ML20247Q558
ML20247Q558 | |
Person / Time | |
---|---|
Issue date: | 06/06/1979 |
From: | Lafleur J NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP) |
To: | NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP) |
Shared Package | |
ML20247Q547 | List: |
References | |
FOIA-89-99 NUDOCS 8904070160 | |
Download: ML20247Q558 (1) | |
Text
_
s 4
~
f, - i n
[pu UNITED STATES
[ \ g j NUCLEAR REGULATORY COMMisslON
- WASHINGTON, D. C. 20555 s.,*****,@ JUN 6 1979-
=
E=
MEMORANDUM TO THE FILES
@s FROM: Joseph D. Lafleur, Jr., Deputy Director ME Office of International Programs 52, .
==
~
SUBJECT:
JUNE 3 TELEPHONE CONVERSATION WITH CHARLES WILLIS, NRC-IAEA ADVISOR TO PHILIPPINES AEC :==
5..
. About 11:00 p.m., June 3. I called Charles Willis, the NRC-nominated IAEA 5 Safety Advisor to the Philippines Atomic Energy Commission (PAEC), to ask E=i him about the technical organizations and consultants who are working for is" the PAEC and its licensee on the seismic and volcanic questions of the :==
Bataan Nuclear Power Plant, and to ask for more information on the Environ-mental Report" mentioned in our telecon of May 28. The following is a - :+
summary of the conversation: :s
=
~
- 1. Advisors and Consultants
- a. Most of the technical analysis is still being done for NPC by EBASCO. One exception has been the trenching to study the geologic strata
[
near the reactor. That work was done by the NPC itself. ::'.
- b. PAEC has used two local geology consultants, Dr. Henedo, Professor e=
of the University of the Philippines, and Dr. Menoza, who is an official of _
the equivalent of the USGS or US Weather Service organization, the acronym of which sounds like "PAGASA." Willis will attempt to send me a summary of the effort expended.
[=F
- 2. Environmental Report
=
The completed parts fill seven three-inch looseleaf books. Willis said =
he would advise whether th13 report is publicly available and whether he ll=
can send me a copy. (He sent me a telegram dated June 4, saying "PNPP-1 Environmental Report considered public document. Copy will be sent upon ==
receipt by PAEC of cable requesting it." I am preparing a cable requesting i t. ) The three uncompleted sections, mentioned on May 28, will be completed in November, after final decisions affecting them have been made (e.g., .. .E. . .
selection of the biocides to be used to keep the condenser coolant. system E' clean. i=
==
Jo e D. fleur, Jr. , Deputy Director T.== .
O ice of International Programs 22 CC: JRShea, IP E MPeterson, IP HSchechter, IP .
8904070160 890404 '
TS 9-99 PDR