ML20117K985

From kanterella
Revision as of 13:09, 15 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O
ML20117K985
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/30/1996
From: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20117K981 List:
References
NUDOCS 9609120279
Download: ML20117K985 (5)


Text

,

. )

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l

Application of SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. for a Class 103 Docket No. 50-361 License to Acquire, Possess, and Use a Utilization Facility as Part of Amendment Application Unit No. 2 of the San 0.nofre Nuclear No. 153, Supplement 1 l Generating Station SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 153, Supplement 1.

This amendment application consists of Proposed Change Number NPF-10-449, Supplement 1 to Facility Operating License No. NPF-10. Proposed Change Number NPF-10-449, Supplement 1 provides revised Figures 3.7.18-1 and 3.7.18-2 to I clearly indicate the 4.8 w/o initial enrichment limit.

I 9609120279 960830 PDR ADOCK C5000361 p PDH

1 i

l Subscribed on this 3 % dey or th r a c

, 1996.

U Respectfully submitted, SOUTHERN CALIFORNIA EDIS0N COMPANY i

l l

l c (

By:\_, .

Dwight E. Nu n Vice President i

State of California Cou gy of San Diego {A' On Mufitd% l99(bef. ore me, I' '/ h l _

personaFly appedred (Jf 0i(3 AP6v A htaa, fl(ll'}4 fi ff/)((

/

, personally known l

to me to be the person wh6se name is subscribed to the within instrument i and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of wqigh the person acted, executed the instrument.

l ' WITNESS my hnr $1 an official seal. ^^^^\" -

i Signature )/

'i

/_.M'/U7 /, [ / _.  ?

MARIANE SANCHEZ Comt # 1ca3763 f

f Noto ; putMo - Co*:fornia h G ORANGE CCUr,TV -

JL. Comm. Ex;hos CCT 14,1993

-rw m m i i I l 1

4 i

v UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFOR"io EDIS0N COMPANY, ET AL. for a fi w~ 103 Docket No. 50-362 License to Acquire, Possess, anu Use a Utilization Facility as Part of Amendment Application Unit No. 3 of the San Onofre Nuclear No. 137, Supplement 1 Generating Station SOUTHERN CALIFORNIA EDIS0N COMPANY, ET AL pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 137, Supplement 1.

This amendment application consists of Proposed Change Number NPF-15-449, Supplement 1 to Facility Operating License No. NPF-15. Proposed Change Number NPF-15-449, Supplement 1 provides revised Figures 3.7.18-1 and 3.7.18-2 to clearly indicate the 4.8 w/o initial enrichment limit.

I l l

I Subscribed on this '

) day of ' /LJ/k /b

~

, 1996.

U l 1

Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY l

l O a 1

By: M i A Dwight E. Nu Vice President i

State of California 1 b f I before me I h . Odb ,

personaVly appeared ht01(1}bh; .M. 1V i x. n o , personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of hich the person acted, executed the instrument.

l WITNESS my Or.d an officia4 seal. f ^^^^'^r__

Signature '

W/g g N,f 7 l

[,

f Ndory Public - Cc!:fornia ORANGE COUNTY f

i ___

'"; @ = g 11 1

5

, . - ~ . . . . . . - . _ . .- . - - - - _ = - - .__ _..--- .- . .-. -

i 1

l l

DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-10/15-449 i

Proposed Change Number 449 (PCN-449),' Supplement 1 provides revised Figures 3.7.18-1 and 3.7.18-2 to clearly indicate the 4.8 w/o initial enrichment limit.

Oriainal PCN 449:

Unit 2: See Attachment "A" Unit 3: See Attachment "B" PCN 449. Supplement 1:

l l Unit 2: See Attachment "C" i

Unit 3: See Attachment "D"

SUMMARY

of CHANGE Supplement 1 provides revised Figures 3.7.18-1 and 3.7.18-2 to clearly indicate the 4.8 w/o initial enrichment limit.

Figure 3.7.18 " Minimum Burnup vs Initial Enrichment for Unrestricted Placement of SONGS 2 and 3 Fuel in Region II Racks" Figure 3.7.18 " Minimum Burnup vs Initial Enrichment for Placement of SONGS 2 and 3 Fuel in Region II Peripheral Pool Locations" This supplement does not change the area above or below the curve as submitted in PCN 449. The added limit line is to clearly indicate in the curves that the initial fuel enrichment will be limited to 4.8 w/o. This limit is consistent with the other changes requested by PCN 449. Therefore, no change to the existing Significant Hazards Analysis is required.

l l

i l

i I i

i i

i _ _ _ . _

.