ML20216C435

From kanterella
Revision as of 08:50, 6 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 980527 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Diesel Generator Failure & HPCI Exhaust Valve Failure & RHR Min Flow Valve Failure Predecisional Enforcement Conference
ML20216C435
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/15/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
98-37, NUDOCS 9805190260
Download: ML20216C435 (2)


Text

,

,s...

No. 98-37 April 15,1998 U.S. NUCLEAR REGULATORY COMMISSION REGION I

' NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: PECO Energy Company ,

l Facility: Limerick Nuclear Generating Station Docket Nos.: 50-352/50-353 Date and Time: 10:00 a.m., Wednesday, May 27,1998 Location: US NRC Region 1 Office Public Meeting Room King of Prussia, PA 19406

Purpose:

Discuss: Diesel Generator Failure and HPCI Exhaust Valve Failure, l RHR Minimum Flow Valve Failure Predecisional Enforcement Conference NRC Attendees: C. W. Hehl Nrector, Division of Reactor Projects (DRP)

C. Ande(sun, Chief. Project Branch No. 4, DRP A. Burritt, Senior Resident inspector, Limerick, DRP D. Florek, Project Engineer, Branch No. 4, DRP Licensee Attendees: D. M. Smith, President, PECO Nuclear G. Rainey, Senior Vice President, Nuclear Operations, PECO Nuclear J. Von Suskil, Vice President, Limerick Generating Station R. Boyce, Plant Manager, Limerick NOTE: This meeting is open to the public. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known to Clifford Anderson, at (610) 337-5227 by May 23,1998.

Original Signed By:

Approved by:

Clifford J. Anderson, Chief Projects Branch 4 Division of Reactor Projects 9805190260 980415 PDR ADOCK 05000352

\D O h

/.

a

' )

2' Distribution: (Via E-Mail)

L. Callan, Executive Director for Operations, OEDO H. Thompson, Deputy Executive Director for Regulatory Programs E. Jordon, Deputy Executive Director for Regulatory Effectiveness, Program Oversight, Investigations, and Enforcement, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation (NRR)

J. Lieberman, Director, Office of Enforcement T. Martin, Director, Division of Reactor Program Management, NRR D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD  ;

D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR R. Zimmerman, Associate Director for Projects, NRR R. Capra, Director, Division of Reactor Projects - 1/11, NRR N. Green, Jr., Policy Development & Technical Support Branch l B. McCabe, Regional Coordinator, OEDO '

M. Thadani, PM, NRR B. Buckley, PD l-2, NRR D. Screnci, Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA M. Campion, ORA Distribution:

PUBLIC D.M. Smith, PECO Energy State of Pennsylvania RA Secretary, Rl DRA Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: G:\ BRANCH 4\ LIM 0527 To receh,e e copy of this document, indicate In the bos: 'C' = Copy without attechment/ enclosure 'E' = Copy with attachment / enclosure "N' = No copy OFFICE Rl:DRP , l l l NAME CAn,derson g\h DATE 4/ if/98 5 OFFICIAL RECORD COPY l