Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer NotesML20237A166 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
06/21/1986 |
---|
From: |
Hendrie J AFFILIATION NOT ASSIGNED |
---|
To: |
|
---|
References |
---|
CON-#487-5039 2.206, NUDOCS 8712140304 |
Download: ML20237A166 (1) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20202B5081999-01-0808 January 1999 Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20217H3291998-02-23023 February 1998 Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit ML20202B4981997-12-22022 December 1997 Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20203A1231997-12-18018 December 1997 Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows ML20203A1111997-11-21021 November 1997 Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca ML20148T5101997-04-11011 April 1997 Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20137W2901997-04-11011 April 1997 Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20133N6071996-03-20020 March 1996 Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20141D2521996-01-19019 January 1996 Rev 4 to PS-79, EDG Loading ML20249B4451996-01-0404 January 1996 Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation ML20249B4461996-01-0404 January 1996 Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation ML20092G9381995-06-29029 June 1995 Scram Times for Tech Spec 3.3.C.1 ML20117K8601994-01-31031 January 1994 Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station ML20249B4731994-01-0808 January 1994 Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 ML20249B4661993-11-0808 November 1993 Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 ML20249B4811993-11-0606 November 1993 Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 ML20249B4541993-10-25025 October 1993 Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 ML20058P2211993-07-29029 July 1993 Package Consisting of Attachment to Employee Concerns Programs ML20117K8511993-06-30030 June 1993 Ipeee,Building Structures Fragility Analysis. Rev 1 ML20065L7941993-06-0404 June 1993 Reactor Building Seismic Model ML20064K8411993-01-26026 January 1993 Soil Properties for SSI Analysis for Pilgrim Site ML20099B5521992-05-0505 May 1992 Audit 92050S, Scientific Ecology Group Supplier Implementation & Qualification, Conducted on 920324-27 ML20118A3561992-03-24024 March 1992 Scientific Ecology Group,Supplier Implementation & Qualification Audit 92050S ML20086T2241991-12-19019 December 1991 Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment ML20079M9561991-11-11011 November 1991 Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions ML20011F4471990-01-19019 January 1990 Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. ML20011F4721990-01-19019 January 1990 Operability Evaluation of Salt Svc Water Pump Columns. ML20079M9811989-12-31031 December 1989 Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 ML20106A6371989-03-0303 March 1989 Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra ML20151W1811988-08-16016 August 1988 Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys ML20238E6921987-12-30030 December 1987 Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods ML20236R0801987-11-18018 November 1987 Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime ML20236N8471987-11-12012 November 1987 Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests ML20236Y6151987-11-0505 November 1987 News Article Re Shutdown of Facility for Six More Wks to Deal W/Mgt Troubles ML20237A1151987-11-0505 November 1987 FSAR Section 5, Containment ML20236K8561987-07-22022 July 1987 Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams ML20236Y6171987-07-0909 July 1987 Newsarticle Entitled, Judges Asked to Limit Pilgrim Picketing ML20237A0171986-06-28028 June 1986 Newsarticle Entitled, Two Towns Want Out of Pilgrim Evacuation Plan ML20237A0551986-06-27027 June 1986 Newsarticle Entitled, Dept of Public Utils Blasts Edison, Cites 'Paralysis' at Top ML20237A0461986-06-24024 June 1986 News Article Entitled, Edison Says Pilgrim Missed Another Deadline for Safety Tests ML20237A1661986-06-21021 June 1986 Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes ML20237A0211986-06-0909 June 1986 Portions of Vol 8,Number 12 to Inside NRC Re Denton Urging Industry to Settle Doubts About Mark I Containments ML20237A0441986-05-26026 May 1986 News Article Re Chernobyl Accident & Difference Between Us & Soviet Plants ML20237A1961986-05-23023 May 1986 Newsarticle Entitled, Pilgrim on List of Worst-Run Nuclear Units ML20237A0511986-05-21021 May 1986 News Article Discussing NRC Announcement That Facility Will Remain Closed Until Util Corrects Safety Problems ML20236N0881986-05-19019 May 1986 Viewgraphs from 860519 Meeting Re Util Response to Confirmatory Action Ltr CAL-86-10,860612 Program for Excellence Task Force Rept & Facility Operation ML20235S1511986-04-25025 April 1986 Preliminary Critical Path Projection for RF07 ML20207G2661986-04-19019 April 1986 Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 ML20236K2221986-04-12012 April 1986 Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 ML20237A1981985-06-18018 June 1985 Newsarticle Entitled, NRC Says Pilgrim Skipped Routine Tests 1999-01-08
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20058P2211993-07-29029 July 1993 Package Consisting of Attachment to Employee Concerns Programs ML20079M9561991-11-11011 November 1991 Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions ML20079M9811989-12-31031 December 1989 Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 ML20151W1811988-08-16016 August 1988 Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys ML20238E6921987-12-30030 December 1987 Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods ML20236R0801987-11-18018 November 1987 Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime ML20236N8471987-11-12012 November 1987 Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests ML20237A1151987-11-0505 November 1987 FSAR Section 5, Containment ML20237A1661986-06-21021 June 1986 Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes ML20235S1511986-04-25025 April 1986 Preliminary Critical Path Projection for RF07 ML20207G2661986-04-19019 April 1986 Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 ML20236K2221986-04-12012 April 1986 Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20245C8261985-03-29029 March 1985 Package Consisting of Rev 0 to Safety Evaluation SE-1806 Re Analog Trip Sys for Reactor Protection Sys & ECCS at Plant, App C,Rev 0 to PDC-84-70, Analog Trip Sys for Reactor Protection Sys & ECCS at Pilgrim Station & 870917 Ofc Memo 1993-07-29
[Table view] |
Text
- - -_
'ql g - g._ use.
.g g 5 P7 35 f0N . .
I
- - \s, '
d .
re wu - . .
p
_ . ~ . . . .
y i
lpharges of Nuclear. Cover-Up and Collusion lHav
.ee,ewg. M Ms.ohhu.H.c.. arse.nege s. I B.Mrs .1
'. w*to a fes,ageadvertiseenes . s.+ earnealttaes of Ceepen were viges* . beWante etwas aptit1Mut.
wif.hahed she,ges ed
gi 1 noMay 14, Destel Ford sad Rehert Fellard"* 4maly irrveenigattag the metter, ear.'"My d servues , ohn j resurrected = eeme 14.yeareM *.netas ' Hanauer wrote see:optolenisthatdesigesteeludespres>
tir d, !x AgF7) havestigaties ende g J that Isephen Hanneer and I wrote J- comenismesse see to
, . when we were as the Alamic Energy ea L. d, becomes we haee eder as the a=r=ama=
theshargesenddrgped theabatter, tiend as 3 th4==lan's regulatory staff.iney ; he licensequate saurance of their safety.TMs . Dese resuales,temever. 4 try to drew.aisalaarkles between the 4 lk>
'N
- . eral1snestree Chersebyl amelear teacson' and Gesc was uses.in. the testassempenduesessert,eswetias alas staalany aplatam scenereedmasp om in ef1373. My 5
( po "N tusenere ~and^ wara,* to agra was that es prevolved la meren desigue essand, e resendtsjgitin there is a calamity in the making at deamesett a m 21
'. *aer own meesear plaats." ney enalm^ talance, not.thewent N.R.C.*e the seers emsources that we
.;' .'ll 3
S
' the notes pictered in esir ad show that quired to reanive these. I hoped to la hrtet, these esseensteal eberges.
[y j Ar* Mr. Ranauer wanted ta han the G.E. elldt a study of caste and husente he . af esper.ep and eeunalen, eseglo and'
,.- -- . _ _ - reactarwammin. aufnciet depth to aurahaank ediater tampamens elsestases wers,bpJg',ege, s' 8 NM mort M hecanes it had " urgent my intuition was correct." esposed as tales and have as more safety problems" and thatI r... z*
P,L,M,
., such a han to save nuclear power.
no outesase et all the inquirieg merit today. It le a measure e(the in.
and investigating of these internal. y .E'/
gg Stuff and nonsenes. Mr. Hanauer titled his note "an idea te kick around" memorandums and Pouard the have related facts . t=Hamat j i
@h c am end' and addressed it es the heads of thema)er regensaary to neveha the tregic less.
does at Chernehyl to spies My their.
stagJestruotSces.M.Hagemeus I was . a
Georgel depetydirectorof ansof theseaffacess mittees were net notably friendly ta. puch. J f 9 ergency[ it wasn't may prerogative to han er not, a ies Bebert1.17'aspKises
. w t i Countyi , Mr. Hanneer's " idea te kicit around*' . the Nuclear Regulatary Caram ss '
'feV :
was that it was more trouble than it 0 .
eopera. reJJ .an ty, signal." was worth to work out the review issume in the O.B. containments, and W ASHINGTON. O C 20005 p
and that the Concept ought to be dleccuraged. I 5
j the Cor* Other thought we thould het rem a CcDialD. ^ F ront Edit p g, peg, $
III A.euca mort system just because it was p,g, --
L' a harder to review and required more -
ramcy#.rt r plaat . tan .ffort. it a tha und of issue JUN 2 1 m '
? analysis and study that a good staff *lD Y0E . ..Y. 4 Lg ought to do, and it was being done here.
that .'the TU83 lay My view, than and eince. has been that preneure.euppressla contain.
9 1, ,- 2,0 $j , ;
t thwit(teld crith. mente prvvide. adequate safety if S-i. W ./20 , ;
broperly deelsned and built. I think
{d netw a
- r. Hanamora view is touch the p v. name. -ga i haven i a.ked Mm g gm;& ,, recently. In tr78, when Mr. Ford and t the coin Mr. Pounsd nudo thj same son W {
lo;notfunc{, l g M.A ---,. h1 ;
D 8712140304 860621 PDR ADOCK 05000293 P PDR s
r