Order (Schedule for Responses to Petitioner Filings).* Orders That Bg&E & NRC Staff Shall Have Up to & Including 981009 within Which to Respond to Natl Whistleblower Ctr Submissions.With Certificate of Svc.Served on 981002
ML20154B008
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/02/1998
From: Bollwerk G
Atomic Safety and Licensing Board Panel
To:
BALTIMORE GAS & ELECTRIC CO., NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
CON-#498-19593 98-749-01-LR, 98-749-1-LR, LR, NUDOCS 9810050071
Download: ML20154B008 (3)


Text

. - - - . . - . - - - - _ _ - . - - --

,f $$$ '

UNITED STATES OF AMERICA 00CKETED  !

NUCLEAR REGULATORY COMMISSION USNRC ,

ATOMIC SAFETY AND LICENSING BOARD W OCT -2 P1 :25 Before Administrative Judges:

G. Paul Bollwerk, III, Chair ,

Y Dr. Jerry-R. Kline ADJUDCim Thomas D. Murphy .i STAFF

'ssWED OCT -21998 In the Matter of Docket Nos. 50-317-LR

  • 50-318-LR

-BALTIMORE GAS AND ELECTRIC COMPANY ASLBP No. 98-749-01-LR (Calvert Cliffe Nuclear Power Plant, Units 1 & 2) October 2, 1998 ORDER (Schedule for Responses to Petitioner's Filings)

Upon consideration of petitioner National Whistleblower ,

Center's (NWC) October 1, 1998 filings entitled " Status Report," " Petitioner's Motion to Vacate and Re-Schedule the Pre-Hearing Conference," and " Petitioner's Motion Requesting to be Informed of Communication Between the NRC Staff and Applicant," it is ORDERED, that applicant Baltimore Gas and Electric Company (BG&E) and the NRC staff shall have up to and including Fridav, October 9, 1998, within which to respond to these NWC submissions.1 2

On October 1, 1998, petitioner NWC also submitted a filing entitled "The [NWC) Reply to NRC Staff and BGE's Answer to NWC's Petition to Intervene and Request for (continued...)

9810050071 981002 e PDR ADOCK O W 17 PDR 0

, O

.-.- -. ~. - - - . - . . ~ _... - . - - - . - - . - ... - - . -- . .~.... - .-_ -

, s. .

! -- r The' filings permitted under this order-should be served on the Board, the office of the Secretary, and counsel for the other participants by facsimile transmission, e-mail, or other means that will ensure receipt by midnight ET on the ,

day of filing. Sag Licensing Board Memorandum and Order 1

-(Initial Prehearing Order) (Aug. 20, 1998) at 8

'(unpublished).

FOR THE ATOMIC SAFETY AND LICENSING BOARD 2 O ----

3

,.A. I bd ('t G. Paul Bollwerk, III ,

ADMINISTRATIVE JUDGE l

Rockville, Maryland

, a L October 2, 1998 l

l i

i l

l 1(... continued) i Hearing," in which it addressed assertions that NWC lacks standing to intervene in this proceeding'. In accordance with the Board's September 21 issuance, see Licensing Board Memorandum and Order (Scheduling Matters and Electronic

Hearing Dat' abase) (Sept. 21, 1998) at 2-3 (unpublished),

i BG&E and the staff have until November 2 to respond to that pleading.  :

e 2 Copies of this order were sent this date to counsel

{ for the applicant BG&E and to counsel for petitioner NWC by  ;

Internet e-mail transmission; and to counsel for the staff by e-mai'l-through the agency's' wide area network system.

i

I UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of BALTIMORE GAS & ELECTRIC COMPANY Docket No.(s) 50-317/318-LR (Calvert Cliffs Nuclear Power Plant, Units 1 and 2)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB ORDER (SCHEDULE FOR ...)

have been served upon the following persons by U.S. mail, first class, except

as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.

Administrative Judge Office cf Commission Appellate G. Paul Bo11werk, III Adjudication Chairman U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Washington, DC 20555 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Comission Washington, DC 20555 Administrative Judge Administrative Judge Jerry R. Kline Thomas D. Murphy Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission Washington, DC 20555 Washington, DC 20555 Robert M. Weisman, Esq.

Marian L. Zobler, Esq. Stephen M. Kohn, Esq.

Office of the General Counsel National Whistleblower Legal Defense Mail Stop 15 818 and Education Fund U.S. Nuclear Regulatory Comission 3233 P Street, NW Washington, DC 20555 Washington, DC 20007 David R. Lewis, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037 Dated at Rockville, Md. this j .

2 day of October 1998 /

/

Offi ce of the Secretary of the Comission