ENS 54588
ENS Event | |
---|---|
04:00 Mar 19, 2020 | |
Title | Part 21 Notification - Test Stand Deficiency |
Event Description | The following is a summary of information obtained from Engine Systems, INC. (ESI) via fax:
On February 14, 2019, ESI determined that all new P/N H40084720 EMD fuel injectors they supplied are considered suspect. The endurance test stand utilized for new EMD fuel injectors was found to contain a deficiency that may damage injectors during the testing process. There is a potential for the actuating stem of the endurance test stand to strike the injector follower off center, creating side loading that results in inadvertent rubbing between the follower and body. The condition is exacerbated by a lack of continuous lubrication from the test stand. Over the 2-hour test duration, the running surface of the follower scores and metal particles are introduced into the top end of the injector. The migration of these particles through the injector could initiate a seizure. An improperly functioning fuel injector could affect the load carrying capability of the diesel engine and adversely affect the diesel's ability to perform its safety-related function. The licensees affected are Columbia, St. Lucie, Dresden, Fitzpatrick, Point Beach, Turkey Point, Quad Cities, and Grand Gulf. Points of Contact: John Kriesel, Engineering Manager and Dan Roberts, Quality Manager at Engine Systems Inc. 175 Freight Rd. Rocky Mount, NC 27804. Office number: 252-977-2720 |
Where | |
---|---|
Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+12.63 h0.526 days <br />0.0752 weeks <br />0.0173 months <br />) | |
Opened: | Dan Roberts 16:38 Mar 19, 2020 |
NRC Officer: | Andrew Waugh |
Last Updated: | Mar 19, 2020 |
54588 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |