Summarizes 790603 Telcon W/C Willis Re Technical Organizations & Consultants Working for Philippines Atomic Energy Commission & Licensee on Seismic & Volcanic Questions of Bataan Nuclear Power Plant
ML20247Q558
Person / Time
Issue date: 06/06/1979
From: Lafleur J
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To:
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
Shared Package
ML20247Q547 List:
References
FOIA-89-99 NUDOCS 8904070160
Download: ML20247Q558 (1)


Text

_

s 4

~

f, - i n

[pu UNITED STATES

[ \ g j NUCLEAR REGULATORY COMMisslON

=

E=

MEMORANDUM TO THE FILES

@s FROM: Joseph D. Lafleur, Jr., Deputy Director ME Office of International Programs 52, .

==

~

SUBJECT:

JUNE 3 TELEPHONE CONVERSATION WITH CHARLES WILLIS, NRC-IAEA ADVISOR TO PHILIPPINES AEC  :==

5..

. About 11:00 p.m., June 3. I called Charles Willis, the NRC-nominated IAEA 5 Safety Advisor to the Philippines Atomic Energy Commission (PAEC), to ask E=i him about the technical organizations and consultants who are working for is" the PAEC and its licensee on the seismic and volcanic questions of the  :==

Bataan Nuclear Power Plant, and to ask for more information on the Environ-mental Report" mentioned in our telecon of May 28. The following is a -  :+

summary of the conversation: :s

=

~

1. Advisors and Consultants
a. Most of the technical analysis is still being done for NPC by EBASCO. One exception has been the trenching to study the geologic strata

[

near the reactor. That work was done by the NPC itself.  ::'.

b. PAEC has used two local geology consultants, Dr. Henedo, Professor e=

of the University of the Philippines, and Dr. Menoza, who is an official of _

the equivalent of the USGS or US Weather Service organization, the acronym of which sounds like "PAGASA." Willis will attempt to send me a summary of the effort expended.

[=F

2. Environmental Report

=

The completed parts fill seven three-inch looseleaf books. Willis said =

he would advise whether th13 report is publicly available and whether he ll=

can send me a copy. (He sent me a telegram dated June 4, saying "PNPP-1 Environmental Report considered public document. Copy will be sent upon ==

receipt by PAEC of cable requesting it." I am preparing a cable requesting i t. ) The three uncompleted sections, mentioned on May 28, will be completed in November, after final decisions affecting them have been made (e.g., .. .E. . .

selection of the biocides to be used to keep the condenser coolant. system E' clean. i=

==

Jo e D. fleur, Jr. , Deputy Director T.== .

O ice of International Programs 22 CC: JRShea, IP E MPeterson, IP HSchechter, IP .

8904070160 890404 '