Summarizes 790603 Telcon W/C Willis Re Technical Organizations & Consultants Working for Philippines Atomic Energy Commission & Licensee on Seismic & Volcanic Questions of Bataan Nuclear Power Plant
ML20247Q558
Person / Time
Issue date: 06/06/1979
From: Lafleur J
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To:
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
Shared Package
ML20247Q547 List:
References
FOIA-89-99 NUDOCS 8904070160
Download: ML20247Q558 (1)


Text

_

s 4

~

f, -

i

[pun UNITED STATES

[ \\ g j NUCLEAR REGULATORY COMMisslON WASHINGTON, D. C. 20555 s.,*****,@

=

JUN 6 1979-E=

@s MEMORANDUM TO THE FILES FROM:

Joseph D. Lafleur, Jr., Deputy Director ME Office of International Programs 52,.

==

~

SUBJECT:

JUNE 3 TELEPHONE CONVERSATION WITH CHARLES WILLIS, NRC-IAEA ADVISOR TO PHILIPPINES AEC

==

5..

About 11:00 p.m., June 3. I called Charles Willis, the NRC-nominated IAEA 5

Safety Advisor to the Philippines Atomic Energy Commission (PAEC), to ask E=i him about the technical organizations and consultants who are working for is" the PAEC and its licensee on the seismic and volcanic questions of the

==

Bataan Nuclear Power Plant, and to ask for more information on the Environ-mental Report" mentioned in our telecon of May 28. The following is a -

+

summary of the conversation:

s

=

1.

Advisors and Consultants

~

a.

Most of the technical analysis is still being done for NPC by

[

EBASCO. One exception has been the trenching to study the geologic strata near the reactor. That work was done by the NPC itself.

b.

PAEC has used two local geology consultants, Dr. Henedo, Professor e=

of the University of the Philippines, and Dr. Menoza, who is an official of the equivalent of the USGS or US Weather Service organization, the acronym of which sounds like "PAGASA." Willis will attempt to send me a summary of the effort expended.

[=F 2.

Environmental Report

=

The completed parts fill seven three-inch looseleaf books. Willis said

=

he would advise whether th13 report is publicly available and whether he ll=

can send me a copy.

(He sent me a telegram dated June 4, saying "PNPP-1 Environmental Report considered public document.

Copy will be sent upon

==

receipt by PAEC of cable requesting it."

I am preparing a cable requesting i t. )

The three uncompleted sections, mentioned on May 28, will be completed in November, after final decisions affecting them have been made (e.g.,

...E...

selection of the biocides to be used to keep the condenser coolant. system E'

clean.

i=

==

Jo e D.

fleur, Jr., Deputy Director T.==.

O ice of International Programs 22 CC: JRShea, IP E

MPeterson, IP HSchechter, IP 8904070160 890404 TS 9-99 PDR

'