GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE
%e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
Remove Page Insert Page 3.3-7a 3.3-7a
-y P
mm
~ g.ff,\
~
~
G ,
LIMITING CONDITION FOR-OPERATION SURVEILLANCE REQUIREMENTS
[:
ji- " 3.3;I' Scram Discharge Volume Vent- .4.3.I Scram Discharge Volume Vent
- and Drain valves ana Orain valves . ,
x During' reactor power operation,- 1. Valve Position Verification all scram' discharge volume vent
- and drain valves shall be Each scram discharge volume vent operable. If this specification and drain valve shall be verified
- cannot be met, an orderly shut- to be in the open position
- at ldown shal' be initiated and least once per 31 days.
the_ react r shall be placed in
,. the Hot-Shutdown Condition 2. Valve Testing
'within-12 hours.
- a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
- b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-
- 1. Close within 45 seconds l after receipt of a signal for control rods to scram, and
- g
- 2. Open when the scram signal is reset.
y
- These valves may be closed intermittently for testing under administrative
, controls.
3.3-7a p