ML20140A435

From kanterella
Revision as of 14:51, 28 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Amend 91 to License DPR-28,issued on 851028, Replacing Page 106.Original Page Contains Typos
ML20140A435
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/17/1986
From:
NRC
To:
Shared Package
ML20140A442 List:
References
NUDOCS 8603200111
Download: ML20140A435 (1)


Text

u e ,-

,p' VYNpS 3.6 LIMITING CONDITIONS FOR OPERATION 4.6 SURVEILLANCE REQUIREMENTS 3.6 REACTOR COOLANT SYSTEM 4.6 REACTOR COOLANT SYSTEM Specification A. pressure and Temperature Limitations (cont.)

5. The reactor vessel irradiation surveillance specimens shall be removed  %

and examined to determine changes in l material properties in accordance with the following schedule:

pAPSULE REMOVAL YEAR 1 10 2 30 3 Standby h The results shall be used to update Figures 3.6.2 and 3.6.3. The removal times shall be referenced to the i refueling outage following the year i specified, referenced to the date of I commercial operation.

O.,

B. Coolant chemistry B. Coolant chemistry ii a. A sample of reactor coolant shall

1. a. During reactor power operation, the 1.

l radiolodine concentration in the be taken at least every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> I reactor coolant shall not exceed and analyzed for radioactive 1.1 microcuries of I-131 dose lodines of I-131 through I-135 equivalent per gram of water, during power operation. In g ,

except as allowed in addition, when steam jet air Specification 3.6.B.1.b. ejector monitors indicate an increase in radioactive gaseous

. effluents of 25 percent or 5000 uCi/sec, whichever is greater, 1

Amendment No. 33, 91 8603200111 PDH 860317 106 P ADOCK 05000271 PDR

_ _