(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] Category:TEST REPORT
MONTHYEARML20216G5151998-02-28028 February 1998 Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses ML20197J1901993-03-31031 March 1993 Power Uprate Startup Test Rept for Nov 1992-Mar 1993 ML20127P1461993-01-0808 January 1993 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr1990-01-31031 January 1990 Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr NRC-88-0212, Suppl 9 to Interim Startup Test Rept1988-09-10010 September 1988 Suppl 9 to Interim Startup Test Rept ML20151K0271988-07-25025 July 1988 Confirmation Test Rept for IE Bulletin 85-003 NRC-88-0038, Suppl 7 to Interim Startup Test Rept1988-03-10010 March 1988 Suppl 7 to Interim Startup Test Rept ML20147D6841987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6741987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6661987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6981987-12-21021 December 1987 Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept1987-12-0707 December 1987 Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept NRC-87-0155, Suppl 5 to Interim Startup Test Rept1987-09-19019 September 1987 Suppl 5 to Interim Startup Test Rept ML20235F5761987-08-31031 August 1987 Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level ML20237G3621987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) ML20237G3821987-08-0606 August 1987 Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) ML20237G3991987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept1987-06-10010 June 1987 Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept ML20214J3811987-03-12012 March 1987 Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) ML20214J4151987-03-12012 March 1987 Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) ML20214J3991987-03-12012 March 1987 Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) ML20204H0071987-03-10010 March 1987 Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept ML20210A7691987-02-0303 February 1987 Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 ML20211D3601986-10-16016 October 1986 Main Steam Bypass Sys Testing Program Rept ML20197C2531986-10-10010 October 1986 Leakage Reduction Program Summary Rept for RHR Sys - (E1100) ML20199E8631986-06-13013 June 1986 Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 ML20203A0281986-03-20020 March 1986 Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) ML20203A0661986-03-20020 March 1986 Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) ML20210D9091986-03-18018 March 1986 Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program ML20140D4161986-03-12012 March 1986 Interim Startup Test Rept ML20215C2601985-07-17017 July 1985 Radiation Measurements - Complete Survey ML20107E1941984-11-30030 November 1984 Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 ML20065F9751982-07-0808 July 1982 Inservice Testing Program ML20009B2421981-06-10010 June 1981 Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. ML20010E6651979-12-13013 December 1979 Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005. ML20010E6641979-12-11011 December 1979 Test Rept: Cofrentes H13-P618. 1998-02-28
[Table view] |
Text
~
ATTACHMENT 2 Detroit Edison .
Date: December 23, 1987 To: S. K. Sharma Fermi 2 From: R. L. Colvell d##
P.M.Beckwith)44(i Engineering Research
Subject:
Chemical and Physical Testing of Fasteners for Fermi 2 Fermi Test Req. 610143 Engineering Research Report 87C71-21, Revision 2 Ten items were delivered to Engineering Research for material analysis. They are described as follows.
Item i DENB i Description 1 1 3/8" 13/16" Bolt A193 Gr. B7 2 2 7/8" 5" Bolt A307 Gr. B 3 3 5/8" 2-15/16"Bolt A307 Gr. B 4 4 1" -
8 1/2"Bolt A193 Gr. B8 5 5 1" - 8 ;/2" Bolt A307 Gr. B b 6 6 5/8" 3-1/4" Bolt SAE J429 Gr. 2 7 7 3/4" 4" Bolt SAE "J429 Gr." 5 8 8 .1/2" 13 - 5" Bolt 9 9 3/8" 2" Bolt SAE J429 Gr. 2 10 10 5/16" 5/8" Bolt SAE J429 Gr. 5 The test results are displayed on attached NRC Data Summary Form alon.g with the apprepriate specifications for each item.
Test Piocedurca
- 1. TP-FL-609 Rev. O Test Procedure for the Determination of Carbon in Steel.
- 2. TP-FL-032 Rev. O Tast Procedure for Dissolution of Material by Acid Digestion for Total Metals ,
Analysis I
- 3. TP-FI,-045 Rev. O Test Procedure for Determination of Sulfur in Steel and Cast Iron.
- 4. TP-FL-046 Rev. O Test Procedure for the Analysis of Steel and Cart iron Samples by Inductively Coupled Plasma Spectroscopy
- 5. TP-AM-003 Rev. 2 Test Procedure for Material Evaluation in Accordance with ASTM, ANSI, ASIT AWS, and f SAE Test Methods.
i
?
PE.14/22 8801200261 880114 PDR ADCCK 05000341 Q PDR
ATTACHMENT 2 87C71-21 Rev. 2 2.
Test Requisition #610143 DATA SL99fARY Mechanical Analysis Chemical Analysis (wt. Z)
Item i Crade Hardness C Mn P S Si Mo Cr Ni 1 A193 B7 0.390 0.86 <0.020 0.018 0.30 0.15 0.87 0.14 Spec (--) (.37 .49) (.65-1.10) (<0.035) (<0.040) (.15 .35) (.15 .25) (.75-1.2) 4 A193 B8 77.6 HRB 0.063 1.23 <0.02 0.024 0.27 0.35 19.0 9.0 Spec (<96 HRB) (<0.08) (<2.0) (<0.045) (<0.03C) (<l.0) '(---) (18.0-20.0) (8.0-10,5) 2 A307 Gr. B *98.4 HRB <0.020 0.020
~
3 84.7 <0.020 0.030
~
5 80.6 <0.020 0.025 Spec (69-95 HRB) (---) ( ) (<0.040) (<0.050) (---) (---) ( ) (---)
6 SAE J429 Gr.2 91.9 0.21 <0.020 0.034 9 SAE J429 Gr.2 *40.4 HF.C 0.37 <0.020 0.028 l
Spec 80-100 HRB (<0.55) ( ) (<0.048) (<0.058) ( ) ( ) ( ) (- -)
Hardness Core Super. Chemical Analysis (wt.Z)
(HRC) (30-N) C, P, S, 7 SAE J429 Gr.5 25.3 51 0.36 0.020 0.026
- denotes deviation from specificatio.a. ~
~
8 29.1 53 0.35 <0.020 0.033 Higher hardness values indicate higher
~
10A 29.9 51 0.40 <0.020 0.012 strength bolts. Although stronger,
~
10B 29.9 51 0.40 <0.020 0.013 bolts with hardness values above 20 HRC Spec (25-34) (<54) (.28 .55) (<0.048) (<0.058) are more suseptible to S.C.C..
. PE.14/22
- ATTACHMENT 2 j ,
87C71-21 Rsv. 2 3.
I MT&E Equipment.
ER0013 Wilson Rockwell Hardness Tester ER0014 Wilson Rockwell Hardness Tester ER7025 LECO Carbon Analyzer I ER7027 Sulfur Analysis System ER7000 Analytical' Balance ER0553 Balance Weights ER7002 Inductively Coupled Plasma Spectrometer All work was performed in accordance with the Engineering Research Quality Assurance Program.
hf bM Approved by: 4fJ J.D.Cplewski J. C. CUillaumin Supervisor i QA Administrator:_
R. L. Gamble Copies to: R. L. McIntyre (File)
Fermi 2 Dist.
l l
l i
4 l
RLC/gc PE.14/22 l
!