Finding | |
---|---|
Title | Failure to Perform Examinations of Reactor Pressure Vessel Supports |
Description | The inspectors identified a non-cited violation (NCV) of Code of Federal Regulation (CFR) 10 CFR Part 50.55a, Codes and Standards, involving the licensees failure to include the reactor pressure vessel supports in the scope of the V. C. Summer Inservice Inspection Program (ISI) program. 10 CFR 50.55a requires that licensees develop an Inservice Inspection (ISI) program and update that program every 10 years in accordance with the approved edition of American Society of Mechanical Engineers (ASME)Section XI in effect 12 months prior to the beginning of the 10 year interval. The inspectors identified that the nuclear Class 1 reactor pressure vessel supports were not included in the scope of the V. C. Summer Unit 1 ISI Program for the third interval. The licensees ISI program was prepared in accordance with the 1998 Edition of the ASME Section XI Code, with addenda through 2000, as modified by 10 CFR 50.55a. As required by Article IWF 1000, Table 2500-1, Examination Category Item Number F1.40, the Reactor Pressure Vessel (RPV) supports are required to be periodically VT-3 visually examined. Also as required by Subsection IWB of Section XI, Table IWB-2500- 1, Examination Category B-K, Item No. B10.10, the support integral attachment weld is to be periodically subjected to a surface examination. This issue was entered into the licensees corrective action program as Condition Report (CR) 13-00138 and CR-13- 00737. The licensee took action and performed an operability determination and conducted remote visual examinations to assess the condition of the reactor vessel supports. The failure to include the RPV supports in the scope of the ISI program and the failure to conduct the required examinations was a performance deficiency that was within the ability of the licensee to foresee and correct. This finding was of more than minor significance because it was associated with the Design Control attribute of the Barrier Integrity Cornerstone and affected the cornerstone objective of providing reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, examinations of the RPV supports provide assurance that the structural boundary of the reactor coolant system remains capable of performing its intended safety function. The inspectors used IMC 0609, Significance Determination Process, Attachment 0609.04, Phase 1 Initial Screening and Characterization of Findings, and determined that the finding was of low safety significance (Green) because it did not represent an actual failure of the RPV supports. The cause of the finding involved the cross-cutting area of problem identification and resolution, the component of operating experience (OE), and the aspect of implements and institutionalizes OE through changes to station process, procedures and programs, P.2(b). Specifically, the licensee failed to implement and institutionalize OE for RPV supports into station processes and procedures |
Site: | Summer |
---|---|
Report | IR 05000395/2013002 Section 4OA5 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | J Reece G Mccoy M Coursey C Fletcher E Coffman R Williams |
Violation of: | 10 CFR 50.55a |
CCA | P.5, Operating Experience |
INPO aspect | CL.1 |
' | |