Forwards Modes to Restart Items & Requests Review & Comments Prior to 960926 Upcoming SAP Meeting
ML20133G870
Person / Time
Issue date: 09/06/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dellagrec A, Eugene Kelly, Marshall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20133F923 List:
References
FOIA-96-351 NUDOCS 9701160196
Download: ML20133G870 (7)


Text

. -- - - . - . . . . - - - . - - . - . . . - - - . - . . . . . - ._ -. . - --- . . -

[ .

.L' 33

.s fu u

,y !b From: Larry Nich ison . I' 1 CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...

/ /

To:

Date: 9/6/96 3:06pm

Subject:

Mode reqmts.

Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.

l thanks l

l CC: RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1

I l

9701160196 970113 PDR FOIA O'NEILL96-351 PDR

. 9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.

MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)

MODE 4 = HOT SHUTDOWN (<350)

MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)

MODE 1 = POWER OPERATIONS l

l TECHNICAL RESTART ISSUES I TECHNICAL ISSUE Reso. Mode

_QIrg

1. Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4 )

indicate actual d/p may be greater than design d/p.

]

2. Reliability of Control Air System. Requires operator DRP 4 action to start backup compressor.
3. CW Screen Motor Reliability. No automatic motor DRP 3 operation, vulnerable to grass intrusion
4. Digital feedwater installation to correct feedwater DRS 2 control reliability.
5. Moisture in EDG air start system causes reliability DRP 6 problem with check valves.
6. EDG output breakers fail to close when switch taken to DRS 6 close.
7. EDG has minimalload margin. DRS 4
8. EDSFI Followup Issues DRS 4
9. Cracked exhaust steam piping could indicate weak DRS 4 erosion / control program.
10. Feedwater nozzle bypass flow introduced error in DRS 2 calorimetric and power level. ,
11. EDG 1 A load fluctuations. DRS 6
12. Review adequacy of fuse control program. DRS 2
13. Review gas turbine batteries degrading with loss of one DRS 4 source of offsite power. Turbine referenced in TS basis to support SW outages.
14. Hagan module replacement project. DRS 4

TECHNICAL ISSUE -- - - - - - -

R.ig - ---- - ' -

prg

15. Procedure contains non-conservative 125V battery DRS 6 acceptance criteria.
16. NRC & QA identified numerous IST program DRS 4 deficiencies.
17. Main condenser steam dumps malfunction, requires DRP 2 closing MSIVs on trip and prevents use of main condensar.
18. Poor reliability of PDP charging pumps. DRP 4
19. Poor process for configuration control of pipe supports. DRP 4
20. POPS ability to mitigate overpressure events. DRS 6
21. Wiring separation & redundancy concerns with RG 1.97 DRS 4 instruments & cable separation
22. PORV (1PR1) seat leakage, requiring block valve DRP 6 closure.
23. Undersized PORV accumulators. DRS 4
24. Gate valves identified susceptible to press lock & DRS 6 thermal binding.
25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4
26. Radiation monitor problems. DRS 4
27. Rx coolant pump oil collection system deficiencies. DRS 4
28. Understand causes and corrective actions for failures of DRP 5 Rx coolant pump seals.
29. Rx Head Vent Valve Stroke Times. DRP 5
30. RHR Min-flow Valve (RH29) Failures on unit 2. DRP 6
31. RHR Dsch Valve (21RH10) Banging Noise. DRP 6
32. Review program for control & inspecting resilient fire DRS 4 barrier seals.

I.

TECHNICAL ISSUE Reso.

D19

33. Control rods stepping with no temperature error signal. DRS 2  !

l

34. Numerous SI pump deficiencies. DRP 5  !

l

35. Verify adequate protection for S1 Pump runout. DRS 5 l
36. Si relief valves performance history of leaking and DRP 6 lifting.
37. Review corrective action for service water pipe erosion. DRS 4
38. Spurious high steam flow signals causing St. DRS 4
39. Review corrective actions to resolve numerous DRS 4 l switchyard failures.
40. Verify adequate correction for overhead annunciator DRS 4 failures.
41. Verify adequate corrective action to ensure steam DRS 4 generator tube integrity.
42. Auxiliary Feedwater System Performance and Reliability. DRS 3
43. Adequacy of corrective actions from the Salem Unit 2 DRP 2 reactor trip.

1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp. Mode (Licensee) Org.

1. Resolve Appendix R jumpers and program NRR 4 discrepancies, including fire barrier l penetrations.
2. Review efforts to maintain configuration DRS 4 control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.
3. Adequacy and use of procedures, DRP 2 including procedure revision backlog. l
4. Management of engineering and DRP/ 2 maintenance backlog. RATI
5. Program for foreign material exclusion. DRP 4
6. Operability determinations. DRP 6
7. Operator performance (Coordination DRS 2 and Communication)
8. Correction of operator workarounds, DRP 2 including control room deficiencies.
9. Program to utilize operating (industry) DRP 2 experience feedback.
10. Corrective action program, including DRP 2 adequacy of root causa program.

j lli.e. PROGRAMMATIC RESTART ISSUES

- continued -

! RESTARTISSUE Resp. Mode I (Licensee) Org.

i j- 11. Engineering contribution to problem resolution, DRP 4

, including safety eve!uations.

l 12. Tagging DRP 4 1

i

} 13. Adequacy of Emergency Preparedness DRS 2 l 14. Resolution of licensing commitments. NRR 4

15. Adequacy of Emergency Operating Procedures. DRS 3

?

16. Adequacy of training. DRS 6 l 17. Adequacy of work control and planning program. DRS 2
18. Parts availability & accuracy of bill of materials DRS 2

{

i

19. Adequacy of Licensing Basis Conformance FSAR DRP 2
Discrepancies specifically including Service Water i System design and reliability

~

l 20. Adequacy of QA program DRP 6 (Receptiveness to documented deficiencies)

21. Licensee self assessment capability DRP 2 (Performance monitoring & trending)
22. Integrated Test Program DRS All i

L

. )

i .*

  • LICENSEE RESTART PLANS I

RESTART PLANS Resp. Mode

(Licensee) Org.

1

1. Conduct of Operations

. DRP 2 -

2. Reliable Maintenance DRP 2 i 3. Work Control Process improvement DRP 2
4. System Engineering and Equipment DRS 2  !

Reliability j 5. Engineering Performance DRS 2 j 6. Organizational Self Assessment NRR 2

. 7. Corrective Action DRP 2 )

f 8. Human Performance Management NRR 2

9. Accredited Training DRS 2 l