TAC:61289
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Withdrawn, Closed | |
Results Other: ML20137X779, ML20141C714, ML20155J950, ML20195F006, ML20198A135, ML20198A160, ML20205T630, ML20207C679, ML20215C215 | |
From | |
MONTHYEARML20137X7791986-02-28028 February 1986
[table view]Confirmatory Action Ltr Re 860228 Telcon W/Jw Lynch Outlining Listed Actions to Be Taken to Assure Operability of Reactor Control Room Emergency Ventilation Sys,Per Tech Specs & GDC 19 ML20141C7141986-03-21021 March 1986 Notice of Deviation from Insp on 860128-30 & 0224-28 ML20197F2511986-05-0707 May 1986 Forwards Request for Addl Info Re Control Room Habitability. Control Room Ventilation Sys Functioning Inconsistent W/Tmi Action Plan Item III.D.3.4 or Updated FSAR ML20198A1351986-05-14014 May 1986 Discusses Insp on 860128-30 & 0224-28 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty.Violation Involves Licensee Failure to Maintain Control Room Emergency Ventilation Sys in Operable Status ML20198A1601986-05-14014 May 1986 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $80,000.Violation Noted:Control Room Emergency Ventilation Sys Inoperable & Not Independent Due to Excessive Makeup Flow Rate in Train CB-1B ML20155J9501986-05-19019 May 1986 Forwards Addl Info Re Adequacy of Control Room Emergency Ventilation Sys & Control Room Habitability,Per Tl Chan 860507 Concerns.Complete Reanalysis of NUREG-0737,III.D.3.4 Requirements Will Be Completed Prior to Startup ML20195F0061986-06-0404 June 1986 Forwards Revised Dose Calculation Analysis & Schedule for Completion of Control Room Emergency Ventilation Sys & Revised CB-1 Action Plan,Per 860528 Request ML20205T6301986-06-13013 June 1986 Forwards Revised CB-1 Action Plan,Control Room Pressurization Test Results & Summary of Control Bldg HVAC Operation,Per 860609 Telcon Re Control Room Emergency Ventilation IR 05000344/19860211986-06-13013 June 1986 Insp Rept 50-344/86-21 on 860522-0606.No Violations or Deviations Noted.Major Areas Inspected:Activities Re Periodic Containment Integrated Leak Rate Test,Including Review of Procedures & Personnel Interviews IR 05000344/19860271986-07-14014 July 1986 Enforcement Conference Rept 50-344/86-27 on 860709.Major Areas Discussed:Apparent Violation Noted During Special Insp of QC Activities (Insp Rept 50-344/86-24) ML20212K5131986-08-14014 August 1986 Notice of Withdrawal of Portions of 850419 Application for Amend to License NPF-1,revising Tech Specs to Permit Performance of Surveillance Testing of Control Room Emergency Ventilation Sys ML20212K5051986-08-14014 August 1986 Forwards Notice of Withdrawal of Portions of 850419 Application for Amend to License NPF-1,per Util 860714 Request ML20214Q8211986-09-19019 September 1986 Summary of 860528 Meeting W/Util & Bechtel in Bethesda,Md Re Control Room Emergency Ventilation Sys,Per TMI Action Item III.D.3.4 on Control Room Habitability.List of Attendees Encl ML20215C2151986-09-30030 September 1986 Forwards Revised Toxic Gas Analysis Re NUREG-0737,III.D.3.4, Control Room Habitability, Justifying Deletion of Ammonia & Sulfur Dioxide Detectors.Implementation Plan for Design Changes & Related Info Encl ML20207C6791986-12-24024 December 1986 Requests Expedited Review & Approval of Control Room Emergency Ventilation Sys (CB-1) Testing Changes Requested in Re TMI Action Item III.D.3.4, Control Room Habitability. Control Room Cooling Design Change Described 1986-05-07 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:61289&oldid=3239728"