Provides List of Commitments Re Encl LER 97-012,rev 00
ML20141C213
Person / Time
Site:  Constellation icon.png
Issue date: 05/09/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141C218 List:
References
LWP-97-050, LWP-97-50, NUDOCS 9705160204
Download: ML20141C213 (2)


LER-2097-012, Provides List of Commitments Re Encl LER 97-012,rev 00
Event date:
Report date:
2542097012R00 - NRC Website

text

. . - .- .

l . < ommonwcalth liimm Compan) j 1 (Juad Cities (icocrating Station

( Q 8 22*lO 20hth A\enur North i, ( ordos a. H. 612 iJ-9'su i

'lcl .4&M i s.22 e 1

)

1 i

LWP-97-050 I

i May 9, 1997 1 1

l I

l I

United States Nuclear Regulatory Commission Washington, DC 20555 i i

Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One 1 I

Enclosed is Licensee Event Report (LER)97-012, Revision 00, for Quad Cities Nuclear Power Station. ,

This report is submitted in accordance with the requirements' of the l g Code of Federal Regulations, Title 10, Part 50.73(a)(2)(ii)(A). The

\ Licensee shall report any event or condition that resulted in the l condition of the nuclear power plant, including its principal safet)  !

barriers, being seriously degraded, or that resulted in the nuclear power plant being in an unanalyzed condition that significantly compromised plant safety. ,

l The following commitments are being made by this letter:

}T ,

The following are the actions to use to correct the Refuel Bridge 1/

Interlock for the Monorail Hoist: kJ

1. Take steps to ensure that Operations / Fuel Handling 'Out Of  !

Service' the Monorail Hoist while conducting core alterations in the near future. This will be completed by 060797.

2. Several different solutions are being evaluated for long term corrective actions. Final resolution will be determined by 093097.

i 9705166204 970509 PDR ADOCK 05000254

! S PDR O .l .ll! .l{l.Il ,$.,! !,. !.!

u .

STMORW5097.LWP m .mr-

= 1 4

o '

ESK-97-050 2 May 9, 1997 I

If there are any questions or comments'concerning this letter, please I refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, ,

COMMONWEALTH EDIS0N QUAD ITIES LEAR POWER STATION

/

1,5 -

NA.L L. W. Pearce Station Manager l

LWP/CP/p1m l

Enclosure I

l cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Manager, NRR l

~

C. G. Miller, Senior Resident Inspector, Quad Cities i W. D. Leech, MidAmerican Energy Company fG D. C. Tubbs, MidAmerican Energy Company V P. L. Piet, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INP0 Records Center  ;