Letter Sequence Meeting |
---|
|
Results
Other: ML20129F645, ML20210T795, ULNRC-03629, Forwards Proprietary, Electrosleeving Technical Info & non-proprietary Rev 1 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, in Response to 970609 Telcon.Proprietary Rept Withheld, ULNRC-03741, Forwards Proprietary & non-proprietary Addl Info Which Supports License Amend Request,Proposing Installation of Electrosleeves in Callaway Plant Sgs.Proprietary Info Withheld,Per 10CFR2.790
|
MONTHYEARML20129F6451996-09-24024 September 1996 Provides Proprietary & non-proprietary Addl Info in Support of Plant Amend Application That Proposes Installation of Electrosleeves in Plant Sg.Affidavit of Jh Taylor,Encl Project stage: Other ML20133H4091997-01-15015 January 1997 Submits Non-proprietary & Proprietary Agenda from 970115 Electrosleeve Review Meeting Non-Destructive Exam in Response to Nrc'S RAI Re TR BAW-1021P,Rev 1.Proprietary Agenda Withheld Project stage: Meeting ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl Project stage: Meeting ML20140F4301997-04-28028 April 1997 Forwards RAI Re Util 960412 Request for TS Amend to Approve Installation of Framatome Electrosleeves in Plant SGs Project stage: RAI ULNRC-03597, Provides Addl Info in Support of Plant Amend Application Proposing Installation of Electrosleeves in Plant Sgs.Info Presented to NRC Staff in 970506 & 970513-14 Meetings. W/Proprietary Rept 51-1240246-00 & Viewgraphs.Withheld1997-06-0909 June 1997 Provides Addl Info in Support of Plant Amend Application Proposing Installation of Electrosleeves in Plant Sgs.Info Presented to NRC Staff in 970506 & 970513-14 Meetings. W/Proprietary Rept 51-1240246-00 & Viewgraphs.Withheld Project stage: Meeting ULNRC-03629, Forwards Proprietary, Electrosleeving Technical Info & non-proprietary Rev 1 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, in Response to 970609 Telcon.Proprietary Rept Withheld1997-08-0808 August 1997 Forwards Proprietary, Electrosleeving Technical Info & non-proprietary Rev 1 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, in Response to 970609 Telcon.Proprietary Rept Withheld Project stage: Other ML20210T7951997-09-10010 September 1997 Forwards Proprietary Info in Support of Plant'S Amend Application That Proposes Installation of Electrosleeves in Callaway Plant Sgs.Encl Withheld,Per 10CFR2.790 Project stage: Other ML20197K0831997-12-18018 December 1997 Forwards Request for Addl Info Re Union Electric Company 960412 Application & Supplements to Change TSs & Bases to Allow Installation of Framatome Electrosleeves in Callaway Plant Unit 1 SGs Project stage: RAI IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering Project stage: Request ML20198S1501998-01-0909 January 1998 Forwards RAI Re 960412 Application & Suppls,To Change TSs & Bases to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SGs Project stage: RAI ULNRC-03741, Forwards Proprietary & non-proprietary Addl Info Which Supports License Amend Request,Proposing Installation of Electrosleeves in Callaway Plant Sgs.Proprietary Info Withheld,Per 10CFR2.7901998-02-24024 February 1998 Forwards Proprietary & non-proprietary Addl Info Which Supports License Amend Request,Proposing Installation of Electrosleeves in Callaway Plant Sgs.Proprietary Info Withheld,Per 10CFR2.790 Project stage: Other ML20248B0381998-05-20020 May 1998 Forwards Concerns Re Util Responsiveness to NRC Requests for Info Re Review of Proposed Amend to Allow Use of Framatome Electrosleeving Process in Plant Project stage: Approval ML20236T2881998-07-16016 July 1998 Summary of 980707 Meeting W/Util Re Proposed Amend to TS to Allow Installation of Electrosleeves in SG at Plant,Unit 1 Project stage: Meeting ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld Project stage: Request 1997-08-08
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20148G9451988-03-24024 March 1988 Advises That ACRS Review of Proposed Power Uprating for Facility Complete,Based on Evaluation of Concern Raised in 880317 Memo.License Amend Will Be Issued Shortly 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda 1999-08-27
[Table view] |
Text
- 3anuary 22, 1997 LICENSEE: Union Electric Company 1 FACILITY: Callaway Plant, Unit 1
SUBJECT:
MEETING WITH UNION ELECTRIC COMPANY REGARDING PROPOSED T SPECIFICATION AMENDMENT TO ALLOW ELECTROSLEEVING 0F STE)
TUBES IN THE CALLAWAY PLANT STEAM GENERATORS (TAC M95204) l ti
_0n January 15, 1997, a meeting was held with Union E ec r c Company (UE) to l discuss UE's proposed Technical Specification (TS) amendment that would The allow 6 electrosleeving of the steam generator tubes at the Callaway Plant.
electrosleeving process was developed by Framatome Technologies, Inc. (FTI),
and is discussed in Topical ~ Report BAW-10219P, Rev.1, "Electrosleeving Qualification for PWR Recirculating Steam Generator Tube Repair," dated March 1996.
The primary focus of the meeting was the non-destructive examination (NDE) techniques that will be used after installation of slectrosleeves in steam
. generators. During the meeting, representatives from FTI presented new information in the area of NDE in support of the staff's review of the proposed TS amendment.
Attachment 1 is the list of attendees. Attachment 2 is the nonproprietary version of the handout material presented by FTI in the meeting.
ORIGINAL SIGNED BY ,
Kristine M. Thomas, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation DISTRIBUTION: (Hard Copy)
Docket No. 50-483 U Docket' File 'ACRS
'~
PUBLIC OGC Attachments: 1. List of Attendees -
- 2. Meeting slides PDIV-2 R/F (nonproprietary version) JDyer,.RIV
' - 'WJohnson, RIV 1 cc w/atts: See next page DISTRIBUTION: (E-mail)
FMiraglia, FJM AThadani, ACT JRoe, JWR i
NRC FILE CENTER COPY M2' si' ey o ,'
DR D 05 0 G3 EJordan, JKR P PDR N0007 $mrman,RPZ Meeting Participants g p C){ l DOCUMENT NAME: CA970115.MTS OFC PDIV-2/PM PDIV-2/LA NAME KTEN:ye EPME DATE 1/@/97 1/4797 0FFICIAL RECORD COPY
pncero ye t UNITED STATES
- y
^"
j t
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3086H001
% ,,,g # January 22, 1997 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit 1
SUBJECT:
MEETING WITH UNION ELECTRIC COMPANY REGARDING PROPOSED TECHNICAL SPECIFICATION AMENDMENT TO ALLOW ELECTROSLEEVING 0F STEAM GENERATOR TUBES IN THE CALLAWAY PLANT STEAM GENERATORS (TAC M95204)
On January 15, 1997, a meeting was held with Union Electric Company (UE) to discuss UE's proposed Technical Specification (TS) amendment that would allow electrosleeving of the steam generator tubes at the Callaway Plant. The electrosleeving process was developed by Framatome Technologies, Inc. (FTI),
and is discussed in Topical Report BAW-10219P, Rev.1, "Electrosleeving Qualification for PWR Recirculating Steam Generator Tube Repair," dated March 1996.
The primary focus of the meeting was the non-destructive examination (NDE) techniques that will be used after installation of electrosleeves in steam generators. During the meeting, representatives from FTI presented new information in the area of NDE in support of the staff's review of the ;
proposed TS amendment. j Attachment 1 is the list of attendees. Attachment 2 is the nonproprietary version of the handout material presented by FTI in the meeting.
l @ W\~T W Kristine M. Thomas, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-483 Attachments: 1. List of Attendees
- 2. Meeting Slides (nonproprietary version) cc w/atts: See next page
E l
cc w/atts:
Professional Nuclear Mr. Neil S. Carns Consulting, Inc. President and Chief Executive Officer 19041 Raires Drive Wolf Creek Nuclear Operating Corporation Derwood, Maryland 20655 P.O. Box 411 Burlington, Kansas 66839 Gerald Charnoff, Esq.
Thomas A. Baxter, Esq. Mr. Dan I. Bolef, President Shaw, Pittman, Potts & Trowbridge Kay Drey, Representative 2300 N. Street, N.W. Board of Directors Coalition Washington, D.C. 20037 for the Environment 6267 Delmar Boulevard Mr. H. D. Bono University City, Missouri 63130
-Supervising Engineer, Site Licensing Mr. Lee Fritz Union Electric Company Presiding Commissioner Post Office Box 620 Callaway County Court House Fulton, Missouri 65251 10 East Fifth Street .
Fulton, Missouri 65151 U.S. Nuclear Regulatory Commission Resident Inspector Office Mr. Alan C. Passwater, Manager 8201 NRC Road Licensing and Fuels '
- Steedman, Missouri 65077-1302 Union Electric Company i Post Office Box 149 i Mr. G. L. Randolph, Vice President St. Louis, Missouri 63166 j Nuclear Operations e Union Electric Company Mr. J. V. Laux, Manager I P.O.. Box 620 Quality Assurance ;
Fulton, Missouri Union Electric Company 65251
'L Post Office Box 620
- Manager - Electric Department Fulton, Missouri 65251 l Missouri Public Service Commission l
- 301 W. High Mr. Donald F. Schnell i
- Post Office Box 360 Senior Vice President - Nuclear !
- Jefferson City, Missouri 65102 Union Electric Company )
- Post Office Box 149 l
Regional Administrator, Region IV St. Louis, Missouri 63166
. - U.S. Nuclear Regulatory Commission !
Harris Tower & Pavilion
+
611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102
[ ;
i t
,--- w.
Attachment 1 ATTENDEES AT MEETING ON JANUARY 15. 1997 ELECTROSLEEVING 0F STEAM GENERATOR TUBES UNION ELECTRIC A. Passwater T. Herrmann liBf +
K. Thomas G. Hornseth C. Beardslee T. Sullivan S. Coffin R. Hermann J. Muscara A. Dromerick M. McNeil FRAMATOME TECHNOLOGIES S. Wilson M. Key B. Borsum J. Galford J. Helmey 1 C. England R. Pugh MAINE YANKEE ATOMIC POWER C. Eames DUOVESNE LIGHT R. Bologna ONTARIO HYDR 0 TECHNOLOGIES G. Palumbo P. Lichtenberger l PSE&G L. Moaba EE G. Tesfaye C. Smith comed l D. Saccomander J. Blomgren 191E l D. Kim
i
! Electrosleeve Review Meeting i Non-Destructive Examination l: January 15,1997 i
i Callaway Plant
! Docket No. 50-483
! TAC No. M95402 i l
- 1 i l
! Reference l USNRC RAI, December 17,1996 l FTl Topical BAW-1021P, Rev. 01, March 1996 l
l 1
l NON-PROPRIETARY i Framatome Technologies, Inc.
j Integrated Nuclear Services l 155 MillRidge Road Lynchburg, VA 24502 g
y ,,,,,,,y, I
i Electrosleeve Review l Non-Destructive Examination
! A9enda i
- Structural Plugging Criteria l l - Sleeverfube In-Service Criteria i - Installation Criteria i
- NDE Qualification Approach l I
- Types of in-Service Degradation i - Plugging Criteria Approach I
i
- UT System Description I - System Features
! - Probe Features i
j
! - Qualification Samples I
- Qualification Results l a j - Beam Redirection l - Installation Defects l
!
4
)
i sc oto a
- Summary of NDE Questions l (12/17/96 RAl) i l
l
- Schedule for ECT Completion?
]
- Describe the Tube (Sleeve) Plugging Criteria
- Schedule for UT Qual Completion?
l j -
Using Tubes with Real SCC
- Plating Defects Describe Ability of NDE to Detect l
Describe Acceptance Criteria l - Which NDE Technique Will Be Used?
ECT or UT l
- Describe UT Beam Redirection Effects On I
! - Ability to Detect .
- 1 j -
Determining Defect Size l
Determining Sleeve Wall l
- What is the Plugging Criteria Direction?
i Depth Sizing, or l
- Tube vs Sleeve Region Indications, or
- Other i
! um aCH oLoe e
_ _.