ML20137S224

From kanterella
Revision as of 11:20, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Publication of Encl Fr Notice Denying 10CFR2.206 Petition
ML20137S224
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/10/1986
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Phillips J
NRC OFFICE OF ADMINISTRATION (ADM)
References
2.206, NUDOCS 8602140159
Download: ML20137S224 (1)


Text

9

/ 'o

~,, UNITED STATES 1 8 n NUCLEAR REGULATORY COMMISSION g E WASHINGTON. D. C. 20555

  • * . . . ,e February 10, 1986 MEMORANDUM FOR: John Phillips, Chief Rules and ?rocedures Branch Division of Rules and Records Office of Administration FROM: James M. Taylor, Director Office of Inspection and Enforcement

SUBJECT:

FEDERAL REGISTER NOTICE ON DENIAL OF 10 CFR 2.206 PETITION ON CALLAWAY NUCLEAR PLANT Please arrange for Federal Register publication of the enclosed signed notice regarding denial of a 10 CFR 2.206 petition.

Should you have any questions on this notice, please contact Ms. Melinda Malloy of my staff on X24532.

James M. Tay1

"[ Director Office of Ins tion and Enforcement

Enclosure:

Federal Register Notice 8602140159 860210 PDR ADOCM 05000483 P PDR ,,

t

[7590-01]

UNITED STATES NUCLEAR REGULATORY COMMISSION

[ Docket No. 50-483]

UNION ELECTRIC-COMPANY (Callaway Plant, Unit 1)

Notice is hereby given that the Director, Office of Inspection and Enforcement, has denied a petition under 10 CFR 2.206 filed by Alan S. Nemes, Esq. on behalf of Missouri Coalition for the Environment and Kay Drey. This petition is related to the Callaway Plant, Unit 1. In the petition, Missouri Coalition for the Environment and Kay Drey alleged that the Union Electric Company's revoking the certification of quality control inspectors found to have questionable qualifi-cations in early 1985 raised questions as to the adequacy of the inspection process and the safety of the Callaway Plant. In addition, they alleged that the failure of Union Electric Company's management to identify the problem with inspector qualifications for at least four years showed that the utility violated its legal obligation to continually monitor safety inspections at the plant and to provide inspectors with direct access to levels of management sufficient to assure prompt reaction to safety violations.

~

The reasons for the denial of the petition are fully described in the

" Director's Decision Under 10 CFR 2.206" issued on this~date, which is available for public inspection in the Commission's Public Document Room located at 1717 H Street, N.W., Washington, DC 20555 and in the local public 1

9

t document room for the Callaway Plant, located at the John M. Olin Library, Washington University, Skinker and Lindell Boulevards, St. Louis, M0 63130.

A copy of the decision will be filed with the Secretary for the Commission's review in accordance with 10 CFR 2.206(c).

Dated at Bethesda, Maryland, this 10th day of February, 1986.

FOR THE NUCLEAR REGULATORY COMMISSION m f A\ mn da sM. Taylor,Jfrector fice of Inspection and Enforcement p/

1 John Phillips - 2.-

Distribution

, ' DCS '

PDR LPDR JMTaylor, IE-BKGrimes, IE GTAnkrum,.IE WDAltman, IE Malloy, IE SSchidakel, ELD

.MBridgers, EDO QAB Reading DQAVT Reading (EDO #000523)

IE:DQAVT:QAB* IE:DQAVT:QAB* IE:DQAVT:QAB:C* IE: A :IE Malloy:hmc WDAltman GTAnkrum HJ er 12/11/85 12/11/85 12/11/85 /86 D ELD

  • IE: IE B m JLieberman O RHV limer ' Ir 1/30/86 /86

[ 86 f/86

  • See previous concurrence
  • '~

-C John Phillips Distribution DCS PDR.

LPDR JMTaylor, IE BKGrimes, IE GTAnkrum, IE WDAltman, IE Malloy, IE LRWharton, IE LNCuoco, ELD MBridgers, EDO QAB Reading DQAVT. Reading (EDO #000523).

IE:0QAVT:QAB I. AVT:QAB:C IE:DQAVT:D Malloy:h WDA1tman A1 rum BKGrimes 12// /85 12/q /85 2/ /85 12/ /85 04 -

wi46 ELDS -

IE:DD IE:D JLieberman RHVollmer JMTaylor 12/ '25 12/ /85 12/ /85

//3ks6 4

-- . - . - --. -, , . -.. -. -- -