attempt at recovery has been made without success, or irretrievable well logging sources as defined in 10 CFR 39.2, Definitions. These sources are only excluded if there is reasonable assurance that the doses from these sources have not exceeded, and will not exceed, the reporting thresholds specified in AO Criteria I.A.1 and I.A.2 and the agency has determined that the risk of theft or diversion is acceptably low.

Losses or thefts of radioactive material greater than or equal to 1,000 times the quantity specified in Appendix C, Quantities of Licensed Material Requiring Labeling, to 10 CFR Part 20 must be reported (in accordance with 10 CFR 20.2201(a)) by telephone to the NRC Headquarters Operations Center or FY 2020 Congressional Budget Justification l 109

ANNUAL PERFORMANCE PLAN Agreement State immediately (interpreted as within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) if the licensee believes that an exposure could result to persons in unrestricted areas. If an event meeting the thresholds described above occurs, it would be reported through a number of sources but primarily through this required licensee notification. The staff then enters publicly available information about events in NMED, which is used to collect, store, and track information on such events. Alternate methods are used to track events that are not publicly available. Additionally, licensees must meet the reporting and accounting requirements in 10 CFR Part 73, Physical Protection of Plants and Materials, and 10 CFR Part 74, Material Control and Accounting of Special Nuclear Material.

The NRCs inspection programs are key elements in verifying the completeness and accuracy of licensee reports. IMPEP also provides a mechanism to verify that Agreement States and the NRC regions are consistently collecting and reporting such events as received from the licensees and are entering these events in NMED. In some cases, upon receiving a report, the NRC or Agreement State initiates an independent inspection that verifies the reliability of the reported information. When performed, these inspections enable the NRC or Agreement State to verify the accuracy of the reported data.

The regulation at 10 CFR 20.2201(b) requires a 30-day written report for lost or stolen sources that are greater than or equal to 10 times the quantity specified in Appendix C to 10 CFR Part 20 if the source is still missing at that time. Furthermore, 10 CFR 20.2201(d) requires an additional written report within 30 days of a licensee learning any additional substantive information. The NRC interprets this requirement as including reporting the recovery of sources.

The NRC issued guidance in RIS 2005-21, Clarification of the Reporting Requirements in 10 CFR 20.2201, dated November 14, 2005, to clarify the current requirement in 10 CFR 20.2201(d) for reporting recovery of a risk-significant source. The NRC asked the Agreement States to send copies of RIS 2005-21 (or an equivalent document) to Agreement State licensees. The NRC issued the NSTS final rule in November 2006. On January 31, 2009, NRC licensees and Agreement State licensees were required to begin reporting information on source transactions to the NSTS. Implementation of this system creates an inventory of risk-significant sources.

This rulemaking established reporting requirements for risk-significant sources (including reporting timeframes) by adding specific requirements to 10 CFR 20.2201, Reports of Theft or Loss of Licensed Material, for risk-significant sources, including a requirement for licensees to report within 30 days the recovery of a risk-significant source.

FY 2020 Congressional Budget Justification l 110

ANNUAL PERFORMANCE PLAN Validation: Events collected under this performance indicator are actual losses, thefts, or diversions of materials described above. Such events could compromise public health and safety, the environment, and the common defense and security. Events of this magnitude are rare. The information reported under 10 CFR Part 73 and 10 CFR Part 74 is required so that the NRC is aware of events that could endanger public health and safety or national security. Any failures at the level of the strategic plan would result in immediate investigation and follow-up.

If an event subject to the reporting requirements described above occurs, it would result in a prompt and thorough evaluation of the event, its consequences, its root causes, and the necessary actions by the licensee, the NRC, or an Agreement State to mitigate the situation and prevent recurrence.

Verification: In AO Criterion I.C.2, radiological sabotage is as defined in 10 CFR 73.2, Definitions. In AO Criterion I.C.3, substantiated means a situation in which there is an indication of loss, theft, or unlawful diversion, such as an allegation of diversion, report of lost or stolen material, or other indication of loss of material control or accountability that cannot be refuted following an investigation and requires further action on the part of the agency or other proper authorities. A formula quantity of SNM is defined in 10 CFR 70.4, Definitions. Licensees subject to the requirements in 10 CFR Part 73 must call the NRC within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an occurrence to report any breaches of security or other event that may potentially lead to theft or diversion of material or to sabotage at a nuclear facility. The NRC describes its safeguards requirements in 10 CFR 73.71, Reporting of Safeguards Events; Appendix G, Reportable Safeguards Events, to 10 CFR Part 73; and 10 CFR 74.11, Reports of Loss or Theft or Attempted Theft or Unauthorized Production of Special Nuclear Material.

The information assessment team composed of NRC Headquarters and regional staff members would conduct an immediate assessment for any significant events to determine any further actions needed, including coordination with the intelligence community and law enforcement. In accordance with 10 CFR 73.71(d), the licensee must also file a written report within 60 days of the incident that describes the event and the steps that the licensee took to protect the nuclear facility. This information will enable the NRC to assess whether radiological sabotage has occurred.

Validation: Events subject to reporting requirements are those that endanger public health and safety and the environment through deliberate acts of theft or diversion of material or through sabotage directed against the nuclear facilities that the agency licenses. Events of this type are extremely rare. If such an event occurs, it would FY 2020 Congressional Budget Justification l 111

ANNUAL PERFORMANCE PLAN result in a prompt and thorough investigation of the event, its consequences, its root causes, and the necessary actions by the licensee or the NRC to mitigate the situation and prevent recurrence. The investigation ensures the validity of the information and assesses the significance of the event.

Verification: Licensees must record events associated with AO Criterion I.C.3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the identified event in a safeguards log that the licensee maintains. The licensee must retain the log as a record for 3 years after the last entry is made or until termination of the license. The NRC relies on its safeguards inspection program to ensure the reliability of recorded data. The NRC makes a determination of whether a substantiated breakdown has resulted in a vulnerability to radiological sabotage, theft, diversion, or unauthorized enrichment of SNM. When making substantiated breakdown determinations, the NRC evaluates the materials event data to ensure that licensees are reporting and collecting the proper event data.

Validation: Substantiated means a situation that requires additional action by the agency or other proper authorities because of an indication of loss, theft, or unlawful diversionsuch as an allegation of diversion, report of lost or stolen material, statistical processing difference, other system breakdown closely related to the material control and accounting program (such as an item control system associated with the licensees facility information technology system), or other indication of a loss of material control or accountabilitythat cannot be refuted following an investigation. A formula quantity of SNM is defined in 10 CFR 70.4.

Events collected under this performance indicator may indicate a vulnerability to radiological sabotage, theft, diversion, or loss of SNM. Such events could compromise public health and safety, the environment, and the common defense and security. The NRC relies on its safeguards inspection program to help validate the reliability of recorded data and to determine whether a breakdown of a physical protection or material control and accounting system has actually resulted in a vulnerability.

FY 2015-2020: Performance Goal 2: Number of substantial breakdowns of physical security, cybersecurity, or material control and accountability that meet or exceed AO Criteria I.C.4 (substantial breakdown in physical security, cybersecurity, or material control and accountability) or I.C.3 (substantiated case of actual theft, diversion, or loss of a formula quantity of SNM or an inventory discrepancy)

Security Target: Less than or equal to one Verification: AO Criterion I.C.4 defines a substantial breakdown as a red finding under the ROP in the physical security inspection FY 2020 Congressional Budget Justification l 112

ANNUAL PERFORMANCE PLAN program or any plant or facility determined to have overall unacceptable performance resulting in a determination of overall unacceptable performance or in a shutdown condition (inimical to the effective functioning of the Nations critical infrastructure).

Radiological sabotage is defined in 10 CFR 73.2. Licensees are required to report to the NRC, immediately after the occurrence becomes known, any known breakdowns of physical security, based on the requirements in 10 CFR 73.71 and Appendix G to 10 CFR Part 73. If a licensee reports such an event, the headquarters operations officer prepares an official record of the initial event report. The NRC begins responding to such an event immediately upon notification with the activation of its information assessment team. A licensee must follow its initial telephone notification with a written report submitted to the NRC within 30 days.

The licensee records breakdowns of physical protection resulting in a vulnerability to radiological sabotage, theft, diversion, or loss of SNM or radioactive waste within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a safeguards log that the licensee maintains. The licensee must retain the log as a record for 3 years after the last entry is made or until termination of the license. Licensees subject to 10 CFR Part 73 must also meet the reporting requirements detailed in 10 CFR 73.71. The NRC evaluates all of the reported events, based on the criteria in 10 CFR 73.71 and Appendix G to 10 CFR Part 73. The NRC also maintains and relies on its safeguards inspection program to ensure the reliability of recorded and reported data.

Validation: Events assessed under this performance indicator are those that threaten nuclear activities by deliberate acts, such as radiological sabotage, directed against facilities. If a licensee reports such an event, the information assessment team evaluates and validates the initial report and determines any further actions that may be necessary. Tracking breakdowns of physical security indicates whether the licensee is taking the necessary security precautions to protect the public, given the potential consequences of a nuclear accident attributable to sabotage or the inappropriate use of nuclear material either in this country or abroad.

Events collected under this performance indicator may indicate a vulnerability to radiological sabotage, theft, diversion, or loss of SNM or radioactive waste. Such events could compromise public health and safety, the environment, and the common defense and security. The NRC relies on its safeguards inspection program to help validate the reliability of recorded data and to determine whether a breakdown of a physical protection or material control and accounting system has actually resulted in a vulnerability.

Security Objective 2: Ensure protection of classified and Controlled Unclassified Information FY 2020 Congressional Budget Justification l 113

ANNUAL PERFORMANCE PLAN Performance Indicators:

FY 2015-2020: Performance Goal 3: Number of significant unauthorized disclosures of classified or Safeguards Information by licensees, as defined by AO Criterion I.C.5 (significant unauthorized disclosures of classified information or Safeguards Information),

and by NRC employees or contactors, as defined by NRC internal criteria Security Target: Zero Verification: In regard to AO Criterion I.C.5, any alleged or suspected violations by NRC licensees of the AEA, Espionage Act, or other Federal statutes related to classified or Safeguards Information must be reported to the NRC under the requirements in 10 CFR 95.57(a) (for classified information), 10 CFR Part 73 (for Safeguards Information), and NRC orders (for Safeguards Information subject to modified handling requirements).

However, for performance reporting, the NRC would only count those disclosures or compromises that actually cause damage to national security or that threaten public health and safety.

Such events would be reported to the cognizant security agency (i.e., the security agency with jurisdiction) and the Regional Administrator of the appropriate NRC regional office, as listed in Appendix A, U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses, to 10 CFR Part 73. The Regional Administrator would then contact the Division of Security Operations at NRC Headquarters, which would assess the violation and notify other NRC offices and Government agencies, as appropriate. A determination would be made as to whether the compromise damaged national security or public health and safety. Any unauthorized disclosures or compromises of classified or Safeguards Information that damaged national security or public health and safety would result in immediate investigation and follow-up by the NRC. In addition, NRC inspections verify that licensees routine handling of classified information and Safeguards Information (including Safeguards Information subject to modified handling requirements) conforms to established security information management requirements.

Any alleged or suspected violations of this performance indicator by NRC employees, contractors, or other personnel would be reported, in accordance with NRC procedures, to the Director of the Division of Facilities and Security at NRC Headquarters. The NRC maintains a strong system of controls over national security and Safeguards Information, including (1) annual required training for all employees, (2) safe and secure document storage, and (3) physical access control in the form of guards and badged access.

FY 2020 Congressional Budget Justification l 114

ANNUAL PERFORMANCE PLAN Validation: Events collected under this performance indicator are unauthorized disclosures of classified information or Safeguards Information that damage the national security or public health and safety. Events of this magnitude are not expected and would be rare. If such an event occurs, it would result in a prompt and thorough investigation, including consequences, root causes, and necessary actions by the licensees and the NRC to mitigate the consequences and prevent recurrence. NRC investigation teams also validate the materials event data to ensure that licensees are reporting and collecting the proper event data.

MANAGEMENT PRIORITIES As stated in the NRCs FY 2018-2022 Strategic Plan, the agencys vision is to Demonstrate the Principles of Good Regulation (independence, openness, efficiency, clarity, and reliability) in performing our mission. The agency puts these principles into practice with effective, realistic, and timely regulatory actions to meet its safety and security goals and objectives. In addition, the NRC is committed to ensuring the stewardship of agency resources in implementing mission support functions, such as financial management, human resources management, acquisition planning and execution, IT/IM, and administrative support services. The NRC encourages all employees to identify ways of increasing effectiveness, efficiency, and innovation in conducting their work. Based on these efforts, the NRC has not identified any programs or management functions that have greater vulnerability to waste, fraud, abuse, and mismanagement, as defined by GPRA Modernization Act of 2010, to be major management challenges.

In June 2014, the NRC launched an initiative called Project Aim to enhance the agencys ability to plan and execute its mission while adapting in a timely and effective manner to a dynamic environment. The agencys FY 2018-2022 Strategic Plan sustains the momentum by setting forth a number of specific strategies that emphasize continuous improvement of its processes and activities. The NRC has a number of ongoing efforts to make more effective and efficient use of resources. Some notable examples include the following:

Take actions to better integrate risk-informed approaches into NRC regulatory processes to improve safety decisionmaking and regulatory efficiency.

Use a Common Prioritizing of Rulemaking process to manage rulemaking activities from across the agency in a consistent manner, with consideration of their contribution to the NRCs strategic plan safety and strategic goals and supporting governmental and public priorities.

Perform a retrospective review of NRC regulations to identify administrative regulations that are outdated or duplicative that can be eliminated.

Establish a more consistent approach to identify and disposition existing or planned work to accommodate emerging needs and resource changes.

Launch the InnovateNRC effort to enable the agency to be a more innovative regulator.

FY 2020 Congressional Budget Justification l 115

ANNUAL PERFORMANCE PLAN Implement process efficiencies to reduce costs and improve the delivery of services, including a greater use of shared services.

Develop an enhanced strategic workforce planning process to facilitate the agencys ability to anticipate and address future workforce needs.

STRATEGIC PLAN STRATEGIES AND SUPPORTING BUSINESS LINES The NRC FY 2018-2022 Strategic Plan identifies the strategies needed for the NRC to achieve its strategic goals and objectives. The following table shows which agency business lines support each strategy.

Strategy Business Line Safety Strategy 1: Maintain and Decommissioning and LLW, Fuel Facilities, New enhance the NRCs regulatory programs, Reactors, Nuclear Materials Users, Operating using information gained from domestic Reactors, Spent Fuel Storage and and international operating experience, Transportation lessons learned, and advances in science and technology.

Safety Strategy 2: Further risk-inform Decommissioning and LLW, Fuel Facilities, New the current regulatory framework in Reactors, Nuclear Materials Users, Operating response to advances in science and Reactors, Spent Fuel Storage and technology, policy decisions, and other Transportation factors, including prioritizing efforts to focus on the most safety-significant issues.

Safety Strategy 3: Enhance the Decommissioning and LLW, Fuel Facilities, New effectiveness and efficiency of licensing Reactors, Nuclear Materials Users, Operating and certification activities to maintain both Reactors, Spent Fuel Storage and quality and timeliness of licensing and Transportation certification reviews.

Safety Strategy 4: Maintain effective Decommissioning and LLW, Fuel Facilities, New and consistent oversight of licensee Reactors, Nuclear Materials Users, Operating performance with a focus on the most Reactors, Spent Fuel Storage and safety-significant issues. Transportation Safety Strategy 5: Maintain material Nuclear Materials Users, Decommissioning and safety through the National Materials LLW Program in partnership with Agreement States.

Safety Strategy 6: Identify, assess, and Decommissioning and LLW, Fuel Facilities, New resolve safety issues. Reactors, Nuclear Materials Users, Operating Reactors, Spent Fuel Storage and Transportation Safety Strategy 7: Ensure the NRC Corporate Support, Decommissioning and LLW, maintains its readiness to respond to Fuel Facilities, New Reactors, Nuclear Materials incidents and emergencies involving Users, Operating Reactors, Spent Fuel Storage NRC-licensed facilities and radioactive and Transportation materials and other events of domestic and international interest.

FY 2020 Congressional Budget Justification l 116

ANNUAL PERFORMANCE PLAN Strategy Business Line Safety Strategy 8: Verify that nuclear Fuel Facilities, New Reactors, Operating facilities are constructed and operated in Reactors, Spent Fuel Storage and accordance with permits and licenses and Transportation that the environmental and safety regulatory infrastructure is adequate to support the issuance of new licenses.

Security Strategy 1: Maintain and Decommissioning and LLW, Fuel Facilities, New further risk-inform the current regulatory Reactors, Nuclear Materials Users, Operating framework for security using information Reactors, Spent Fuel Storage and gained from operating experience, Transportation lessons learned, external and internal assessments, technology advances, and changes in the threat environment.

Security Strategy 2: Maintain effective, Decommissioning and LLW, Fuel Facilities, New consistent, and risk-informed oversight of Reactors, Nuclear Materials Users, Operating licensee performance with respect to Reactors, Spent Fuel Storage and meeting NRC security requirements. Transportation Security Strategy 3: Maintain material Nuclear Materials Users security through the National Materials Program in partnership with the safety programs administered by the Agreement States.

Security Strategy 4: Proactively identify, Decommissioning and LLW, Fuel Facilities, New assess, and address threats, Reactors, Nuclear Materials Users, Operating vulnerabilities, and security risks. Reactors, Spent Fuel Storage and Transportation Security Strategy 5: Support Corporate Support, Fuel Facilities, New U.S. national security interests and Reactors, Nuclear Materials Users, Operating nuclear nonproliferation policy objectives Reactors, Spent Fuel Storage and consistent with the NRCs statutory Transportation mandate through cooperation with domestic and international partners.

Security Strategy 6: Ensure material Fuel Facilities, Operating Reactors, Spent Fuel control and accounting for special nuclear Storage and Transportation materials.

Security Strategy 7: Ensure that Corporate Support, Decommissioning and LLW, programs for the handling and control of Fuel Facilities, New Reactors, Nuclear Materials classified and Controlled Unclassified Users, Operating Reactors, Spent Fuel Storage Information are effectively implemented at and Transportation the NRC and at licensed facilities.

FY 2020 Congressional Budget Justification l 117

OFFICE OF THE INSPECTOR GENERAL OFFICE OF THE INSPECTOR GENERAL The NRCs Office of the Inspector General (OIG) was established as a statutory entity on April 15, 1989, in accordance with the 1988 amendments to the Inspector General Act. The OIG mission is to independently and objectively audit and investigate programs and operations to promote effectiveness and efficiency, and to prevent and detect fraud, waste, and abuse.

Starting in fiscal year (FY) 2014, the NRCs OIG has exercised the same authorities with respect to the Defense Nuclear Facilities Safety Board (DNFSB) per the Consolidated Appropriations Act, 2014.

NRC OIG Budget Authority and Full-Time Equivalents (Dollars in Millions)

FY 2019 FY 2020 Changes from Enacted Request FY 2019

$M FTE $M FTE $M FTE Program Support 1.647 0.0 1.974 0.0 0.327 0.0 Program Salaries and Benefits 10.962 63.0 11.340 63.0 0.378 0.0 Total $12.609 63.0 $13.314 63.0 $0.705 0.0 Numbers may not add due to rounding.

The FY 2020 budget request for the NRC OIG is $13.314 million, which includes $11.340 million in salaries and benefits to support 63 full-time equivalent (FTE), and $1.974 million in program support. These resources will support Inspector General auditing and investigation functions for both the NRC, $12.143 million, and the DNFSB, $1.171 million, respectively.

OIG is showing the full cost associated with its programs for the FY 2020 budget with the following caveat: as a result of an October 1989 memorandum of understanding between the NRCs Chief Financial Officer and the Inspector General and a subsequent amendment in March 1991, OIG no longer requests that funding for some OIG management and support services be included in the OIG appropriation. It was agreed that funds for OIG infrastructure requirements and other agency support services would instead be included in the NRCs main appropriation. For the most part, these costs are not readily severable. Thus, this funding continues to be included in NRCs main appropriation.

AUDITS PROGRAM Audits Budget Authority (Dollars in Millions)

FY 2019 FY 2020 Changes from Enacted Request FY 2019

$M FTE $M FTE $M FTE Program Support 8.495 41.0 8.903 41.0 0.408 0.0 Total $8.495 41.0 $8.903 41.0 $0.408 0.0 Numbers may not add due to rounding.

The OIG Audits Program focuses on the agencys management and financial operations; economy and efficiency with which an organization, program, or function is managed; and whether the programs achieve intended results. OIG auditors assess the degree to which an organization complies with laws, regulations, and internal policies in carrying out programs, and FY 2020 Congressional Budget Justification l 119

OFFICE OF THE INSPECTOR GENERAL they test program effectiveness as well as the accuracy and reliability of financial statements.

The overall objective of an audit is to identify ways to enhance agency operations and promote greater economy and efficiency.

For FY 2020, OIG requests $8.903 million and 41 FTE to carry out its Audits Program activities for NRC and DNFSB programs. With these resources, the Audits Program will conduct approximately 24 audits and evaluations for the NRC. This will enable OIG to provide coverage of the NRCs Nuclear Reactor Safety, Nuclear Materials and Waste Safety, Security, and Corporate Support programs. OIGs assessment of these mission-critical programs will support the agency in accomplishing its goals to ensure adequate protection of public health and safety and the environment, and in the secure use and management of radioactive materials.

In addition, OIG will conduct approximately six audits and evaluations that will cover various DNFSB programs and operations. These assessments will support the DNFSBs primary purpose of ensuring adequate protection of public health and safety in the U.S. Department of Energys defense nuclear facilities and operations.

CHANGES FROM FY 2019 ENACTED BUDGET OIGs FY 2020 budget request reflects the funding level needed to sustain the authorized staffing level, conduct legislatively mandated audits at NRC and DNFSB, and fund essential contract support and travel activities related to audit work at both agencies.

FY 2019-FY 2020 AUDITS PROGRAM PERFORMANCE MEASURES Ensure that 85 percent of OIG audit products and activities cause the NRC and DNFSB to take corrective action to improve agency safety, security, and corporate management programs; ratify adherence to agency policies, procedures, or requirements; or identify real dollar savings or reduced regulatory burden (i.e., high impact).

Obtain NRC and DNFSB agreement on at least 92 percent of OIG audit recommendations.

Obtain final action on 70 percent of NRC and 50 percent of DNFSB OIG audit recommendations within 2 years.

SELECTED FY 2018 AUDITS PROGRAM ACCOMPLISHMENTS In FY 2018, OIG issued 28 reports, with 22 pertaining to NRC programs and operations and 6 pertaining to DNFSB programs and operations. These reports either evaluated high-risk agency programs or comply with mandatory audits pursuant to financial and computer security-related legislation. Additional information related to work performed may be found on the OIG Web Site at http://www.nrc.gov/insp-gen/pubs.html#Semi-Annual.

FY 2020 Congressional Budget Justification l 120

OFFICE OF THE INSPECTOR GENERAL INVESTIGATIONS PROGRAM Investigations Budget Authority (Dollars in Millions)

FY 2019 FY 2020 Changes from Enacted Request FY 2019

$M FTE $M FTE $M FTE Program Support 4.114 22.0 4.411 22.0 0.297 0.0 Total $4.114 22.0 $4.411 22.0 $0.297 0.0 Numbers may not add due to rounding.

The OIGs responsibility for detecting and preventing fraud, waste, and abuse within the NRC and DNFSB includes investigating possible violations of criminal statutes relating to NRC and DNFSB programs and activities, investigating misconduct by NRC and DNFSB employees, interfacing with the U.S. Department of Justice (DOJ) on OIG-related criminal matters, and coordinating investigations and other OIG initiatives with Federal, State, and local investigative agencies and other OIGs. Investigations may be initiated as a result of allegations or referrals from private citizens; licensee employees; NRC and DNFSB employees; Congress; other Federal, State, and local law enforcement agencies; OIG audits; the OIG hotline; and Inspector General initiatives directed at bearing a high potential for fraud, waste, and abuse.

For FY 2020, OIG requests $4.411 million and 22 FTE to carry out its Investigations Program activities for NRC and DNFSB programs. Reactive investigations into allegations of criminal and other wrongdoing will continue to be OIGs priority. The Investigations Programs main concentration of effort will involve investigations of alleged NRC or DNFSB staff misconduct that could adversely impact matters related to the health and safety mission of the NRC and the DNFSB. OIG has also implemented a series of proactive initiatives designed to identify specific high-risk areas that are most vulnerable to fraud, waste, and abuse. With these resources, OIG expects to conduct approximately 40 investigations at the NRC and at DNFSB covering a broad range of allegations concerning misconduct and mismanagement affecting various NRC and DNFSB programs.

CHANGES FROM FY 2019 ENACTED BUDGET OIGs FY 2020 budget request reflects the funding level needed to sustain the authorized staffing level.

FY 2019-FY 2020 INVESTIGATIONS PROGRAM PERFORMANCE MEASURES Ensure 85 percent of OIG investigative products and activities identify opportunities for improvements to NRC and DNFSB safety, security, and corporate management programs; ratify adherence to policies/procedures; or confirm or disprove allegations of wrongdoing (e.g., high impact).

Obtain 90 percent agency actions taken in response to NRC and DNFSB investigative reports.

Complete 90 percent of NRC cases and 85 percent of DNFSB cases within 18 months.

FY 2020 Congressional Budget Justification l 121

OFFICE OF THE INSPECTOR GENERAL Refer at least 20 percent of closed NRC investigations to DOJ or other relevant authorities.

Ensure that at least 60 percent of closed NRC investigations result in indictments, convictions, civil suits or settlements, judgments, administrative actions, monetary results, or IG clearance letters.

SELECTED FY 2018 AUDITS PROGRAM ACCOMPLISHMENTS In FY 2018, OIG completed 40 investigations. These investigative efforts focused on violations of law or misconduct by NRC/DNFSB employees and contractors and allegations of irregularities or inadequacies in NRC/DNFSB programs and operations. Additional information related to work performed may be found on the OIG Web Site at http://www.nrc.gov/insp-gen/pubs.html#Semi-Annual.

NRC OIGS STRATEGIC GOALS, STRATEGIES, AND ACTIONS The NRC OIG carries out its mission through its Audits and Investigations Programs. The NRC OIG Strategic Plan for FY 2019-2023 features three strategic goals and guides the activities of these programs. This OIG Strategic Plan identifies the major challenges and risk areas facing the NRC and generally aligns with the agencys mission. It also includes a number of supporting strategies and actions that describe OIGs planned accomplishments over the strategic planning period. The NRC OIG strategic plan can be found in its entirety at the following address: http://www.nrc.gov/insp-gen/plandocs/strategic-plan.pdf.

To ensure that each NRC OIG audit and evaluation aligns with these three goals, program areas selected for audit and evaluation are included in the OIG Annual Plan after being cross walked against the NRC OIG Strategic Plan to ensure alignment with the offices strategic goals.

Furthermore, each OIG audit, evaluation, and investigation is informed by one or more of the most serious management and performance challenges facing the agency as identified by the Inspector General. The work performed by OIG auditors and investigators is mutually supportive and complementary in pursuit of these objectives. Below are the NRC OIGs current strategic goals and strategies.

NRC OIG STRATEGIC GOALS (1) Safety: Strengthen NRCs efforts to protect public health and safety and the environment.

NRC performs critical functions to ensure the safe and secure use of radioactive materials in the United States and to protect both the public and radiation workers from radiation hazards that could result from the use of radioactive materials. NRC provides licensing and oversight activities for 99 commercial nuclear power reactors; research, test, and training reactors; radioactive materials used in medicine, academia, and industry; and nuclear waste.

NRC is responsible for maintaining an established regulatory framework for the safe and secure use of civilian nuclear reactors, including commercial nuclear power plants as well as research, test, and training reactors. NRCs regulatory oversight responsibilities in the reactor arena include developing policy and rulemaking, licensing and inspecting reactors, licensing reactor FY 2020 Congressional Budget Justification l 122

OFFICE OF THE INSPECTOR GENERAL operators, and enforcing regulations. The agency is also facing the increased number of plants that are closing down and undergoing decommissioning.

NRC is also responsible for regulatory oversight of the safe and secure use of nuclear materials; medical, industrial, and academic applications, uranium recovery activities; and for the storage and disposal of high-level and low-level radioactive waste. NRC is authorized to grant licenses for the possession and use of radioactive materials and establish regulations to govern the possession and use of those materials.

Upon a States request, NRC may enter into an agreement to relinquish its authority to the State to regulate certain radioactive materials and limited quantities of special nuclear material. The State must demonstrate that its regulatory program is adequate to protect public health and safety and compatible with NRCs program. The States that enter into an agreement assuming this regulatory authority from NRC are called Agreement States. The number of Agreement States continues to increase.

NRC regulates spent (used) reactor fuel from commercial and research and test reactors.

Because of its highly radioactive nature, spent fuel must be handled and stored with care and in a manner, which provides for adequate protection of the public. NRC has been reviewing the issues associated with storing spent fuel at existing reactor sites or at interim storage facilities.

NRC must address its safety challenges to fulfill its mission of protecting public health and safety and the environment. NRC must be prepared to address emerging technical and regulatory issues in a timely manner as well as be able to capture and transfer knowledge learned through experience. In an ever evolving and resource-constrained climate, it is of paramount importance that the agency implements its programs as effectively and efficiently as possible. Below are the NRC OIGs strategies to support the NRC in facing these and other safety-related challenges.

Strategy 1-1: Identify risk areas associated with NRC's oversight of nuclear facilities, and conduct audits and/or investigations that lead to NRC program and operational improvements.

Strategy 1-2: Identify risk areas facing NRC's oversight of nuclear materials, and conduct audits and/or investigations that lead to NRC program and operational improvements.

Strategy 1-3: Identify risk areas associated with NRC's oversight of high-level and low level waste, and conduct audits and/or investigations that lead to NRC program and operational improvements.

(2) Security: Strengthen NRCs security efforts in response to an evolving threat environment.

Discussion: NRC must ensure that nuclear power and materials licensees take adequate measures to protect their facilities against radiological sabotage. NRC faces the challenge of adapting to dynamic threats while also maintaining a stable security oversight regime commensurate with the agency's mission as a fair and impartial regulator. NRC has well-established inspection programs for evaluating the physical, cyber, and personnel security activities of nuclear power and materials licensees.

NRC must respond to a cyber threat environment where adversaries' tactics and capabilities rapidly evolve. Cyber security also entails oversight challenges related to the mix of digital and FY 2020 Congressional Budget Justification l 123

OFFICE OF THE INSPECTOR GENERAL analog systems at NRC licensees. For example, digital equipment upgrades could impact licensee operations and security.

NRC plays a critical role in overseeing and supporting the emergency preparedness and incident response capabilities of its licensees. This oversight includes the integration of licensee plans with government agencies in light of natural disasters and terrorist threats.

NRC also supports U.S. international interests in both the safe and secure use of nuclear material and technology and nuclear non-proliferation. This includes controls on the import and export of nuclear materials and equipment, and exercising its international oversight commitments.

Strategy 2-1: Identify risks involved in securing nuclear reactors, fuel cycle facilities, and materials, and conduct audits and/or investigations that lead to NRC program and operational improvements.

Strategy 2-2: Identify risks in emergency preparedness and incident response, and conduct audits and/or investigations that lead to NRC program and operational improvements.

Strategy 2-3: Identify risks in international security activities, and conduct audits and/or investigations that lead to program and operational improvements.

(3) Corporate Management: Increase the economy, efficiency, and effectiveness with which NRC manages and exercises stewardship over its resources.

Discussion: NRC faces significant challenges to efficiently, effectively and economically manage its corporate resources. NRC must continue to provide infrastructure and support to accomplish its regulatory mission while responding to continuous scrutiny of budgetary levels, evolving regulatory requirements, changing industry and market conditions, and the continuously developing security threat environment.

Addressing corporate resource challenges concerning organizational staffing, human capital, information management and internal financial oversight will require a continuing, well considered process of adaptation throughout the next strategic planning period. NRC must continue its efforts to maintain its capability to effectively use its financial resources and to manage other factors. Such factors include reductions in long-tenured staffing, which require knowledge preservation and transfer, the effective deployment of resources to meet changing regulatory requirements, efficient adaptation to changing industry conditions, and the need for continued improvement in information technology capabilities.

Further, NRC must protect its infrastructure and take the necessary steps to ensure that its staff, facilities, information, and information technology assets are adequately protected against insider and external threats while maintaining operations. NRC faces the challenge of balancing transparency with information security.

OIG will continue to target corporate management risk areas for audits and investigations, to fulfill its statutory responsibilities to evaluate agency financial management, and work with NRC to identify and improve areas of weakness.

Strategy: 3-1: Identify areas of corporate management risk within NRC and conduct audits and/or investigations that lead to NRC program and operational improvements.

FY 2020 Congressional Budget Justification l 124

OFFICE OF THE INSPECTOR GENERAL Strategy 3-2: Identify risks in maintaining a secure infrastructure (i.e., physical, personnel, and cyber security), and conduct audits and/or investigations that lead to NRC program and operational improvements.

FY 2020 NRC OIG BUDGET RESOURCES LINKED TO STRATEGIC GOALS The following table depicts the relationship of the Inspector General program and associated resource requirements to the NRC OIG strategic goals.

NRC OIG Budget Resources Linked to OIG's Strategic Goals (Dollars in Millions)

Strengthen NRC's Improve NRC's Program Links to Enhance NRCs Public Health & Resource Stewardship Strategic Goals Security Efforts Safety Efforts Efforts

$M $M $M $M FY 2020 Programs ($12.143)1 Audits

$7.93 3.412 1.349 3.173 Investigations

$4.21 1.642 0.421 2.146 Numbers may not add due to rounding.

1The budget resources linked to the NRC OIG strategic goals does not include the $1.171M for the DNFSB.

FY 2020 Congressional Budget Justification l 125

OFFICE OF THE INSPECTOR GENERAL NRC OIG PROGRAM PERFORMANCE MEASURES NRC OIG Strategic Goal 1: Strengthen the NRCs Efforts To Protect Public Health and Safety and the Environment 2015 2016 2017 2018 2019 2020 Measure 1. Percentage of OIG products and activities that have a high impact1 on improving the NRCs safety program.2 Target 85% 85% 85% 85%

Actual 100% 100% 100% 91%

Measure 2. Percentage of OIG audit products and activities that cause the agency to take corrective action to improve agency safety programs; ratify adherence to agency policies, procedures, or requirements; or identify real dollar savings or reduced regulatory burden (i.e., high impact).3 Target 85% 85%

Actual TBD TBD Measure 3. Percentage of audit recommendations agreed to by agency.

Target 92% 92% 92% 92% 92% 92%

Actual 86%4 100% 95% 100% TBD TBD Measure 4. Percentage of final agency actions taken within 2 years on audit recommendations.

Target 70% 70% 70% 70% 70% 70%

Actual 47%5 76% 75% 67%6 TBD TBD Measure 5. Percentage of OIG investigative products and activities that identify opportunities for improvements to agency safety programs; ratify adherence to policies/procedures; or confirm or disprove allegations of wrongdoing (e.g., high impact).7 Target 85% 85%

Actual TBD TBD Measure 6. Percentage of agency actions taken in response to investigative reports.

Target 90% 90% 90% 90% 90% 90%

Actual 100% 100% 0%8 N/A TBD TBD Measure 7. Percentage of active cases completed in less than 18 months.

Target 90% 90% 90% 90% 90% 90%

Actual 50%9 60%10 0%11 83%12 TBD TBD Measure 8. Percentage of closed investigations referred to DOJ or other relevant authorities.

Target 20%13 20% 20% 20% 20% 20%

14 Actual N/A N/A N/A 0% TBD TBD Measure 9. Percentage of closed investigations resulting in indictments, convictions, civil suits or settlements, judgments, administrative actions, monetary results, or IG clearance letters. 15 Target 60% 60% 60% 60% 60% 60%

Actual 50% 100% 0%16 0%17 TBD TBD 1High impact is the effect of an issued report or activity undertaken that results in: (a) confirming risk areas or management challenges that caused the agency to take corrective action, (b) real dollar savings or reduced regulatory burden, (c) identifying significant wrongdoing by individuals that results in criminal or administrative action, (d) clearing an individual wrongly accused, or (e) identifying regulatory actions or oversight that may have contributed to the occurrence of a specific event or incident or resulted in a potential adverse impact on public health or safety.

2This measure was replaced, beginning in FY 2019, with measures 2 and 5 to clarify the definitions of high impact for audits and investigations.

3This high-impact measure for audits was added, beginning in FY 2019.

4The agency required more than 90 days to resolve the two recommendations in the audit of NRCs oversight of active component aging. Subsequently both recommendations have been resolved.

5The agency required more than 2 years for final action on one of four recommendations on the audit of the NRCs issuance of general licenses. Final action was completed in October 2014.

FY 2020 Congressional Budget Justification l 126

OFFICE OF THE INSPECTOR GENERAL NRC OIG Strategic Goal 1: Strengthen the NRCs Efforts To Protect Public Health and Safety and the Environment 6Several audit reports included recommendations that required more than 2 years for the agency to finalize action on. These recommendations are now closed.

7This high-impact measure for investigations was added beginning in FY 2019.

8Only one case was applicable to this measure and the agency did not take action in response to the report.

9Of two active investigative cases measured in the safety arena for the year, one case was closed in less than 18 months, which resulted in an achievement rate of 50 percent.

10The complexity of two investigations in the safety arena required additional time to close these investigations.

11There was only one case applicable to this measure; the case was not closed within 18 months, resulting in a measure of 0 percent.

12 Five out of six cases were closed within 18 months. The sixth case took longer due to case complexity and the ongoing nature of the issue.

13In FY 2014, OIG began to measure closed investigations that resulted in a referral to the Department of Justice, State or local law enforcement officials, or relevant administrative authority.

14Neither of the safety related investigations warranted referral because neither identified a criminal violation of law.

15Starting in FY 2014, OIG began measuring the percentage of closed investigations that resulted in an indictment, conviction, civil suit or settlement, judgment, administrative action, or monetary result. Starting in FY 2017, OIG added closed investigations that resulted in IG clearance letters to this measure. A clearance letter is a document provided to an employee in cases where an investigation is initiated in response to an allegation of employee misconduct and the misconduct is not substantiated.

16Only one case was applicable to this measure and it did not result in any of the listed outcomes.

17Four technical cases focused on safety related procedures; none involved had individual misconduct and none were substantiated.

NRC OIG Strategic Goal 2: Enhance the NRCs Efforts To Increase Security in Response to an Evolving Threat Environment 2015 2016 2017 2018 2019 2020 Measure 1. Percentage of OIG products and activities that have a high impact on improving the NRCs security program.1 Target 85% 85% 85% 85%

Actual 100% 91% 100% 100%

Measure 2. Percentage of OIG audit products and activities that cause the agency to take corrective action to improve agency security programs; ratify adherence to agency policies, procedures, or requirements; or identify real dollar savings or reduced regulatory burden (i.e., high impact).2 Target 85% 85%

Actual TBD TBD Measure 3. Percentage of audit recommendations agreed to by the agency.

Target 92% 92% 92% 92% 92% 92%

Actual 100% 100% 100% 100% TBD TBD Measure 4. Percentage of final agency actions taken within 2 years on audit recommendations.

Target 70% 70% 70% 70% 70% 70%

Actual 82% 64%3 55%4 88% TBD TBD Measure 5. Percentage of OIG investigative products and activities that identify opportunities for improvements to agency security programs; ratify adherence to policies/procedures; or confirm or disprove allegations of wrongdoing (e.g., high impact).5 Target 85% 85%

Actual TBD TBD Measure 6. Percentage of agency actions taken in response to investigative reports.

Target 90% 90% 90% 90% 90% 90%

Actual 100% 100% N/A N/A TBD TBD Measure 7. Percentage of active cases completed in less than 18 months.

Target 90% 90% 90% 90% 90% 90%

Actual 100% 80%6 100% N/A TBD TBD Measure 8. Percentage of closed investigations referred to DOJ or other relevant authorities.

FY 2020 Congressional Budget Justification l 127

OFFICE OF THE INSPECTOR GENERAL NRC OIG Strategic Goal 2: Enhance the NRCs Efforts To Increase Security in Response to an Evolving Threat Environment Target 20% 20% 20% 20% 20% 20%

Actual N/A 100% 50% N/A TBD TBD Measure 9. Percentage of closed investigations resulting in indictments, convictions, civil suits or settlements, judgments, administrative actions, monetary results or IG clearance letters.

Target 60% 60% 60% 60% 60% 60%

Actual 100% 100% 33%7 N/A TBD TBD 1This measure was replaced, beginning in FY 2019, with measures 2 and 5 to clarify the definitions of high impact for audits and investigations.

2This high-impact measure for audits was added, beginning in FY 2019.

3One audit recommendation in the security arena required additional time to close. This recommendation has since been closed.

4Four of eight recommendations on the Independent Evaluation of NRCs Implementation of the Federal Information Security Management Act (FISMA) for Fiscal Year 2012 required additional time to close. These four recommendations have since been closed.

5This high-impact measure for investigations was added beginning in FY 2019.

6The complexity of one investigation in the security arena required additional time to close this investigation.

7Only one of three closed investigations resulted in an indictment, conviction, civil suit or settlement, judgment, administrative action, monetary result or IG clearance letter which resulted in an achievement rate of 33 percent.

NRC OIG Strategic Goal 3: Improve the Economy, Efficiency, and Effectiveness with Which the NRC Manages and Exercises Stewardship over Its Resources 2015 2016 2017 2018 2019 2020 Measure 1. Percentage of OIG completed products and activities that have a high impact on improving corporate management Programs.1 Target 85% 85% 85% 85%

Actual 87% 85% 93% 88%

Measure 2. Percentage of OIG audit products and activities that cause the agency to take corrective action to improve agency corporate management programs; ratify adherence to agency policies, procedures, or requirements; or identify real dollar savings or reduced regulatory burden (i.e., high impact).2 Target 85% 85%

Actual TBD TBD Measure 3. Percentage of audit recommendations agreed to by the agency.

Target 92% 92% 92% 92% 92% 92%

Actual 100% 100% 100% 100% TBD TBD Measure 4. Percentage of final agency actions taken within 2 years on audit recommendations.

Target 70% 70% 70% 70% 70% 70%

Actual 90% 80% 81% 62%3 TBD TBD Measure 5. Percentage of OIG investigative products and activities that identify opportunities for improvements to agency corporate management programs; ratify adherence to policies/procedures; or confirm or disprove allegations of wrongdoing (e.g., high impact).4 Target 85% 85%

Actual TBD TBD Measure 6. Percentage of agency actions taken in response to investigative reports.

Target 90% 90% 90% 90% 90% 90%

Actual 100% 100% 89%5 100% TBD TBD Measure 7. Percentage of active cases completed in less than 18 months.

Target 90% 90% 90% 90% 90% 90%

Actual 58%6 78%7 85%8 72%9 TBD TBD Measure 8. Percentage of closed investigations referred to DOJ or other relevant authorities.

Target 20% 20% 20% 20% 20% 20%

Actual 28% 45% 44% 12%10 TBD TBD FY 2020 Congressional Budget Justification l 128

OFFICE OF THE INSPECTOR GENERAL NRC OIG Strategic Goal 3: Improve the Economy, Efficiency, and Effectiveness with Which the NRC Manages and Exercises Stewardship over Its Resources Measure 9. Percentage of closed investigations resulting in indictments, convictions, civil suits or settlements, judgments, administrative actions, monetary results, or IG clearance letters.

Target 60% 60% 60% 60% 60% 60%

11 Actual 73% 71% 70% 46% TBD TBD 1This measure was replaced, beginning in FY 2019, with measures 2 and 5 to clarify the definitions of high impact for audits and investigations.

2This high-impact measure for audits was added, beginning in FY 2019.

3Several audit reports included recommendations that require more than 2 years for the agency to finalize action on. The agency is working to finalize actions so that these recommendations can be closed.

4This high-impact measure for investigations was added beginning in FY 2019.

5One of nine investigative cases resulted in no action taken in response to an investigative report which resulted in an 89 percent achievement rate.

6n the corporate management arena, OIG needed more than 18 months to complete action on average for 18 of 31 cases.

7The complexity of several investigations in the corporate management arena required additional time to close these investigations.

8The complexity of several investigations required additional time to close these investigations.

9The complexity of several investigations required additional time to close.

10Although we initially identified 17 cases with potential criminal violations, only 2 developed sufficient evidence to warrant referral.

11Two investigations were inconclusive; therefore, a clearance letter could not be issued. In another case, misconduct was identified; however, the agency did not take action.

VERIFICATION AND VALIDATION OF MEASURED VALUES AND PERFORMANCE The OIG uses an automated management information system to capture program performance data for the Audits and Investigations Programs. The integrity of the system was thoroughly tested and validated before implementation. Reports generated by the system provide both detailed information and summary data. All system data are deemed reliable.

PROGRAM EVALUATIONS (PEER REVIEWS)

An independent audit peer review performed in FY 2015 by the U.S. Federal Communications Commission OIG gave NRC OIG a peer review rating of Pass. This is the highest rating possible based on the available options of Pass, Pass with deficiencies, and Fail.

In addition, in October 2016, the Tennessee Valley Authority OIG issued a report documenting the results of its independent investigative peer review of OIGs Investigations Program. The program was found to be in compliance with quality standards established by the Council of the Inspectors General on Integrity and Efficiency and the Attorney General Guidelines for Offices of Inspectors General with Statutory Law Enforcement Authority.

FY 2020 Congressional Budget Justification l 129

OFFICE OF THE INSPECTOR GENERAL DNFSB OIG PROGRAM PERFORMANCE MEASURES Performance Measures for the DNFSB OIG Program 2015 2016 2017 2018 2019 2020 Measure 1. Percentage of OIG audits undertaken and issued within a year. 1 Target 60% 60% 60% 60%

Actual 83% 100% 100% 100% N/A N/A Measure 2. Percentage of OIG audit products and activities that cause the agency to take corrective action to improve agency safety, security, or corporate management programs; ratify adherence to agency policies, procedures, or requirements; or identify real dollar savings or reduced regulatory burden (i.e., high impact).2 Target 85% 85%

Actual TBD TBD Measure 3. Percentage of audit recommendations agreed to by the agency.3 Target 50% 50%

Actual TBD TBD Measure 4. Percentage of final Board actions taken within 2 years on audit recommendations.4 Target 50% 50% 50% 50% 50%

Actual 100% 100% 100% TBD TBD Measure 5. Percentage of OIG investigative products and activities that identify opportunities for improvements to agency safety, security, or corporate management programs; ratify adherence to policies/procedures; or confirm or disprove allegations of wrongdoing (e.g., high impact).5 Target 85% 85%

Actual TBD TBD Measure 6. Percentage of Board actions taken in response to investigative reports.6 Target 90% 90% 90% 90% 90%

Actual 100% 100% N/A TBD TBD Measure 7. Percentage of active cases completed in less than 18 months.7 Target 85% 85% 85% 85% 85%

Actual 100% 100% 100% TBD TBD 1OIG anticipates issuing six audit reports per year. This measure was been tracked since FY 2015 and replaced with measure 2 beginning in FY 2019.

2This high-impact measure for audits was added, beginning in FY 2019.

3This measure was added, beginning in FY 2019.

4This measure has been tracked since FY 2015.

5This high-impact measure for investigations was added beginning in FY 2019.

6This measure has been tracked since FY 2015.

7This measure has been tracked since FY 2015.

INSPECTOR GENERAL REFORM ACT CERTIFICATION FOR FY 2020 In accordance with the Inspector General Reform Act (Public Law 110-409), the OIG NRC budget request was submitted to the NRC Chairman for FY 2020 and was subsequently approved. In addition, the OIG DNFSB budget request was submitted to the DNFSB Chairman for FY 2020 who provided no comments.

Furthermore, OIGs total budget request includes $135,000 for OIG training. The amount requested provides for all OIG specific training requirements for which there is a fee charged to OIG for attendance. In addition, funds are available for the OIG share of the resources needed to support the Council of the Inspectors General on Integrity and Efficiency.

FY 2020 Congressional Budget Justification l 130

APPENDIX A: FULL COST OF U.S. NUCLEAR REGULATORY COMMISSION PROGRAMS APPENDIX A: FULL COST OF U.S. NUCLEAR REGULATORY COMMISSION PROGRAMS This appendix provides the full cost of U.S. Nuclear Regulatory Commission (NRC) programs.

The table below includes the allocated corporate support costs for all business lines, except for the High-Level Waste Business Line and the Office of the Inspector General, in addition to the business line costs presented in each chapter of this report.

Full Cost Budget Authority and Full-Time Equivalents (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Business Line/ Actuals Enacted* Request FY 2019 Major Program $M FTE $M FTE $M FTE $M FTE Operating Reactors 552.2 1,875.5 549.7 1,916.6 549.6 1,877.6 (0.1) (38.9)

New Reactors 142.6 475.1 140.6 482.6 130.8 428.6 (9.8) (54.0)

Nuclear Reactor Safety $694.7 2,350.7 $690.3 2,399.1 $680.4 2,306.2 $(9.9) (92.9)

Spent Fuel Storage and Transportation 37.9 120.5 34.5 125.0 37.0 127.7 2.5 2.7 Nuclear Materials Users 88.4 263.6 86.4 268.8 84.9 259.2 (1.5) (9.6)

Decommissioning and Low-Level Waste 40.4 134.0 37.3 130.0 34.9 117.6 (2.5) (12.4)

High-Level Waste 0.1 0.4 0.0 0.0 38.5 77.0 38.5 77.0 Fuel Facilities 37.8 133.4 34.7 120.0 32.1 111.3 (2.6) (8.8)

Nuclear Materials and Waste Safety $204.5 651.9 $193.0 643.9 $227.4 692.8 $34.3 48.9 Major Program Subtotal $899.2 3,002.6 $883.4 3,043.0 $907.8 2,999.0 $24.4 (44.0)

Integrated University Program 15.5 0.0 15.0 0.0 0.0 0.0 (15.0) 0.0 Subtotal $914.7 3,002.6 $898.4 3,043.0 $907.8 2,999.0 $9.4 (44.0)

Inspector General 13.3 60.8 12.6 63.0 13.3 63.0 0.7 0.0 Total $928.1 3,063.4 $911.0 3,106.0 $921.1 3,062.0 $10.1 (44.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, research and licensing activities within the Operating Reactors, Spent Fuel Storage and Transportation, Decommissioning and Low-Level Waste, and Corporate Support Business Lines were funded $20 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget. Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

FY 2020 Congressional Budget Justification l 131

APPENDIX A: FULL COST OF U.S. NUCLEAR REGULATORY COMMISSION PROGRAMS The fiscal year (FY) 2020 Congressional Budget Justification identifies the infrastructure and support costs for the NRC. The allocation methodology is consistent with the methodology used for preparing the agencys financial statements. The table below presents the associated infrastructure and support funding allocated to the programmatic funding to provide the full cost of each business line.

Corporate Support by Business Line (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Business Line/ Actuals Enacted Request FY 2019 Major Programs $M FTE $M FTE $M FTE $M FTE Operating Reactors 185.2 371.0 184.5 383.6 188.0 392.6 3.5 9.1 New Reactors 46.9 94.0 46.5 96.6 42.9 89.6 (3.5) (7.0)

Nuclear Reactor Safety $232.1 465.0 $231.0 480.1 $230.9 482.2 $(0.0) 2.1 Spent Fuel Storage and Transportation 11.9 23.8 12.0 25.0 12.8 26.7 0.8 1.7 Nuclear Materials Users 26.1 52.2 25.9 53.8 26.0 54.2 0.1 0.4 Decommissioning and Low-Level Waste 13.2 26.5 12.5 26.0 11.8 24.6 (0.7) (1.4)

High-Level Waste 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Fuel Facilities 13.2 26.4 11.6 24.0 11.1 23.3 (0.4) (0.8)

Nuclear Materials and Waste Safety $64.4 129.0 $62.0 128.9 $61.7 128.8 $(0.3) (0.1)

Total $296.4 594.0 $292.9 609.0 $292.6 611.0 $(0.4) 2.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

FY 2020 Congressional Budget Justification l 132

APPENDIX B: BUDGET AUTHORITY BY FUNCTION APPENDIX B: BUDGET AUTHORITY BY FUNCTION The U.S. Nuclear Regulatory Commissions (NRCs) budget authority is aggregated into the major categories of salaries and benefits, contract support, and travel. Salaries and benefits are estimated based on full-time equivalents (FTE), pay rates, pay raise assumptions, and the effective pay periods for pay raises. Benefits costs include the Federal Governments contributions for retirement, health benefits, life insurance, Medicare, Social Security, and the Thrift Savings Plan. Contract support comprises obligations for commercial contracts, interagency agreements, grants, and other nontravel services, such as rent and utility payments. Travel costs primarily comprise expenses for site inspections at regulated facilities, meetings with stakeholders, and international travel.

Budget Authority by Function (Dollars in Millions)

FY 2019 FY 2020 Changes from Enacted Request FY 2019 Salaries & Expenses (S&E) $M $M $M Salaries and Benefits 559.5 553.1 (6.4)

Contract Support 316.7 333.3 16.6 Travel 22.1 21.4 (0.7)

Total (S&E) $898.4 $907.8 $9.4 Office of the Inspector General (OIG)

Salaries and Benefits 10.9 11.3 0.4 Contract Support 1.4 1.7 0.3 Travel 0.3 0.3 0.0 Total (OIG) $12.6 $13.3 $0.7 Total NRC Appropriations Salaries and Benefits 570.4 564.4 (6.0)

Contract Support 318.1 335.0 16.9 Travel 22.4 21.7 (0.7)

Total (NRC) $911.0 $921.1 $10.1

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

FY 2020 Congressional Budget Justification l 133

APPENDIX C: AGENCY FEE RECOVERY APPENDIX C: AGENCY FEE RECOVERY The U.S. Nuclear Regulatory Commissions (NRCs) fee regulations are governed by the Independent Offices Appropriation Act of 1952 (IOAA) and the Omnibus Budget Reconciliation Act of 1990, as amended (OBRA-90). OBRA-90 requires the NRC to recover approximately 90 percent of its annual budget authority through fees, but this fee recovery requirement excludes specific amounts (i.e., nonfee items) identified in OBRA-90 or by other legislation.

OBRA-90 requires the NRC to use its IOAA authority to collect user fees for NRC work that provides specific benefits to identifiable applicants and licensees as defined in Title 10 of the Code of Federal Regulations (10 CFR) Part 170, Fees for Facilities, Materials, Import and Export Licenses, and Other Regulatory Services under the Atomic Energy Act of 1954, as Amended.

The NRC also assesses fees under 10 CFR Part 171, Annual Fees for Reactor Licenses and Fuel Cycle Licenses and Materials Licenses, Including Holders of Certificates of Compliance, Registrations, and Quality Assurance Program Approvals and Government Agencies Licensed by the NRC. These annual fees recover regulatory costs that are not otherwise collected through 10 CFR Part 170 fees, such as the costs of research and rulemaking activities.

The remaining portion of the NRCs annual budget authority that is not recovered through fees is used to offset certain budgeted activities, which the NRC refers to as fee-relief activities.

The 10 CFR Part 170 fee amount is estimated by license fee class using invoice data and adjustments to estimate workload projections. The agency develops the hourly rate used to collect 10 CFR Part 170 fees based on full-cost fee recovery guidance in accordance with Office of Management and Budget Circular No. A-25, User Charges, dated July 8, 1993. The rate is calculated by taking the sum of (1) recoverable budgeted resources for mission-direct and mission-indirect program salaries and benefits and (2) agency support costs (which include corporate support and Office of the Inspector General costs), then dividing it by mission-direct full-time equivalents (FTE) converted to hours. Mission-direct resources are budgeted to perform core work activities to fulfill the agency mission under the direct business lines.

Mission-indirect resources support the core mission-direct activities. These include, for example, supervisory support, nonsupervisory support, mission travel, and training.

The NRC allocates direct budgetary resources, based on supporting activities, to nine license fee classes: (1) power reactors, (2) spent fuel storage/reactor decommissioning, (3) research and test reactors and nonpower reactors, (4) fuel facilities, (5) materials users, (6) transportation, (7) uranium recovery, (8) import and export, and (9) rare earth. The 10 CFR Part 171 fee amount is calculated by license fee class by subtracting the estimated 10 CFR Part 170 fee amount from the allocated direct budgetary resources.

The following table delineates where the major portion of a business lines direct budgetary resources are allocated when calculating 10 CFR Part 171 fees for a license fee class. The indirect portion of a business lines resources (e.g., training, travel, mission support, and supervisors), as well as corporate support budgetary resources, is distributed among all license fee classes as part of the hourly rate.

FY 2020 Congressional Budget Justification l 135

APPENDIX C: AGENCY FEE RECOVERY CROSSWALK OF BUSINESS LINE ALLOCATION TO FEE CLASSES*

Business Line License Fee Class Operating Reactors Power Reactors, Research and Test Reactors and Nonpower Reactors, Import/Export New Reactors Power Reactors Fuel Facilities Fuel Facilities Nuclear Materials Users Materials Users, Import/Export Spent Fuel Storage and Transportation Spent Fuel Storage/Reactor Decommissioning, Transportation Decommissioning and Low-Level Waste Spent Fuel Storage/Reactor Decommissioning, Uranium Recovery, Rare Earth

  • Delineates where the major portion of a business lines direct budgetary resources are allocated for a license fee class. Does not include fee-relief activities. The NRC does not have licensees under the rare earth fee class at this time.

More information about 10 CFR Part 170 and 10 CFR Part 171 is posted on the NRCs public Web site.

If the NRC receives the full amount requested for fiscal year (FY) 2020, the estimated fee recovery amount for FY 2020 is $759.6 million, as shown on the following page.

FY 2020 Congressional Budget Justification l 136

APPENDIX C: AGENCY FEE RECOVERY Agency Fee Recovery (Dollars in Millions)

FY 2019 FY 2020 Proposed* Projection

$M $M Total Appropriation1 $911.0 $921.1 Less Nonfee-Recoverable Items $43.4 $77.1 Generic Homeland Security 14.6 14.2 Waste Incidental to Reprocessing 1.3 1.3 Advanced Reactors Regulatory Readiness 10.3 15.5 International Activities 16.1 6.5 Nuclear Waste Fund 0.0 38.5 Defense Nuclear Facilities Safety Board 1.1 1.2 Balance $867.6 $844.0 Fee Recovery Percent 90.0 90.0 Fees To Be Recovered $780.8 $759.6 Billing & Carryover Adjustments2 1.1 1.1 Adjusted Fee Recovery Amount $781.9 $760.7 Estimated Part 170 Fees Percent3 31.6 31.6 Estimated Part 170 Fees Amount $246.7 $240.0 Estimated Part 171 Fees Percent3 68.4 68.4 Estimated Part 171 Fees Amount $535.2 $520.6

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

  • In FY 2019, research and licensing activities within the Operating Reactors, Spent Fuel Storage and Transportation, Decommissioning and Low-Level Waste, and Corporate Support Business Lines were funded

$20 million through the use of authorized prior-year carryover which is not reflected in the FY 2019 Enacted Budget.

Please refer to Appendix I, FY 2019 Total Budget Authority Comparison, for details.

1Includes both salaries and expenses and Office of the Inspector General appropriations.

2The NRC applies billing and carryover adjustments to the estimated fee recovery amount to account for the sum of unpaid current-year invoices minus prior-year invoices that will be paid in the budget request year.

3Assumes same percentage from prior-year final fee rule.

FY 2020 Congressional Budget Justification l 137

APPENDIX D:

SUMMARY

OF REIMBURSABLE WORK APPENDIX D:

SUMMARY

OF REIMBURSABLE WORK The U.S. Nuclear Regulatory Commission (NRC) performs services for other Federal agencies and non-Federal organizations on a reimbursable basis. The NRCs reimbursable work is financed with funds provided by the ordering organization, which represent additional funding in excess of the NRCs directly appropriated funds. The table below lists anticipated reimbursable funding by category per fiscal year (FY).

Summary of Reimbursable Work (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Description of Work Actuals Request FY 2019

$M FTE $M FTE $M FTE $M FTE COOPERATIVE RESEARCH Foreign Cooperative Research 2.200 0.0 2.000 0.0 2.100 0.0 0.100 0.0 Agreements FACILITIES REVENUE Parking Receipts 0.000 0.0 0.015 0.0 0.015 0.0 0.000 0.0 Recycling Reimbursements (GSA) 0.000 0.0 0.008 0.0 0.008 0.0 0.000 0.0 INTERNATIONAL ASSISTANCE Cooperative Activities Travel (Nuclear 0.194 0.0 0.142 0.0 0.000 0.0 (0.142) 0.0 Regulation Authority of Japan)

International Invitational Travel (IAEA) 0.182 0.0 0.400 0.0 0.350 0.0 (0.050) 0.0 International Travel (AIT) 0.010 0.0 0.015 0.0 0.015 0.0 0.000 0.0 SECURITY RELATED ACTIVITIES Criminal History Program 1.899 3.4 1.700 2.0 1.700 2.0 0.000 0.0 Information Access Authorization 0.401 1.3 0.540 1.5 0.540 1.5 0.000 0.0 Program Material Access Authorization Program 0.013 0.1 0.000 0.5 0.000 0.5 0.000 0.0 TECHNICAL ASSISTANCE TO OTHER FEDERAL AGENCIES Employee Detail to Army Corps of 0.168 0.6 0.145 0.4 0.000 0.0 (0.145) (0.4)

Engineers (USACE)

Employee Detail to Domestic Nuclear 0.091 0.4 0.165 0.8 0.221 1.0 0.056 0.2 Detection Office (DHS)

Employee Detail to Office of 0.005 0.1 0.000 0.0 0.000 0.0 0.000 0.0 Management and Budget (OMB)

Fuel Cycle Research and Development 0.219 0.2 0.175 0.4 0.100 0.5 (0.075) 0.1 (DOE)

Joint Funding of International Commission on Radiological 0.025 0.0 0.000 0.0 0.000 0.0 0.000 0.0 Protection Activities (EPA)

Mars 2020 Mission Interagency Nuclear 0.100 0.4 0.105 0.3 0.044 0.2 (0.061) (0.1)

Safety Review Panel (NASA)

FY 2020 Congressional Budget Justification l 139

APPENDIX D:

SUMMARY

OF REIMBURSABLE WORK Summary of Reimbursable Work (Dollars in Millions)

FY 2018 FY 2019 FY 2020 Changes from Description of Work Actuals Request FY 2019

$M FTE $M FTE $M FTE $M FTE Revalidation of Selected Foreign Certificates for Packages (Casks) 0.000 0.0 0.100 0.3 0.000 0.3 (0.100) 0.0 (DOE)

Response to Hurricane Harvey (FEMA) 0.042 0.0 0.000 0.0 0.000 0.0 0.000 0.0 Response to Hurricane Irma (FEMA) 0.098 0.0 0.000 0.0 0.000 0.0 0.000 0.0 Response to Hurricane Maria (FEMA) 0.068 0.0 0.000 0.0 0.000 0.0 0.000 0.0 U.S. Navy Reviews (DOD) 0.004 0.1 0.012 0.1 0.012 0.1 0.000 0.0 Waste Actions for Hanford (DOE) 0.228 0.9 0.600 2.0 0.600 2.0 0.000 0.0 AGENCY TOTAL 5.946 7.3 $6.122 8.3 $5.705 8.1 ($0.417) (0.2)

$M includes full-time equivalent (FTE) costs as well as contract support and travel. Numbers may not add due to rounding.

Does not include classified reimbursable work agreements. FY 2018 $M represents actual amounts obligated. FY 2019 and FY 2020 $M represent new reimbursable budget authority expected in the FY from Federal agencies or other outside sources.

FY 2020 Congressional Budget Justification l 140

APPENDIX E: FITARA REQUIREMENTS APPENDIX E: FEDERAL INFORMATION TECHNOLOGY ACQUISITION REFORM ACT REQUIREMENTS February 1, 2019 MEMORANDUM TO: Office of Management and Budget FROM: David J. Nelson /RA/

Chief Information Officer Office of the Chief Information Officer U.S. Nuclear Regulatory Commission Maureen E. Wylie /RA/

Chief Financial Officer Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission

SUBJECT:

INFORMATION TECHNOLOGY RESOURCE STATEMENTS In accordance with OMB Circular A-11, Sec. 51.3, the U.S. Nuclear Regulatory Commission (NRC) is providing this memorandum to demonstrate compliance with the Federal Information Technology Acquisition Reform Act (FITARA) through the following Information Technology (IT)

Resource Statements:

The NRCs Chief Information Officer (CIO) affirms that he collaborated with the Chief Financial Officer (CFO) on the IT Budget submissions, and those submissions include appropriate estimates of all IT resources included in the agencys budget request.

The NRCs CIO affirms that he has thoroughly reviewed and had significant input in approving all IT Investments included in the agencys budget request.

The NRCs Chief Financial Officer (CFO) and CIO affirm that the agencys CIO had a significant role in reviewing planned IT support for major programs and significant increases and decreases in IT resources reflected in the agencys budget request.

The CIO's current common baseline rating for Element D, Item D1, CIO reviews and approves Major IT Investment portion of budget request, is Fully Implemented.

The NRC has developed and implemented its plan to ensure that the necessary processes and procedures are in place to fulfill these common baseline FITARA responsibilities.

The CIO can certify the use of modular approaches and/or incremental development practices, as appropriate, for contracts and projects associated with IT Investments included in the agencys budget request.

FY 2020 Congressional Budget Justification l 141

APPENDIX E: FITARA REQUIREMENTS INFORMATION TECHNOLOGY TABLE In enacting the Federal Information Technology Acquisition Reform Act, Congress established Governmentwide information technology (IT) management controls and required an inclusive governance process that enables effective planning, budgeting, and execution for IT investments. Consistent with that mandate, Section 51.3, Analysis of Resources, of Office of Management and Budget (OMB) Circular A-11, Preparation, Submission, and Execution of the Budget, issued July 2016, requires the following summary of agency IT spending by Treasury Account Fund Symbol (TAFS), as well as the tabular presentation on the following pages depicting the financial and personnel resources for all IT investments within each agency program area. For each IT investment, this table provides the investment title, its unique investment identifier (UII), all supported program names, and budget authority level for the prior year (PY) (fiscal year (FY) 2018), current year (CY) (FY 2019), and budget year (BY) (FY 2020).

NRC IT Spending1 (Dollars in Millions)

FY 2018 (PY) FY 2019 (CY) FY 2020 (BY)

TAFS CS&T FTE Total CS&T2 FTE Total CS&T FTE Total 129.179 162.23 156.917 126.744 175.5 157.933 130.886 182.0 163.417 429-00-0200 0

Note 1: Table represents FY 2018 (PY) Actual Expenditures, FY 2019 (CY) Enacted, and Agency Budget Request for FY 2020 (BY), as required by OMB Circular A-11, Section 55, "Information Technology Investments,"

https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/assets/a11_current_year/a11_2017/s55.pdf, page 5 Note 2: Figures shown for FY 2019 exclude $2.632M in authorized carryover included in the enacted budget.

FY 2020 Congressional Budget Justification l 142

NRC IT Table1 (Dollars in Millions)

FY 2018 (PY) FY 2019 (CY)4 FY 2020 (BY)

UII IT Investment Title Program Area CS&T FTE Total CS&T FTE Total CS&T FTE Total 429- Facilities, Space, and 02: Corporate 000000500 Property Management Support 0.351 1.09 0.536 0.489 0.55 0.586 0.449 0.50 0.538 429- Facilities, Space, and 03: Nuclear Reactor 000000500 Property Management Safety 0.000 0.00 0.000 0.008 0.00 0.008 0.010 0.00 0.010 429- Personnel Security 02: Corporate 000000600 Management Support 0.445 1.49 0.698 0.844 0.50 0.932 0.583 1.50 0.849 Document and 429- Knowledge 02: Corporate 000001300 Management Support 0.640 0.01 0.641 0.351 0.00 0.351 0.163 0.00 0.163 429- 02: Corporate 000001400 Public Outreach Support 0.462 0.10 0.479 0.567 0.00 0.567 0.392 0.00 0.392 429- 02: Corporate 000001500 Web Services Support 0.641 4.12 1.341 1.017 2.50 1.457 0.886 3.00 1.417 429- Human Resource and 02: Corporate 000002100 Training Support Support 0.580 0.00 0.580 0.271 0.00 0.271 0.376 3.00 0.907 429- Human Resource and 03: Nuclear Reactor 000002100 Training Support Safety 0.448 0.00 0.448 0.320 0.00 0.320 0.669 0.00 0.669 04: Nuclear 429- Human Resource and Materials & Waste 000002100 Training Support Safety 0.000 0.00 0.000 0.000 0.00 0.000 0.055 0.00 0.055 429- 02: Corporate 000002500 Financial Services Support 8.749 7.23 9.978 10.737 9.00 12.321 8.601 7.90 9.999 429- Enterprise-wide 02: Corporate 000002600 Acquisition Services Support 4.510 2.15 4.875 5.902 2.00 6.254 5.875 2.00 6.229 Workflow, Tracking, 429- and Decision-making 02: Corporate 000003100 Support Support 0.040 0.04 0.047 0.118 0.00 0.118 0.088 0.00 0.088 Secure 429- Communications 03: Nuclear Reactor 000003400 System Safety 3.297 6.12 4.367 2.658 7.00 3.946 2.745 8.00 4.217 429- 03: Nuclear Reactor 000003600 Incident Response Safety 2.785 2.39 3.203 4.297 5.00 5.217 3.637 3.00 4.189 429- NRC IT Security and 02: Corporate 16.443 31.25 21.945 000006200 Compliance Support 16.406 26.87 20.973 14.729 31.00 20.216 429- NRC IT Security and 03: Nuclear Reactor 000006200 Compliance Safety 0.000 0.00 0.000 0.859 0.00 0.859 0.859 0.00 0.859 FY 2020 Congressional Budget Justification l 143 APPENDIX E: FITARA REQUIREMENTS

NRC IT Table1 (Dollars in Millions)

FY 2018 (PY) FY 2019 (CY)4 FY 2020 (BY)

UII IT Investment Title Program Area CS&T FTE Total CS&T FTE Total CS&T FTE Total 04: Nuclear 429- NRC IT Security and Materials & Waste 000006200 Compliance Safety 0.000 0.00 0.000 0.237 0.00 0.237 0.237 0.00 0.237 429- 02: Corporate 000007700 NRC IT Management Support 0.909 16.47 3.709 0.715 24.00 4.940 0.974 24.00 5.222 Electronic Document 429- Authentication and 02: Corporate 000008000 Transmission Support 0.046 0.00 0.046 0.027 0.00 0.027 0.027 0.00 0.027 04: Nuclear 429- Materials Licensing Materials & Waste 000008200 and Oversight Safety 8.810 4.13 9.532 8.240 6.00 9.350 8.048 5.00 8.965 429- Reactor Licensing and 03: Nuclear Reactor 000008400 Oversight Safety 9.869 15.79 12.651 8.729 12.00 10.954 8.147 12.00 10.368 High Performance APPENDIX E: FITARA REQUIREMENTS Computing and Scientific Software - 04: Nuclear 429- Materials and Waste Materials & Waste 000008500 Safety Safety 0.283 0.00 0.283 0.480 0.00 0.480 0.557 0.00 0.557 FY 2020 Congressional Budget Justification l 144 High Performance Computing and 429- Scientific Software - 03: Nuclear Reactor 000008600 Reactor Safety Safety 1.723 1.12 1.919 2.520 2.00 2.888 2.442 1.00 2.626 High-Level Waste 04: Nuclear 429- Licensing and Materials & Waste 000008700 Oversight2 Safety 0.000 0.00 0.000 0.000 0.00 0.000 10.391 8.00 11.911 429- NRC Data Center and 02: Corporate 000009100 Cloud Support 10.270 7.20 11.493 14.902 4.20 15.641 12.450 6.00 13.512 429- NRC Data Center and 03: Nuclear Reactor 000009100 Cloud Safety 2.115 0.00 2.115 1.147 0.00 1.147 1.546 0.00 1.546 04: Nuclear 429- NRC Data Center and Materials & Waste 000009100 Cloud Safety 1.286 0.00 1.286 0.318 0.00 0.318 0.424 0.00 0.424 429- 02: Corporate 000009200 NRC Network Support 12.437 14.71 14.937 9.639 7.75 11.003 9.153 3.00 9.684 429- 03: Nuclear Reactor 000009200 NRC Network Safety 2.440 1.91 2.765 2.068 2.00 2.436 2.743 0.00 2.743 04: Nuclear 429- Materials & Waste 000009200 NRC Network Safety 0.875 0.00 0.875 0.442 0.00 0.442 0.667 0.00 0.667

NRC IT Table1 (Dollars in Millions)

FY 2018 (PY) FY 2019 (CY)4 FY 2020 (BY)

UII IT Investment Title Program Area CS&T FTE Total CS&T FTE Total CS&T FTE Total 429- 02: Corporate 000009300 NRC Delivery Support 2.902 16.64 5.730 3.272 18.00 6.441 3.198 19.00 6.561 429- 02: Corporate 000009400 NRC End User Support 20.776 18.68 23.950 15.319 24.00 19.544 14.322 31.00 19.809 429- 03: Nuclear Reactor 000009400 NRC End User Safety 0.011 0.00 0.011 0.733 0.00 0.733 3.235 0.00 3.235 04: Nuclear 429- Materials & Waste 000009400 NRC End User Safety 0.019 0.00 0.019 0.176 0.00 0.176 0.809 0.00 0.809 429- 03: Nuclear Reactor 000009500 NRC Failover Site Safety 0.194 0.02 0.197 0.050 0.00 0.050 0.138 0.00 0.138 429- 02: Corporate 000009600 NRC Application Support 2.619 2.12 2.979 1.643 4.25 2.391 2.523 4.25 3.275 429- 03: Nuclear Reactor 000009600 NRC Application Safety 0.106 0.00 0.106 0.200 0.00 0.200 0.100 0.00 0.100 429- 02: Corporate 000009700 NRC Platform3 Support 9.238 6.61 10.361 8.401 7.50 9.721 6.555 5.75 7.573 429- 03: Nuclear Reactor 000009700 NRC Platform3 Safety 0.379 0.00 0.379 0.142 0.00 0.142 0.142 0.00 0.142 04: Nuclear 429- Materials & Waste 000009700 NRC Platform3 Safety 0.039 0.00 0.039 0.041 0.00 0.041 0.041 0.00 0.041 04: Nuclear 429- Materials & Waste 999990060 E-Rulemaking Safety 0.113 0.00 0.113 0.118 0.00 0.118 0.113 0.00 0.113 429- 02: Corporate 999990220 E-Travel Support 0.552 0.99 0.720 0.600 1.00 0.776 0.458 1.10 0.653 429- Integrated Award 02: Corporate 999990230 Environment Support 0.058 0.00 0.058 0.063 0.00 0.063 0.042 0.00 0.042 429- Financial Management 02: Corporate 999991100 LOB Support 0.041 0.00 0.041 0.042 0.00 0.042 0.029 0.00 0.029 429- IBC Shared Service 02: Corporate 999991204 Center (HRLoB) Support 1.200 2.27 1.586 1.223 3.00 1.751 1.090 2.00 1.444 429- 02: Corporate 999991217 E-Training Support 0.451 1.96 0.784 0.209 2.00 0.561 0.000 0.00 0.000 429- 02: Corporate 999991218 USAJobs Support 0.000 0.00 0.000 0.027 0.00 0.027 0.028 0.00 0.028 FY 2020 Congressional Budget Justification l 145 APPENDIX E: FITARA REQUIREMENTS

NRC IT Table1 (Dollars in Millions)

FY 2018 (PY) FY 2019 (CY)4 FY 2020 (BY)

UII IT Investment Title Program Area CS&T FTE Total CS&T FTE Total CS&T FTE Total 429- Enterprise Human 02: Corporate 999991219 Resource Integration Support 0.064 0.00 0.064 0.140 0.00 0.140 0.140 0.00 0.140 Total 129.179 162.23 156.917 126.744 175.50 157.933 130.886 182.0 163.417 Note 1: Table represents FY 2018 (PY) Actual Expenditures, FY 2019 (CY) Enacted, and Agency Budget Request for FY 2020 (BY), as required by OMB Circular A-11, Section 55, "Information Technology Investments" (page 6) https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/assets/a11_current_year/a11_2017/s55.pdf Note 2: This investment includes IT components that support efficient licensing activities concerning the nuclear waste repository at Yucca Mountain.

Note 3: New Investment introduced for FY 2020 budget submission, consistent with OMB's FY 2020 IT Budget - Capital Planning Guidance (not a Cybersecurity investment or High Value Asset System). This is a Standard Investment for the provisioning of an enterprise-wide platform capability as defined by the Platform tower to include sub-towers; database, middleware, mainframe database, and mainframe middleware.

Note 4: Figures shown for FY 2019 exclude $2.632M in authorized carryover included in the enacted budget ($1.072M for NRC Application, $0.632M for NRC IT Security and Compliance, and $0.928M for NRC Platform).

APPENDIX E: FITARA REQUIREMENTS FY 2020 Congressional Budget Justification l 146

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES (AS OF DECEMBER 5, 2018)

The table below lists of all of the U.S. Nuclear Regulatory Commissions (NRCs) rulemaking activities, including their priority and schedule, as of December 5, 2018. Of the 81 rulemaking activities listed, 58 are planned rulemaking activities and 23 are petitions for rulemaking that are currently under NRC review. The total rulemaking budget for fiscal year (FY) 2020 includes

$16.6 million and 86 full-time equivalents. The NRC has published the most current information available on the status of the agencys rulemaking activities on its public Web site.

At the time of publication, each proposed and final rule includes a statement that addresses actions taken to adhere to applicable backfitting and issue finality requirements. This includes discussing which backfitting and issue finality requirements apply and how NRC staff evaluated the rule with respect to those requirements. In an effort to improve consistency in applying these requirements, the agency provides training on backfitting and issue finality to staff who engage in activities where these topics arise. The agencys Committee to Review Generic Requirements also reviews all rulemakings that meet defined criteria to provide additional confirmation that backfitting and issue finality requirements are applied to rulemakings appropriately and consistently.

Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date 2018 Edition of the American Society of NRC-Rulemaking Mechanical 3150-1 High 2017- N/A 12/6/2016 N/A 4/30/2020 5/29/2020 2/26/2021 6/30/2021 Actions Engineers AJ97 0028 Operations and Maintenance Code 2019 Edition of the American Society of NRC-Rulemaking 3150-2 Mechanical High 2017- N/A 11/2/2017 N/A 4/30/2020 5/29/2020 2/26/2021 6/30/2021 Actions AK09 Engineers Boiler 0226 and Pressure Vessel Code Advanced Boiling-Water NRC-Rulemaking Reactor (ABWR) 3150-3 High 2017- N/A 3/30/2017 N/A N/A N/A N/A N/A Actions Design AK04 0090 Certification Renewal Advanced Power Reactor-1400 NRC-Rulemaking 3150-4 (APR14100) High 2015- N/A 3/4/2015 N/A 1/8/2019 3/8/2019 1/8/2019 3/8/2019 Actions AJ67 Design 0224 Certification5 5 The NRC will conduct this action using a rulemaking process that allows the NRC to publish a direct final rule and a companion proposed rule in the same issue of the Federal Register.

FY 2020 Congressional Budget Justification l 147

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date American Society of Mechanical Engineers 2015- NRC-Rulemaking 3150-5 2017 Code High 2016- N/A 7/1/2015 N/A 10/5/2018 11/9/2018 8/30/2019 12/20/2019 Actions AJ74 Editions 0082 Incorporation by Reference Approval of American Society NRC-Rulemaking of Mechanical 3150-6 High 2017- N/A 7/1/2014 N/A 6/11/2018 8/16/2018 6/3/2019 9/2/2019 Actions Engineers Code AJ93 0024 Cases, Revision 38 Approval of American Society NRC-Rulemaking of Mechanical 3150-7 High 2017- N/A 5/1/2016 N/A 10/1/2019 11/1/2019 9/1/2020 10/1/2020 Actions Engineers Code AJ94 0025 Cases, Revision 39 NRC-Rulemaking Cyber Security 3150-8 High 2015- N/A 3/24/2015 4/12/2016 10/4/2017 3/29/19 11/29/2019 2/28/2020 Actions for Fuel Facilities AJ64 0179 Drug and Alcohol Testing: NRC- PRM-26-4, Rulemaking 3150-9 Technical Issues High 2012- PRM-26-7, N/A 9/1/2019 9/1/2020 2/1/2021 12/1/2021 5/1/2022 Actions AJ15 and Editorial 0079 PRM-26-8 Changes Enhanced Security for NRC-Rulemaking 3150-10 Special Nuclear High 2014- N/A 2/8/2006 4/22/2015 10/31/2018 1/15/2019 1/15/2020 4/29/2020 Actions AJ41 Material 0118 Enhanced Weapons for Spent Fuel NRC-Rulemaking Storage 3150-11 High 2015- N/A 8/15/2008 3/29/2019 3/26/2020 7/23/2020 3/25/2021 7/22/2021 Actions Installations and AJ55 0018 Transportation Section 161A Authority Enhanced Weapons, Firearms NRC-Rulemaking 3150-12 Background High 2011- N/A 8/8/2005 N/A 3/16/2015 9/22/2015 5/21/2018 1/31/2019 Actions AI49 Checks, and 0018 Security Event Notifications Fitness-for-Duty NRC-Rulemaking Drug Testing 3150-13 High 2009- N/A 9/1/2012 7/1/2013 2/22/2017 2/28/2019 11/29/2019 2/28/2020 Actions Program AI67 0225 Requirements Greater-Than-NRC-Rulemaking Class-C and 3150-14 High 2017- N/A 12/22/2015 11/5/2019 N/A N/A N/A N/A Actions Transuranic AK00 0081 Waste FY 2020 Congressional Budget Justification l 148

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date Independent Spent Fuel NRC-Rulemaking Storage 3150-15 High 2009- PRM-72-6 N/A 1/18/2021 7/28/2022 10/27/2022 1/18/2024 3/28/2024 Actions Installation AI78 0558 Security Requirements Industrial NRC-Rulemaking Radiographic 16 High N/A 2017- PRM-34-6 N/A N/A N/A N/A N/A N/A Actions Operations and 0022 Training Integrated Radioactive NRC-Rulemaking 17 Source Security High N/A 2015- PRM-37-1 N/A N/A N/A N/A N/A N/A Actions and 0094 Accountability List of Approved Spent Fuel Storage Cask:

HI-STORM 100 Multipurpose Canister (MPC) NRC-Rulemaking 3150-18 Storage System High 2018- N/A 9/25/2018 N/A 11/20/2018 1/17/2019 11/20/2018 1/17/2019 Actions AK18 Certificate of 0221 Compliance No. 1014, Amendments No. 11 and No. 12 List of Approved Spent Fuel Storage Casks Rulemaking 19 [This is a High N/A N/A N/A N/A N/A N/A N/A N/A N/A Actions placeholder for several annually recurring rules.]

List of Approved Spent Fuel Storage Casks:

NAC NRC-Rulemaking International, 3150-20 High 2018- N/A 9/24/2018 N/A 11/21/2018 1/17/2019 11/21/2018 1/17/2019 Actions Inc., NAC-MPC AK17 0220 Storage System, CoC No. 1025, Amendment No.

7&8 List of Approved Spent Fuel Storage Casks:

NAC NRC-Rulemaking International, 3150-21 High 2018- N/A 3/29/2018 N/A 9/24/2018 10/22/2018 9/24/2018 10/22/2018 Actions Inc., NAC-UMS AK12 0075 Storage System, CoC No. 1015, Amendment No. 6 FY 2020 Congressional Budget Justification l 149

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date List of Approved Spent Fuel Storage Casks:

Transnuclear NRC-Rulemaking Inc., 3150-22 High 2018- N/A N/A N/A 11/01/2018 11/7/2018 11/01/2018 11/7/2018 Actions Standardized AK16 0212 NUHOMS Cask System (Amendment No. 15)

List of Approved Spent Fuel Storage Casks:

Transnuclear, Inc.,

NRC-Rulemaking Standardized 3150-23 High 2018- N/A 11/1/2018 N/A 12/17/2018 1/3/2019 12/17/2018 1/3/2019 Actions Advanced AK20 0265 NUHOMS Storage System, CoC No. 1029, Amendment No. 4 Low-Level NRC-Rulemaking 3150-24 Radioactive High 2011- N/A 3/18/2009 N/A 7/18/2013 3/26/2015 6/30/2019 9/30/2019 Actions AI92 Waste Disposal 0012 PRM 96, PRM-50-97, Mitigation of NRC- PRM Rulemaking Beyond-Design- 3150-25 High 2014- 98, PRM- 10/18/2011 7/23/2013 4/30/2015 11/13/2015 12/15/2016 1/22/2019 Actions Basis-Events AJ49 0240 50-100, (MBDBE)

PRM 101, PRM-50-102 NuScale Small NRC-Rulemaking Modular Reactor 3150-26 High 2017- N/A 3/23/2017 6/23/2020 7/18/2020 9/3/2020 11/6/2020 1/8/2021 Actions Design AJ98 0029 Certification Performance-Based NRC- PRM Rulemaking Emergency Core 3150-27 High 2008- 71, PRM- 3/31/2003 7/31/2008 3/1/2012 3/24/2014 3/16/2016 1/22/2019 Actions Cooling System AH42 0332 50-84 Acceptance Criteria Regulatory Improvements for Production and NRC-Rulemaking 3150-28 Utilization High 2015- N/A 12/30/2014 11/27/2017 5/7/2018 2/28/2019 10/7/2019 12/30/2019 Actions AJ59 Facilities 0070 Transitioning to Decommissioning Revision of Fee NRC-Rulemaking Schedules: Fee 3150-29 High 2017- N/A 10/19/2018 N/A 1/12/2019 1/30/2019 5/12/2019 5/30/2019 Actions Recovery for FY AJ99 0032 2019 Revision of Fee NRC-Rulemaking Schedules: Fee 3150-30 High 2017- N/A 11/13/2019 N/A 1/13/2020 1/31/2020 5/12/2020 5/29/2020 Actions Recovery for FY AK10 0228 2020 FY 2020 Congressional Budget Justification l 150

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date U.S. Advanced Pressurized NRC-Rulemaking Water Reactor 3150-31 High 2010- N/A 2/29/2008 N/A N/A N/A N/A N/A Actions (US-APWR) AI83 0133 Design Certification Access NRC-Rulemaking Authorization and 3150-32 Medium 2016- N/A 6/6/2016 3/31/19 9/18/2019 12/31/2019 10/30/2020 4/30/2021 Actions Fitness-for-Duty AJ79 0145 Determinations Adjustment of NRC-Rulemaking Civil Penalties for 3150-33 Medium 2017- N/A 11/15/2018 N/A N/A N/A 11/13/2018 1/15/2019 Actions Inflation for FY AK02 0088 2019 Adjustment of NRC-Rulemaking Civil Penalties for 3150-34 Medium 2018- N/A 11/13/2019 N/A N/A N/A 11/13/2019 1/15/2020 Actions Inflation for FY AK11 0048 2020 Alternative Physical Security NRC-Rulemaking 3150-35 Requirements for Medium 2017- N/A 11/19/2018 12/2/2019 1/29/2021 4/29/2021 2/28/2022 5/28/2022 Actions AK19 Advanced 0227 Reactors Amendments to NRC-Rulemaking Material Control 3150-36 Medium 2009- N/A 2/5/2009 N/A 9/30/2013 11/8/2013 10/15/2018 1/31/2019 Actions and Accounting AI61 0096 Regulations Decommissioning Financial Assurance for Germanium- NRC-Rulemaking 37 68/Gallium-68 Medium N/A 2017- N/A N/A N/A N/A N/A N/A N/A Actions Generators 0031 Returned to Manufacturers or Distributors Emergency Preparedness Requirements for NRC-Rulemaking 3150-38 Small Modular Medium 2015- N/A 6/22/2016 11/15/2017 10/12/2018 12/28/2018 2/14/2020 4/30/2020 Actions AJ68 Reactors and 0225 Other New Technologies Financial NRC-Rulemaking Qualifications for 3150-39 Medium 2014- N/A 4/24/2014 N/A 3/15/2018 1/31/2019 6/13/2019 9/13/2019 Actions Reactor AJ43 0161 Licensing Geologic Repository NRC-Rulemaking Operations Area 3150-40 Medium 2009- N/A N/A 9/17/2040 3/17/2042 9/17/2042 9/17/2043 3/17/2044 Actions (GROA) Fitness- AI38 0089 For-Duty 6

Requirements 6 This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the U.S. Department of Energy (DOE) license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

FY 2020 Congressional Budget Justification l 151

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date Geologic Repository Operations Area NRC-Rulemaking 3150-41 Security and Medium 2007- N/A N/A 3/16/2040 9/16/2041 3/16/2042 3/16/2043 7/15/2043 Actions AI06 Material Control 0670 and Accounting Requirements7 Groundwater Protection In Situ NRC-Rulemaking 3150-42 Leach Uranium Medium 2008- N/A 3/24/2006 N/A 11/19/2018 2/19/2019 3/20/2020 7/20/2020 Actions AI40 Recovery 0421 Facilities Incorporation of Lessons Learned From New Reactor NRC-Rulemaking Licensing 3150-43 Medium 2009- N/A 9/22/2015 N/A N/A N/A N/A N/A Actions Process (10 CFR AI66 0196 Parts 50 and 52 Licensing Process Alignment)

Institute of Electrical and Electronics NRC-Rulemaking 44 Engineers Medium N/A 2018- N/A N/A N/A N/A N/A N/A N/A Actions Standard 603 0046 Incorporation by Reference Items Containing Byproduct NRC-Rulemaking 3150-45 Material Medium 2015- PRM-30-65 8/13/2012 2/28/2019 2/28/2020 5/29/2020 5/31/2021 8/31/2021 Actions AJ54 Incidental to 0017 Production Miscellaneous Administrative Rulemaking [This is a placeholder Rulemaking for one or more 46 Medium N/A N/A N/A N/A N/A N/A N/A N/A N/A Actions rules making administrative or corrective changes to the CFR]

Modifications to NRC-Rulemaking Pressure- 3150-47 Medium 2008- PRM-50-69 8/8/2014 9/17/2018 9/16/2019 12/16/2019 9/16/2020 12/15/2020 Actions Temperature AG98 0582 Limits8 7 This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

8 This rulemaking has been identified for discontinuation based on Commission direction in SRM-SECY-16-0009, Staff RequirementsSECY-16-0009Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, dated April 13, 2016.

FY 2020 Congressional Budget Justification l 152

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date Non-power NRC-Rulemaking Production or 3150-48 Medium 2011- N/A 8/26/2009 10/2/2012 4/7/2016 3/30/2017 9/21/2018 3/18/2019 Actions Utilization Facility AI96 0087 License Renewal Reactor Vessel Material NRC-Rulemaking Surveillance 3150-49 Medium 2017- N/A 8/8/2014 N/A9 9/16/2019 12/13/2019 9/16/2020 12/15/2020 Actions Program AK07 0151 Requirements (Appendix H)

Receipts-Based NRC-Rulemaking 3150-50 Small Business Medium 2014- N/A N/A N/A N/A N/A N/A N/A Actions AJ51 Size Standards 0264 Revision to the NRC's NRC-Rulemaking 3150-51 Acquisition Medium 2014- N/A 6/1/2014 N/A 6/1/2019 7/1/2019 10/1/2019 11/1/2019 Actions AJ36 Regulation 0033 (NRCAR)

Revisions to Transportation Safety Requirements NRC-Rulemaking and Compatibility 3150-52 Medium 2016- N/A 8/19/2016 1/29/2019 6/30/2019 9/30/2019 6/30/2020 9/30/2020 Actions with International AJ85 0179 Atomic Energy Agency Transportation Standards Spent Fuel Cask Certificate of NRC-Rulemaking 53 Compliance Medium N/A 2014- PRM-72-7 N/A N/A N/A N/A N/A N/A Actions Format and 0067 Content NRC-Rulemaking Spent Fuel 3150-54 Medium 2015- N/A N/A 7/26/2021 7/26/2022 10/26/2023 7/26/2023 10/26/2024 Actions Reprocessing AJ53 0016 Updates and NRC-Rulemaking Clarifications on 3150-55 Medium 2014- N/A 9/1/2014 N/A 5/31/2019 8/31/2019 12/3/2019 3/4/2019 Actions the Export of AJ45 0201 Nuclear Material Alternatives to NRC-Rulemaking 3150-56 the Use of Credit Low 2017- N/A 9/1/2014 N/A N/A N/A 4/1/2020 8/1/2020 Actions AJ92 Ratings 0021 Requirement to NRC-Rulemaking Submit Complete PRM 57 Low N/A 2013- N/A N/A N/A N/A N/A N/A Actions and Accurate 107 0077 Information Update to Fees for Search and NRC-Rulemaking Review of 3150-58 Low 2017- N/A 6/12/2017 N/A 1/17/2019 3/29/2019 1/17/2019 3/29/2019 Actions Agency Records AK06 0144 by NRC Personnel10 9 The Commission is currently reviewing a staff proposal to expedite this rulemaking, and the NRC will publish a regulatory basis thereafter.

10 The NRC will conduct this action using a rulemaking process that allows the NRC to publish a direct final rule and a companion proposed rule in the same issue of the Federal Register.

FY 2020 Congressional Budget Justification l 153

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date Calculated NRC-Petition Maximum Fuel 59 N/A N/A 2009- PRM-50-93 N/A N/A N/A N/A N/A N/A Actions Element Cladding 0554 Temperature Calculated NRC-Petition Maximum Fuel 60 N/A N/A 2009- PRM-50-95 N/A N/A N/A N/A N/A N/A Actions Element Cladding 0554 Temperature Categorization of NRC-Petition the Licensee Fee 61 N/A N/A 2018- PRM-170-7 N/A N/A N/A N/A N/A N/A Actions Category for Full-0172 Cost Recovery Determining Which Structures, Systems, and NRC-Petition PRM 62 Components and N/A N/A 2015- N/A N/A N/A N/A N/A N/A Actions 112 Functions Are 0213 Important to Safety Elimination of Immediate NRC-Petition Notification PRM 63 N/A N/A 2018- N/A N/A N/A N/A N/A N/A Actions Requirements for 116 0201 Non-Emergency Events NRC-Petition Enhancing 64 N/A N/A 2011- PRM-50-99 N/A N/A N/A N/A N/A N/A Actions Reactor Safety 0189 Erik Erb NRC-Petition Minimum Day Off 65 N/A N/A 2010- PRM-26-6 N/A N/A N/A N/A N/A N/A Actions Requirement for 0310 Security Officers Fire Protection NRC-Petition PRM 66 Compensatory N/A N/A 2017- N/A N/A N/A N/A N/A N/A Actions 115 Measures 0132 Improved Identification Techniques NRC-Petition Against Alkali- PRM 67 N/A N/A 2014- N/A N/A N/A N/A N/A N/A Actions Silica Concrete 109 0257 Degradation at Nuclear Power Plants In-Core Temperature NRC-Petition PRM 68 Monitoring at N/A N/A 2015- N/A N/A N/A N/A N/A N/A Actions 111 Nuclear Power 0124 Plants Individual Monitoring NRC-Petition Devices for 69 N/A N/A 2016- PRM-34-7 N/A N/A N/A N/A N/A N/A Actions Industrial 0182 Radiographic Personnel Large Break Loss NRC-Petition of Coolant 70 N/A N/A 2002- PRM-50-75 N/A N/A N/A N/A N/A N/A Actions Accident 0018 Redefinition FY 2020 Congressional Budget Justification l 154

APPENDIX F:

SUMMARY

OF PLANNED RULEMAKING ACTIVITIES Regulatory Proposed Proposed Final Rule Final Associated Rulemaking Basis Rule to Rule to Rule Item CPR Docket PRM Initiation Publication Signature Publication Signature Publication

  1. Category Title Priority RIN ID Numbers Date Date Authority Date Authority Date Linear No-Threshold Model NRC-Petition 71 and Standards N/A N/A 2015- PRM-20-28 N/A N/A N/A N/A N/A N/A Actions for Protection 0057 against Radiation Linear No-Threshold Model NRC-Petition 72 and Standards N/A N/A 2015- PRM-20-29 N/A N/A N/A N/A N/A N/A Actions for Protection 0057 against Radiation Linear No-Threshold Model NRC-Petition 73 and Standards N/A N/A 2015- PRM-20-30 N/A N/A N/A N/A N/A N/A Actions for Protection 0057 against Radiation Measurement and Control of NRC-Petition PRM 74 Combustible Gas N/A N/A 2011- N/A N/A N/A N/A N/A N/A Actions 103 Generation and 0189 Dispersal Naturally-Occurring and NRC-Petition Accelerator-75 N/A N/A 2017- PRM-30-66 N/A N/A N/A N/A N/A N/A Actions Produced 0159 Radioactive Materials Nuclear Energy NRC-Petition Institute 76 N/A N/A 2010- PRM-26-5 N/A N/A N/A N/A N/A N/A Actions Fitness-for-Duty 0304 Programs Power Reactors NRC-Petition PRM 77 in Extended N/A N/A 2016- N/A N/A N/A N/A N/A N/A Actions 114 Shutdowns 0204 Professional Reactor Operator NRC-Petition 78 SocietyFitness- N/A N/A 2009- PRM-26-3 N/A N/A N/A N/A N/A N/A Actions for-Duty 0482 Programs Protection of Digital Computer NRC-Petition and 79 N/A N/A 2014- PRM-73-18 N/A N/A N/A N/A N/A N/A Actions Communication 0165 Systems and Networks Requirements for NRC-Petition the Indefinite 80 N/A N/A 2018- PRM-72-8 N/A N/A N/A N/A N/A N/A Actions Storage of Spent 0017 Nuclear Fuel Risk-Informed Categorization and Treatment of NRC-Petition Structures, PRM 81 N/A N/A 2015- N/A N/A N/A N/A N/A N/A Actions Systems, and 110 0028 Components for Nuclear Power Reactors FY 2020 Congressional Budget Justification l 155

APPENDIX G: OBLIGATIONS BY CONTROL POINT APPENDIX G: OBLIGATIONS BY CONTROL POINT The table below provides the status of the U.S. Nuclear Regulatory Commissions (NRCs) budget allowance and execution data by control points as of the end of fiscal year (FY) 2018 and the available prior-year carryover for allocation.

FY 2020 Congressional Budget Justification l 157

Nuclear Regulatory Commission Monthly Congressional Status Report As of September 30, 2018 (Dollars in Thousands)

Current Year Funds FY 2018 Explanatory Statement Carryover Current Year Current Year Current Year Current Year Prior Year 3

Enacted Carryover Total Reprogramming Current Plan Allocated Total Obligations Expenditures Unobligated Unliquidated Unliquidated Control Points Nuclear Reactor Safety (excludes Advanced Reactor 1,2 Regulatory Infrastructure Activities) $ 448,956 $ 7,699 $ 456,655 $0 $ 456,655 $0 $ 456,655 $ 452,176 $ 380,742 $ 4,479 $ 71,434 $ 21,756 Advanced Reactor Regulatory Infrastructure Activities 10,000 0 10,000 0 10,000 1,000 11,000 10,460 3,191 540 7,269 1,128 1,2 Nuclear Materials and Waste Safety 111,278 1,867 113,145 0 113,145 0 113,145 112,884 91,195 262 21,689 3,282 1,2 Decommissioning and Low-Level Waste 27,518 462 27,980 0 27,980 0 27,980 27,134 22,690 846 4,444 2,783 1

Corporate Support (excludes Office of the Commission) 290,556 1,301 291,857 0 291,857 0 291,857 291,706 179,646 151 112,060 41,916 Office of the Commission 5,829 3,671 9,500 0 9,500 0 9,500 4,737 4,715 4,763 22 0 1

Integrated University Program $ 15,000 $0 $ 15,000 $0 $ 15,000 $ 615 $ 15,615 $ 15,546 $ 95 $ 69 $ 15,452 $ 27,936 University Research and Development 10,000 0 10,000 0 10,000 606 10,606 10,596 69 10 10,527 19,279 Nuclear Science & Engineering Grant Program 5,000 0 5,000 0 5,000 9 5,009 4,950 25 59 4,925 8,658 Control Points Total $ 909,137 $ 15,000 $ 924,137 $0 $ 924,137 $ 1,615 $ 925,752 $ 914,643 $ 682,275 $ 11,109 $ 232,369 $ 98,801 Programs Nuclear Waste Fund 0 0 0 0 0 115 115 101 98 14 3 27 Office of Inspector General 11,728 0 11,728 0 11,728 605 12,333 12,076 10,868 257 1,207 142 OIG DNFSB 1,131 0 1,131 0 1,131 329 1,460 1,193 915 266 278 0 Total Agency $ 921,996 $ 15,000 $ 936,996 $0 $ 936,996 $ 2,664 $ 939,660 $ 928,014 $ 694,157 $ 11,646 $ 233,858 $ 98,970 FY 2020 Congressional Budget Justification l 158 Prior Year Unobligated Funds APPENDIX G: OBLIGATIONS BY CONTROL POINT Beginning Year to Date Total Carryover Available Funds Source Balance Deobligations Carryover Allocated Carryover Feebased $ 21,770 $ 9,408 $ 31,178 $ 11,329 $ 19,849 Special Purpose Funds $ 5,659 $ 735 $ 6,394 $ 5,286 $ 1,108 Advanced Reactor Regulatory Infrastructure Activities 1,071 (22) 1,049 1,000 49 Office of the Commission 3,671 13 3,684 3,671 13 General Fund 751 (4) 747 0 747 Integrated University Program 156 748 904 615 289 Official Representation Fund 10 0 10 0 10 4

USAID 0 0 0 0 0 Feebased & Special Purpose Funds Subtotal $ 27,429 $ 10,143 $ 37,572 $ 16,615 $ 20,957 Nuclear Waste Fund 532 0 532 115 417 Office of Inspector General 1,852 162 2,014 605 1,409 OIG DNFSB 329 1 329 329 1 Total Agency $ 30,142 $ 10,305 $ 40,448 $ 17,664 $ 22,784 Note: Numbers may not add due to rounding.

1 The five control points as identified in the FY 2018 Explanatory Statement.

2 International activities, $16,200K as identified in the FY 2018 NRC Salaries and Expenses appropriation, are part of the Nuclear Reactor Safety, Nuclear Materials and Waste Safety, and Decommissioning and Low-Level Waste control points. The NRC has obligated $15,520K and expended $12,931K of these funds. The unobligated balance is $680K and unliquidated obligations are $2,588K.

3 This does not include the $15,000K of carryover that was authorized for use by the FY 2018 Explanatory Statement.

4 The Consolidated Appropriations Act, 2018, P.L. 115-141, rescinded the $68K unobligated balance of funds transferred to NRC from USAID.

APPENDIX H: REPORT ON DRUG TESTING APPENDIX H: REPORT ON DRUG TESTING The U.S. Congress and the U.S. Department of Health and Human Services (HHS) initially approved the U.S. Nuclear Regulatory Commissions (NRCs) Drug Testing Program in August 1988, and the agency subsequently updated the program in November 1997. The NRC revised the program again and received approval from HHS on August 23, 2007. This report does not cover the NRCs drug testing requirements for the nuclear industry (licensees), as imposed by agency regulations, which is separate and distinct from this program. The NRCs Drug Testing Program, administered in accordance with Executive Order 12564, Drug-Free Federal Workplace, dated September 15, 1986, includes random, applicant, voluntary, follow-up, reasonable suspicion, and accident-related drug testing. The NRC initiated testing for nonbargaining-unit employees in November 1988, and in December 1990 for bargaining-unit employees, after negotiating an agreement with the National Treasury Employees Union. On August 25, 2008, the NRC expanded its testing program to include all NRC sensitive positions as designated for testing; therefore, all employees became subject to random drug testing.

During fiscal year (FY) 2018, the NRC conducted approximately 2,386 tests of all types. This resulted in three positive drug test results (one for marijuana, one for opiates and codeine, and one for oxycodeine) for three individuals. All occurrences were appropriately addressed by the agency.

The NRC also completed internal quality control reviews during FY 2018 to ensure that the agency continues to administer its Drug Testing Program in a fair, confidential, and effective manner.

The NRCs Drug Testing Program follows the principles and guidance contained in Executive Order 12564, Public Law 100-71, HHS guidelines, and Commission decisions.

FY 2020 Congressional Budget Justification l 159

This appendix provides the U.S. Nuclear Regulatory Commissions (NRCs) adjusted FY 2020 Congressional Budget Justification tables to include authorized prior-year carryover data. Consistent with NRCs FY 2019 Congressional Budget Execution Plan, research and licensing activities were funded with the use of authorized prior-year carryover within the Operating Reactors, Spent Fuel Storage and Transportation, Decommissioning and Low-Level Waste, and Corporate Support Business Lines.

Budget Authority and Full-Time Equivalents FY 2019 Total Budget Authority Comparison (Dollars in Millions)

(A) (B) (C) (D) = B + C (E) (F) = E - D FY 2018 Authorized FY 2019 FY 2019 FY 2020 Changes from Actuals Carryover Enacted Total Budget Request FY 2019 Total Authority Budget Authority Business Line/Major Program $M FTE $M FTE $M FTE $M FTE $M FTE $M FTE Operating Reactors 367.0 1,504.5 10.4 0.0 365.2 1,533.0 375.6 1,533.0 361.6 1,485.0 (14.0) (48.0)

New Reactors 95.7 381.2 0.0 0.0 94.1 386.0 94.1 386.0 87.8 339.0 (6.3) (47.0)

Nuclear Reactor Safety $462.6 1,885.7 $10.4 0.0 $459.4 1,919.0 $469.8 1,919.0 $449.5 1,824.0 $(20.3) (95.0)

Spent Fuel Storage and Transportation 26.0 96.6 2.4 0.0 22.5 100.0 24.8 100.0 24.2 101.0 (0.7) 1.0 Nuclear Materials Users 62.3 211.4 0.0 0.0 60.6 215.0 60.6 215.0 59.1 205.0 (1.4) (10.0)

Decommissioning and Low-Level Waste 27.1 107.5 0.6 0.0 24.8 104.0 25.4 104.0 22.9 93.0 (2.5) (11.0)

High-Level Waste 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 38.5 77.0 38.5 77.0 Fuel Facilities 24.6 107.0 0.0 0.0 23.2 96.0 23.2 96.0 21.0 88.0 (2.2) (8.0)

Nuclear Materials and Waste Safety $ 140.1 523.0 $2.9 0.0 $131.0 515.0 $134.0 515.0 $165.7 564.0 $31.7 49.0 Major Program Subtotal $602.8 2,408.6 13.3 0.0 $590.4 2,434.0 $603.7 2,434.0 $615.2 2,388.0 $11.4 (46.0)

Corporate Support 296.4 594.0 6.6 0.0 292.9 609.0 299.6 609.0 292.6 611.0 (7.0) 2.0 Integrated University Program 15.5 0.0 0.0 0.0 15.0 0.0 15.0 0.0 0.0 0.0 (15.0) 0.0 Subtotal $914.7 3,002.6 20.0 0.0 $898.4 3,043.0 $918.4 3,043.0 $907.8 2,999.0 $(10.7) (44.0)

Inspector General 13.3 60.8 0.0 0.0 12.6 63.0 12.6 63.0 13.3 63.0 0.7 0.0 Total $928.1 3,063.4 20.0 0.0 $911.0 3,106.0 $931.0 3,106.0 $921.1 3,062.0 $(10.0) (44.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

APPENDIX I: FY 2019 TOTAL BUDGET AUTHORITY COMPARISON FY 2020 Congressional Budget Justification l 161

Operating Reactors by Product Line FY 2019 Total Budget Authority Comparison (Dollars in Millions)

(A) (B) (C) (D) = B + C (E) (F) = E - D FY 2018 Authorized FY 2019 FY 2019 FY 2020 Changes from Actuals Carryover Enacted Total Budget Request FY 2019 Total Authority Budget Authority Product Line $M FTE $M FTE $M FTE $M FTE $M FTE $M FTE Event Response 14.4 47.0 0.0 0.0 18.0 48.0 18.0 48.0 16.9 45.0 (1.1) (3.0)

Generic Homeland Security 1.6 8.7 0.0 0.0 1.6 8.0 1.6 8.0 1.6 8.0 (0.0) 0.0 International Activities 3.4 19.0 0.0 0.0 3.6 19.0 3.6 19.0 3.4 18.0 (0.2) (1.0)

Licensing 75.1 384.6 0.0 0.0 82.6 376.0 82.6 376.0 78.3 372.0 (4.4) (4.0)

Oversight 112.6 498.2 0.0 0.0 114.2 536.0 114.2 536.0 115.5 520.0 1.3 (16.0)

Research 62.9 122.0 10.4 0.0 47.1 133.0 57.5 133.0 53.3 128.0 (4.2) (5.0)

Rulemaking 8.9 40.0 0.0 0.0 9.6 47.0 9.6 47.0 7.5 38.0 (2.1) (9.0)

Mission Support and FY 2020 Congressional Budget Justification l 162 Supervisors 67.2 362.4 0.0 0.0 65.2 340.0 65.2 340.0 63.4 330.0 (1.8) (10.0)

Training 8.1 22.6 0.0 0.0 8.9 26.0 8.9 26.0 8.7 26.0 (0.2) 0.0 Travel 12.9 0.0 0.0 0.0 14.3 0.0 14.3 0.0 13.0 0.0 (1.4) 0.0 Total $367.0 1,504.5 10.4 0.0 $365.2 1,533.0 $375.6 1,533.0 $361.6 1,485.0 $(14.0) (48.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

APPENDIX I: FY 2019 TOTAL BUDGET AUTHORITY COMPARISON

Spent Fuel Storage and Transportation by Product Line FY 2019 Total Budget Authority Comparison (Dollars in Millions)

(A) (B) (C) (D) = B + C (E) (F) = E - D FY 2018 Authorized FY 2019 FY 2019 FY 2020 Changes from Actuals Carryover Enacted Total Budget Request FY 2019 Total Authority Budget Authority Product Line $M FTE $M FTE $M FTE $M FTE $M FTE $M FTE International Activities 0.3 1.7 0.0 0.0 0.6 2.0 0.6 2.0 0.4 2.0 (0.2) 0.0 Licensing 15.5 56.9 2.4 0.0 13.7 62.0 16.1 62.0 15.5 62.0 (0.6) 0.0 Oversight 2.4 13.2 0.0 0.0 2.5 13.0 2.5 13.0 2.5 13.0 0.0 0.0 Research 1.7 1.9 0.0 0.0 1.0 2.0 1.0 2.0 1.1 3.0 0.1 1.0 Rulemaking 2.5 6.2 0.0 0.0 1.1 6.0 1.1 6.0 1.1 6.0 0.0 0.0 Mission Support and Supervisors 3.1 16.6 0.0 0.0 2.9 15.0 2.9 15.0 2.9 15.0 (0.0) 0.0 Training 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.0 0.0 Travel 0.5 0.0 0.0 0.0 0.6 0.0 0.6 0.0 0.6 0.0 (0.0) 0.0 Total $26.0 96.6 $2.4 0.0 $22.5 100.0 $24.8 100.0 $24.2 101.0 $(0.7) 1.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

FY 2020 Congressional Budget Justification l 163 APPENDIX I: FY 2019 TOTAL BUDGET AUTHORITY COMPARISON

Decommissioning and Low-Level Waste by Product Line FY 2019 Total Budget Authority Comparison (Dollars in Millions)

(A) (B) (C) (D) = B + C (E) (F) = E - D FY 2018 Authorized FY 2019 FY 2019 FY 2020 Changes from Actuals Carryover Enacted Total Budget Request FY 2019 Total Authority Budget Authority Product Line $M FTE $M FTE $M FTE $M FTE $M FTE $M FTE International Activities 0.6 3.2 0.0 0.0 1.2 6.0 1.2 6.0 0.8 4.0 (0.4) (2.0)

Licensing 14.4 56.1 0.6 0.0 11.6 49.0 12.2 49.0 11.1 43.0 (1.1) (6.0)

Oversight 5.4 25.0 0.0 0.0 5.4 25.0 5.4 25.0 5.1 24.0 (0.3) (1.0)

Research 1.3 2.0 0.0 0.0 0.5 1.0 0.5 1.0 0.5 1.0 (0.0) 0.0 Rulemaking 0.9 4.2 0.0 0.0 1.8 9.0 1.8 9.0 1.6 8.0 (0.2) (1.0)

Mission Support and Supervisors 3.3 17.0 0.0 0.0 2.6 14.0 2.6 14.0 2.4 13.0 (0.2) (1.0)

FY 2020 Congressional Budget Justification l 164 Training 0.7 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.6 0.0 (0.2) 0.0 Travel 0.6 0.0 0.0 0.0 0.9 0.0 0.9 0.0 0.7 0.0 (0.2) 0.0 Total $27.1 107.5 $0.6 0.0 $24.8 104.0 $25.4 104.0 $22.9 93.0 $(2.5) (11.0)

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

APPENDIX I: FY 2019 TOTAL BUDGET AUTHORITY COMPARISON

Corporate Support by Product Line FY 2019 Total Budget Authority Comparison (Dollars in Millions)

(A) (B) (C) (D) = B + C (E) (F) = E - D FY 2018 Authorized FY 2019 FY 2019 FY 2020 Changes from Actuals Carryover Enacted Total Budget Request FY 2019 Total Authority Budget Authority Product Line $M FTE $M FTE $M FTE $M FTE $M FTE $M FTE Acquisitions 14.6 51.2 0.0 0.0 15.6 54.0 15.6 54.0 15.2 51.0 (0.5) (3.0)

Administrative Services 89.8 73.6 4.0 0.0 85.5 76.0 89.5 76.0 89.3 78.0 (0.2) 2.0 Financial Management 34.0 99.9 0.0 0.0 32.2 99.0 32.2 99.0 29.7 96.0 (2.5) (3.0)

Human Resource Management 19.2 48.0 0.0 0.0 17.7 44.0 17.7 44.0 22.9 44.0 5.2 0.0 IT/IM Resources 107.4 179.1 2.6 0.0 104.9 174.0 107.6 174.0 97.9 179.0 (9.7) 5.0 Outreach 3.5 13.0 0.0 0.0 3.3 13.0 3.3 13.0 3.2 13.0 (0.1) 0.0 Policy Support 22.8 115.6 0.0 0.0 29.3 136.0 29.3 136.0 30.3 137.0 0.9 1.0 Training 5.2 13.6 0.0 0.0 4.3 13.0 4.3 13.0 4.2 13.0 (0.2) 0.0 Total $296.4 594.0 $6.6 0.0 $292.9 609.0 $299.6 609.0 $292.6 611.0 $(7.0) 2.0

$M includes FTE costs as well as contract support and travel. Numbers may not add due to rounding.

FY 2020 Congressional Budget Justification l 165 APPENDIX I: FY 2019 TOTAL BUDGET AUTHORITY COMPARISON

APPENDIX J: GLOSSARY APPENDIX J: GLOSSARY Actuals Obligations against budget authority for salaries and benefits, contract support, and travel.

Obligations are legally binding agreements that will result in an outlay of funds.

Agency Support Agency support costs are located in executive, administrative, and other support offices such as the Office of the Commission, the Office of the Secretary, the Office of the Executive Director for Operations, the Office of Congressional Affairs, the Office of Public Affairs, the Office of the Inspector General, the Office of Administration, the Office of the Chief Financial Officer, the Office of the Chief Information Officer, the Office of the Chief Human Capital Officer, and the Office of Small Business and Civil Rights. These budgeted costs administer the corporate or shared efforts that more broadly support the activities of the agency. These activities also include information technology services, human capital services, financial management, and administrative support.

Budget Authority Authority provided by law to incur financial obligations that will result in outlays. The U.S. Nuclear Regulatory Commission (NRC) budget authority is provided by appropriations and reimbursable budget authority. References to budget authority in this Congressional Budget Justification are to appropriations.

Corporate Support A set of centrally managed overhead activities that are necessary for the NRC staff and agency programs to achieve mission goals efficiently and effectively. It includes both general administrative overhead (e.g., facilities management, information technology, financial management, and human resource management) and agency policy support, including the Commission.

Full Cost Total resources used to produce outputs under a major program business line. The full cost of a business line is the sum of (1) the cost of direct resources within the business line, (2) the cost of mission-indirect resources within the business line, and (3) a proportional share of corporate support costs budgeted at the agency level.

Full-Time Equivalent Basic measure of the levels of employment used in the budget. It is the total number of hours worked (or to be worked) divided by the number of compensable hours applicable to each fiscal year.

Generic Homeland Security Security-related activities related to intergovernmental coordination and communication on intelligence, threat demographic data, and information security activities not related to information technology. Activities also include the coordination and exchange of information among local, State, and Federal agencies on security-related matters, as well as international activities involving reviews of security-related matters.

FY 2020 Congressional Budget Justification l 167

APPENDIX J: GLOSSARY Major Program An organized set of functions, processes, and activities directed toward execution of a major element of the agencys mission and the achievement of related strategic goals and objectives. The NRCs two major programs are Nuclear Reactor Safety and Nuclear Materials and Waste Safety.

Major Program Business Line (Business Line)

A class of functions, processes, and activities that implement a significant component of a major program. The Nuclear Reactor Safety Program is implemented through the Operating Reactors and New Reactors Business Lines. The Nuclear Materials and Waste Safety Program is implemented through the Fuel Facilities, Nuclear Materials Users, Decommissioning and Low-Level Waste, and Spent Fuel Storage and Transportation Business Lines.

Mission Support Supervisory and nonsupervisory support for the core work activities of the program offices and the regions. Budgeted within the major program business lines in the Mission Support and Supervisors Product Line.

Net Budget Authority (Net Appropriated)

The NRCs remaining budget authority after its appropriations are offset by fees collected.

Represents the portion of appropriations that are funded from the general fund of the U.S. Treasury and the Nuclear Waste Fund.

Nonfee-Recoverable Items NRC activities that are funded from appropriations excluded from fee recovery by 42 USC 2214 (Section 6101 of the Omnibus Budget Reconciliation Act of 1990) and NRC appropriations language.

Product Line Categories of agency work functions performed under a business line.

Reimbursable Budget Authority Budget authority provided by funds from other Federal agencies and receipts from non-Federal organizations. This authority represents additional funding in excess of the NRCs directly appropriated funds.

Salaries and Benefits Resources budgeted for the cost of government personnel. Includes salaries and wages; awards; the agency share of retirement contributions, benefits, and payroll taxes; and other personnel costs such as incentive and terminal leave payments.

FY 2020 Congressional Budget Justification l 168

APPENDIX K: ACRONYM LIST APPENDIX K: ACRONYM LIST 10 CFR: Title 10 of the Code of Federal Regulations ABWR: Advanced Boiling-Water Reactor AEC: Atomic Energy Commission AEA: Atomic Energy Act AIT: Augmented Inspection Team AO: Abnormal Occurrence AP: Advanced Passive APWR: Advanced-Pressurized Water Reactor APR: Advanced Power Reactor ASP: Accident Sequence Precursor CBJ: Congressional Budget Justification CISF: Consolidated Interim Storage Facility CoC: Certificate of Compliance COL: Combined License CRCPD: Conference of Radiation Control Program Directors DC: Design Certification DNFSB: Defense Nuclear Facilities Safety Board DOE: U.S. Department of Energy DOJ: U.S. Department of Justice EA: Environmental Assessment EDO: Executive Director for Operations EPR: Evolutionary Power Reactor ESP: Early Site Permit FEVS: Federal Employee Viewpoint Survey FY 2020 Congressional Budget Justification l 169

APPENDIX K: ACRONYM LIST FISMA: Federal Information Security Management Act FITARA: Federal Information Technology Acquisition Reform Act FTE: Full-Time Equivalent FY: Fiscal Year GL: Generic Letter GPRA: Government Performance and Results Act of 1993 HHS: U.S. Department of Human and Health Services HQ: Headquarters IAEA: International Atomic Energy Agency IM: Information Management IMC: Inspection Manual Chapter IMPEP: Integrated Materials Performance Evaluation Program IOAA: Independent Offices Appropriation Act of 1952 IRRS: Integrated Regulatory Review Service ISFSI: Interim Spent Fuel Storage Installation ISG: Interim Staff Guidance ISR: In situ recovery IT: Information Technology ITAAC: Inspections, Tests, Analyses, and Acceptance Criteria ITISS: IT Infrastructure Services and Support LER: Licensee Event Report LLW: Low-Level Waste LWR: Light-Water Reactor LLWR: Large Light-Water Reactor MBDBE: Mitigation of Beyond-Design-Basis Events MFFF: Mixed-Oxide Fuel Fabrication Facility FY 2020 Congressional Budget Justification l 170

APPENDIX K: ACRONYM LIST mSQP: Modified Small Quantities Protocol NMED: Nuclear Materials Event Database NMIP: Nuclear Materials Information Program NRC: Nuclear Regulatory Commission NSTS: National Source Tracking System NTTF: Near-Tear Task Force OBRA-90: Omnibus Budget Reconciliation Act of 1990 OIG: Office of the Inspector General OMB: Office of Management and Budget OPM: Office of Personnel Management PL: Public Law RIS: Regulatory Issue Summary ROP: Reactor Oversight Process S&E: Salaries and Expenses SLR: Subsequent License Renewal SMR: Small Modular Reactor SNF: Spent Nuclear Fuel SNM: Special Nuclear Material UMTRCA: Uranium Mill Tailings Radiation Control Act U.S.: United States USC: United States Code WBL: Web-Based Licensing WIR: Waste Incidental to Reprocessing FY 2020 Congressional Budget Justification l 171

United States Nuclear Regulatory Commission Office of the Chief Financial Officer NUREG-1100, Volume 35 March 2019

NUREG-1100, Vol. 35 CONGRESSIONAL BUDGET JUSTIFICATION FISCAL YEAR 2020 March 2019