Forwards Modes to Restart Items & Requests Review & Comments Prior to 960926 Upcoming SAP Meeting
ML20133G870
Person / Time
Issue date: 09/06/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dellagrec A, Eugene Kelly, Marshall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20133F923 List:
References
FOIA-96-351 NUDOCS 9701160196
Download: ML20133G870 (7)


Text

. -- - -.

[

.L' 33

.s

,y

!b fu u

Larry Nich ison.

I' 1

/

From:

CSM, ALD1, EMK, WHk' WND2.WNP3.LNO, WND2.WNP3.JFS3...

/

To:

Date:

9/6/96 3:06pm

Subject:

Mode reqmts.

Attached is a 1st cut at attaching modes to each of our restart items. please review and provide comments prior to the upcoming SAP mtg on 9/26.

l thanks l

l CC:

RWC To: CSM (Charles Marshall) R-I ALD1 (Aniello Della Grec) R-I EMK (Eugene Kelly) R-I WHR (William Ruland) R-I LN0 (Leonard 01shan, NRR JFS3 (John Stolz, NRR 1

I l

9701160196 970113 PDR FOIA O'NEILL96-351 PDR

9 ISSUE MUST BE CLOSED PRIOR TO ENTRY INTO THE MODE LISTED.

MODE 6 = REFUELING MODE 5 = COLD SHUTDOWN (<200)

MODE 4 = HOT SHUTDOWN (<350)

MODE 3 = HOT STANDBY MODE 2 = STARTUP (< 5%)

MODE 1 = POWER OPERATIONS TECHNICAL RESTART ISSUES TECHNICAL ISSUE Reso.

Mode

_QIrg 1.

Cont. Spray Dsch Viv (CS-2) Operability. Calculations DRS 4

indicate actual d/p may be greater than design d/p.

]

2.

Reliability of Control Air System. Requires operator DRP 4

action to start backup compressor.

3.

CW Screen Motor Reliability. No automatic motor DRP 3

operation, vulnerable to grass intrusion 4.

Digital feedwater installation to correct feedwater DRS 2

control reliability.

5.

Moisture in EDG air start system causes reliability DRP 6

problem with check valves.

6.

EDG output breakers fail to close when switch taken to DRS 6

close.

7.

EDG has minimalload margin.

DRS 4

8.

EDSFI Followup Issues DRS 4

9.

Cracked exhaust steam piping could indicate weak DRS 4

erosion / control program.

10. Feedwater nozzle bypass flow introduced error in DRS 2

calorimetric and power level.

11. EDG 1 A load fluctuations.

DRS 6

12. Review adequacy of fuse control program.

DRS 2

13. Review gas turbine batteries degrading with loss of one DRS 4

source of offsite power. Turbine referenced in TS basis to support SW outages.

14. Hagan module replacement project.

DRS 4

TECHNICAL ISSUE -- -

R.ig prg

15. Procedure contains non-conservative 125V battery DRS 6

acceptance criteria.

16. NRC & QA identified numerous IST program DRS 4

deficiencies.

17. Main condenser steam dumps malfunction, requires DRP 2

closing MSIVs on trip and prevents use of main condensar.

18. Poor reliability of PDP charging pumps.

DRP 4

19. Poor process for configuration control of pipe supports.

DRP 4

20. POPS ability to mitigate overpressure events.

DRS 6

21. Wiring separation & redundancy concerns with RG 1.97 DRS 4

instruments & cable separation

22. PORV (1PR1) seat leakage, requiring block valve DRP 6

closure.

23. Undersized PORV accumulators.

DRS 4

24. Gate valves identified susceptible to press lock &

DRS 6

thermal binding.

25. Pressurizer Spray Prob! ems /Use of Aux Spray DRP 4
26. Radiation monitor problems.

DRS 4

27. Rx coolant pump oil collection system deficiencies.

DRS 4

28. Understand causes and corrective actions for failures of DRP 5

Rx coolant pump seals.

29. Rx Head Vent Valve Stroke Times.

DRP 5

30. RHR Min-flow Valve (RH29) Failures on unit 2.

DRP 6

31. RHR Dsch Valve (21RH10) Banging Noise.

DRP 6

32. Review program for control & inspecting resilient fire DRS 4

barrier seals.

I.

TECHNICAL ISSUE Reso.

D19

33. Control rods stepping with no temperature error signal.

DRS 2

l

34. Numerous SI pump deficiencies.

DRP 5

l

35. Verify adequate protection for S1 Pump runout.

DRS 5

36. Si relief valves performance history of leaking and DRP 6

lifting.

37. Review corrective action for service water pipe erosion.

DRS 4

38. Spurious high steam flow signals causing St.

DRS 4

39. Review corrective actions to resolve numerous DRS 4

switchyard failures.

40. Verify adequate correction for overhead annunciator DRS 4

failures.

41. Verify adequate corrective action to ensure steam DRS 4

generator tube integrity.

42. Auxiliary Feedwater System Performance and Reliability.

DRS 3

43. Adequacy of corrective actions from the Salem Unit 2 DRP 2

reactor trip.

1 PROGRAMMATIC RESTART ISSUES RESTARTISSUE Resp.

Mode (Licensee)

Org.

1.

Resolve Appendix R jumpers and program NRR 4

discrepancies, including fire barrier penetrations.

2.

Review efforts to maintain configuration DRS 4

control, given examples from Hagan modules and botting. Effort to include setpoint control program and drawing control.

3.

Adequacy and use of procedures, DRP 2

including procedure revision backlog.

4.

Management of engineering and DRP/

2 maintenance backlog.

RATI 5.

Program for foreign material exclusion.

DRP 4

6.

Operability determinations.

DRP 6

7.

Operator performance (Coordination DRS 2

and Communication) 8.

Correction of operator workarounds, DRP 2

including control room deficiencies.

9.

Program to utilize operating (industry)

DRP 2

experience feedback.

10. Corrective action program, including DRP 2

adequacy of root causa program.

j lli.e. PROGRAMMATIC RESTART ISSUES

- continued -

RESTARTISSUE Resp.

Mode I

(Licensee)

Org.

i j-

11. Engineering contribution to problem resolution, DRP 4

including safety eve!uations.

l

12. Tagging DRP 4

1 i

}

13. Adequacy of Emergency Preparedness DRS 2

l

14. Resolution of licensing commitments.

NRR 4

15. Adequacy of Emergency Operating Procedures.

DRS 3

?

16. Adequacy of training.

DRS 6

l

17. Adequacy of work control and planning program.

DRS 2

{

18. Parts availability & accuracy of bill of materials DRS 2

i

19. Adequacy of Licensing Basis Conformance FSAR DRP 2

Discrepancies specifically including Service Water i

System design and reliability l

20. Adequacy of QA program DRP 6

~

(Receptiveness to documented deficiencies)

21. Licensee self assessment capability DRP 2

(Performance monitoring & trending)

22. Integrated Test Program DRS All i

L

)

i LICENSEE RESTART PLANS I

RESTART PLANS Resp.

Mode (Licensee)

Org.

1

1. Conduct of Operations DRP 2
2. Reliable Maintenance DRP 2

i

3. Work Control Process improvement DRP 2
4. System Engineering and Equipment DRS 2

Reliability j

5. Engineering Performance DRS 2

j

6. Organizational Self Assessment NRR 2
7. Corrective Action DRP 2

)

f

8. Human Performance Management NRR 2
9. Accredited Training DRS 2

l