MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] |
See also: IR 05000456/1984044
Text
._. . - -. . - . _ _ _ _ . . . = . . .=_ - . - - ._ -. .-
' s put
'. #o,
,
UNITED STATES
E o NUCLEAR REGULATORY COMMISSION t
5 E WASHING TON, D. C. 20555
,
, e, :E )
l
.....* R8 25 26 '
i i
I
l
Docket Nos. 50-456/457
MEMORANDUM FOR: James G. Partlow, Director
Division of Inspection Programs
Office of Inspection and Enforcement
- THRU
- Vincent S. Noonan, Director
l PWR Project Directorate #5 ,
Division of PWR licensing-A
"
FROM: Janice A. Stevens, Project Manager
PWR Project Directorate #5 i
Division of PWR I.icensing-A l
SUBJECT: CAT INSPECTION FOR BRAIDWOOD STATION, UNITS 1 AND 2
In your March 15, 1985 memorandum to Hugh L. Thompson, Jr., you requested NRR
assistance in reviewing several deficiencies regarding electrical separation
that were revealed during the Braidwood Station Construction Appraisal Team
(CAT) inspection.
In response to your request, NRR has reviewed the CAT inspection report
50-456/84-44, 50-457/84-40, dated February 20, 1985, with regard to the
deficiencies related to the physical separation between safety-related cables
and nonsafety-related cables. These deficiencies derive from exceptions to
the recommendations of R.G. 1.75.
NRR reevaluated this item and has reviewed the deviations from R.G. 1.75 in a
separate SSER (Enclosed). We have summarized below the results of our
evaluation on cable separation as it relates to the separation of
safety-related cables and nonsafety-related cables.
i
l
The Byron /Braidwood raceway design is based on the standard separation '
criteria contained in IEEE 384-1974 as endorsed by R.G. 1.75. However, the
separation criteria between the non-Class 1E and Class 1E cables is less
than the standard separation distance recommended by R.G. 1.75. In order to
provide justification for these lesser separation distances, the applicant
instituted a test program conducted by Wyle I.aboratories. The test program
methodology and results, submitted by the applicant by letters dated August 6
and October 22, 1985, were reviewed by the staff. The proposed criteria for
separation of Class 1E and non-Class IE cables which the staff has evaluated
in the SSER are as follows:,
1. Separation distances of twelve (12) inches vertical and three (3)
inches horizontal between safety-related and nonsafety-related
raceways.
8603050300 860225
l PDR ADOCK 05000456
o PDR
I
l
l
\
-
RB 251NB
i
i .
,
! -2-
2. Separation of safety-related cables routed in free-air in contact
l with a raceway containing nonsafety-related cables, and separation
! of nonsafety_related cables routed in free-air in contact with a
raceway containing safety-related cables.
l 3. Vertical or horizontal free-air cable in parallel with vertical or
l
'
horizontal free-air cable with six (6) inches horizontal and
vertical separation.
Based on our evaluation, as documented in the enclosed SSER, the above
separation criteria are acceptable. These criteria address the deficiencies
which the CAT identified and resolve their concerns to the satisfaction of the
staff. The applicant is required to specify these lesser cable separation
criteria in the Byron /Braidwood Stations FSAR.
Another issue identified during the CAT inspection involved the applicant's
use of the term " quasi safety-related." The applicant has stated that this
term is used to identifiy safety-related circuits qualified to Class 1E
requirements which are installed in a non-Seismic Category I building. The
applicant is required to have this term defined in the Sargent and I. undy
design criteria manual.
Janice A. Stevens, Project Manager
PWR Project Directorate #5
Division of PWR I.icensing-A
Enclosure: SSER on Cable Separation
cc: I.. Olshan Distribution:
S. Rhow ":Doetet FHe x
S. Treby NRC PDR
I.ocal PDR
PD#5 R/F
JStevens
M. Rushbrook
. / r
OFC : El.D :DI $U#5 :PD#5 /1) - : : : :
.....:... ......: TL___..:.... W.,. . . : . _ _ _ _ . _ _ _ _ _ : . . . . . . . _ _ . . . : . . . . . . . . . . . . : . . . . . . . . . . .
NAME :ST : 'onan :JASt : : : :
.....:.... ._____:............:_____.......:........... :.........__
DATE : 1/ /86 ......:__.h.......:......
86 :$/5786 :ens : : :
OFFICIAL. RECORD COPY
I
.
-
FEB 25 998
s.
.
-2-
2. Separation of safety-related cables routed in free-air in contact
with a raceway containing nonsafety-related cables, and separation
of nonsafety-related cables routed in free-air in contact with a
raceway containing safety-related cables.
3. Vertical or horizontal free-air cable in parallel with vertical or
horizontal free-air cable with six (6) inches horizontal and
vertical separation.
Based on our evaluation, as documented in the enclosed SSER, the above
separation criteria are acceptable. These criteria address the deficiencies
which the CAT identified and resolve their concerns to the satisfaction of the
1
'
staff. The applicant is required to specify these lesser cable separation
criteria in the Byron /Braidwood Stations FSAR.
Another issue identified during the CAT inspection involved the applicant's
use of the term " quasi safety-related." The applicant has stated that this
term is used to identify safety-related circuits qualified to Class IE
requirements which are installed in a non-Seismic Category I building. The
applicant is required to have this term defined in the Sargent and Lundy
design criteria manual.
=n $
Jahice A. Stevens, Project Manager
PWR Project Directorate #5
Division of PWR licensing-A
Enclosure: SSER on Cable Separation