ML20212J312

From kanterella
Revision as of 18:32, 13 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
First Partial Response to FOIA Request for Documents.App a Documents Encl & Being Released in Entirety
ML20212J312
Person / Time
Issue date: 09/28/1999
From: Reed C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Scitz D
AFFILIATION NOT ASSIGNED
Shared Package
ML20212J316 List:
References
FOIA-99-341 NUDOCS 9910050110
Download: ML20212J312 (3)


Text

NRC FORM 464 Part i U.S. NUCLEAR REGULATORY COMMISSION P UIAIPA RESPONSE NUMBER wm p #" %

S bdG 99-341 1

  1. RESPONSE TO FREEDOM OF I

-f INFORMATION ACT(FOIA)/ PRIVACY .ggSpg,fi;SE k *...+ ~~ / ACT (PA) REQUEST TYPE Y REQul6TER DALE Douglas II. Scitz D 2 8 1999 l PART l. -INFORMATION RELEASED No additional agency records subject to the request have been located.

Requested records are available through another public distribution program. See Comments section.

APPENDICES Agency records subject to the request that are identified in the listed appendices are already available for

~_

public inspection and copying at the NRC Public Document Room.

APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for A public inspection and copying at the NRC Public Document Room.

Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room 2120 L Street, NW, Washington, DC.

Tf APPENDICES Agency records subject to the request are enclosed.

A Records subject to the request that contain information originated by or of interest to another Federal agency have been l referred to that agency (see comments section) for a disclosure determination and direct response to you.

l g We are continuing to process your request.

See Comments.

PART l.A - FEES I AMOUNT

  • You will be billed by NRC for the amount listed. None. Minimum fee threshold not met.

I You will receive a refund for the amount listed. Fees waived

  • sgegnts PART 1.B -INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE No agency records subject to the request have been located.

Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II.

This determination may be appealed within 30 days by writing to the FOIA/PA Officer. U S Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."

l PART 1.C COMMENTS (Use attached Comments continuation page if required)

O

/

Dbl I

9910050110 990928 PDR FOIA SCITZ99-341 PDR ,

WUNAIUHL F RL L UVM Ut INF UNMAllVN Ayl AN VHWAu Aa I Ut f Ok H p Carot Ann Reed ( gJg /[ct,/ /

PRINTED oN RECYCLED PAPER Th,s form was des.gned using informs NRC F ORM 464 Part 1 (61998)

I J

1

/

P .

Re: FOIA-99-341 APPENDIX A RECORDS HEING RELEASED IN TIIEIR ENTIRETY (If copyrighted identify with *)

NO. DATE DESCRIIrrlON/(PAGE COUNT)

1. Undated Quotation for Small Purchases Sheet (1 page)
2. 7/28/98 E-mail from Robert Webber to Elinor Cunningham (EMC3) subject Engineering Requirement (1 page)
3. 7/'8/98 E-mail from Robert Webber to Elinor Cunningham (EMC3) subject Engineering Requirement (1 page)
4. 7/29/98 E-mail from Robert Webber to Elinor Cunningham (EMC3) subject OWFN Exterior Project (1 page)
5. 8/3/98 Ltr to Robert Webber from GSA re Delegation of Contract Authority (2 pages)
6. 8/3/98 Telecopy Transmittal to Soo Koh, GNM & Associates re Request for Quotation (10 pages)
7. 8/6/98 Conference Room Scheduling System (l page)
8. 8/16/98 GNM Facsimile Transmittal Sheet with fee proposal (2 pages)
9. 9/9/98 Ltr to Robert Webber from GSA re Delegation of Contract Authority (l page) 10, 9/10/98 GNM Facsimile Transmittal Sheet with Best and Final fee proposal (2 pages)
11. 9/14/99 Purchase / Delivery Order to GNM & Associates, Inc. re: GSA Contract with Statement of Work (16 pages)
12. 9/14/98 GNM & Associates,inc. Minutes of Meeting Re Build marble Inspection (2 pages)
13. 9/30/98 Note to: Warren Donarski, GNM & Associates, Inc. from James I heck, NRC re OWFN Marble Inspection Project-DR-98-0242 -

Schedule and Testing Procedures (l page)

r 1

l l

14. 10/30/98 llandwritten Not re: Site Inspernon O pyc)

! 15. 3/5/99 Transmittal of Invoice for Gooch/ Services Rendered to James licek (3 pages) l

16. 4/8/99 Facsimile Transmittal Sheet with Comments on Draft Report OWFN Limited Survey of the Facade Panels (5 pages)
17. 8/17/99 Telecopy Transmittal to Angela Johnson, GSA from Elinor Cunningham subject: NRC Delivery Order /GSA Number (3 pages)
18. 8/16/99 Facsimile Transmittal to Bob Webber from GS A re OWFN marble Fac/Insp with attached FOIA letter (various letters from Scaldara &

Potler, LLP) (6 pages) l l

19. I1/5/98 Paid lavoice DR-98-0242 - GNM & Associates, Inc. (2 pages) l
20. I1/23/98 Paid Invoice DR-98-0241 - GNM & Associates, Inc. (2 pages)
21. 3/2/99 Disputed Invoice DR-98-0241 - GNM & Associates, Inc. (2 pages)  !
22. 3/2/99 Disputed Invoice DR-98-0242 - GNM & Associates, Inc. (2 pages) l l

I

,