ML20071L708
From kanterella
ML20071L708 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 08/08/1982 |
From: | Selan J LAWRENCE LIVERMORE NATIONAL LABORATORY |
To: | NRC |
Shared Package | |
ML17341B532 | List: |
References | |
CON-FIN-A-0250, CON-FIN-A-250 UCID-19148, NUDOCS 8209230424 | |
Download: ML20071L708 (13) | |
Similar Documents at Turkey Point | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML17355A2801998-09-30030 September 1998
[Table view]Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30 Category:QUICK LOOK MONTHYEARML17355A2801998-09-30030 September 1998
[Table view]Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30 Category:ETC. (PERIODIC MONTHYEARML17355A2801998-09-30030 September 1998
[Table view]Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML17355A2801998-09-30030 September 1998
[Table view]Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20071L708&oldid=2822046"