05000440/FIN-2016004-02

From kanterella
Revision as of 19:55, 20 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
02
Site: Perry FirstEnergy icon.png
Report IR 05000440/2016004 Section 1R18
Date counted Dec 31, 2016 (2016Q4)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.18
Inspectors (proximate) A Dahbur
G Hansen
J Cameron
J Nance
J Robbins
M Bielby
M Doyle
M Jones
M Marshfield
N Feliz-Adorno
R Baker
R Ng
S Bell
T Briley
V Petrella
Violation of: 10 CFR 50.59
CCA H.8, Procedure Adherence
INPO aspect WP.4
'