Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARU-603247, Application for Amend to License NPF-62,re Various Administrative Changes Involving Deletion of Certain License Conditions Currently Contained in OL That Are Obsolete & No Longer Apply1999-08-23023 August 1999 Application for Amend to License NPF-62,re Various Administrative Changes Involving Deletion of Certain License Conditions Currently Contained in OL That Are Obsolete & No Longer Apply ML20210K8281999-07-23023 July 1999 Application for Amend to License NPF-62,consenting to License Transfer & Approving Conforming Administrative License Amend U-603131, Application for Amend to License NPF-62,changing CPS Design Requirements for Physical Protection from Tornado Missiles for safety-related Equipment,As Described in Plant Usar. Revised USAR Pages,Encl1999-03-0101 March 1999 Application for Amend to License NPF-62,changing CPS Design Requirements for Physical Protection from Tornado Missiles for safety-related Equipment,As Described in Plant Usar. Revised USAR Pages,Encl U-603146, Application for Amend to License NPF-62,changing TS Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c, 1.d,2.c & 2.d of Table1999-01-20020 January 1999 Application for Amend to License NPF-62,changing TS Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c, 1.d,2.c & 2.d of Table U-603032, Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys1998-10-23023 October 1998 Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys ML20154H8011998-10-0505 October 1998 Application for Amend to License NPF-62,revising TS 5.5.13 to Allow Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) U-603067, Application for Amend to License NPF-65,revising Acceptance Criteria for Meeting ready-to-load Requirement Denoted by TS SR 3.8.1.17 for Division 3 DG1998-08-24024 August 1998 Application for Amend to License NPF-65,revising Acceptance Criteria for Meeting ready-to-load Requirement Denoted by TS SR 3.8.1.17 for Division 3 DG U-603030, Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability1998-08-17017 August 1998 Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability U-603043, Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.201998-07-31031 July 1998 Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 U-602983, Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,Encl1998-05-20020 May 1998 Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,Encl U-602972, Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS1998-05-0404 May 1998 Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS U-602982, Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant1998-04-27027 April 1998 Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant U-602796, Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition1997-07-22022 July 1997 Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition ML20137K8271997-04-0101 April 1997 Application for Amend to License NPF-62,consisting of TS Table 3.3.8.1-1, Loss of Power Instrumentation U-602675, Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership1996-12-13013 December 1996 Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership U-602657, Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items1996-11-19019 November 1996 Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items ML20129E5351996-10-17017 October 1996 Application for Amend to License NPF-62,requesting Consent to Proposed Transfer of Soyland Power Cooperative 13.21% Minority Ownership Interest in Plant to Illinova Power Inc ML20128K0351996-10-0404 October 1996 Revised Application for Amend to License NPF-62,adding Action Statement & Note to TS 3.3.8.1 Requiring Restoration of Inoperable Degraded Voltage Relay U-602624, Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 71996-08-15015 August 1996 Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602587, Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable1996-06-28028 June 1996 Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable ML20113A8781996-06-21021 June 1996 Application for Amend to License NPF-62,allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area,Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures U-602565, Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B1996-05-0101 May 1996 Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B U-602569, Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met1996-04-19019 April 1996 Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met U-602522, Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months1996-02-22022 February 1996 Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months U-602551, Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv1996-02-22022 February 1996 Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv U-602549, Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier1996-02-22022 February 1996 Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier U-602554, Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function1996-02-22022 February 1996 Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function U-602508, Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys1995-12-14014 December 1995 Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys U-602520, Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules1995-12-14014 December 1995 Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules U-602499, Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys1995-12-14014 December 1995 Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys ML20094D1971995-10-27027 October 1995 Application for Amend to License NPF-62,consisting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20094D2081995-10-27027 October 1995 Application for Amend to License NPF-62,consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions U-602463, Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program1995-06-23023 June 1995 Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program U-602454, Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary1995-06-0909 June 1995 Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary U-602417, Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be Operable1995-02-14014 February 1995 Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be Operable U-602406, Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys1995-02-10010 February 1995 Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys U-602376, Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements1995-01-27027 January 1995 Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements ML20078L8831994-11-18018 November 1994 Application for Amend to License NPF-62,requesting Revision of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 U-602364, Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 19921994-10-31031 October 1994 Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 U-602297, Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys1994-08-12012 August 1994 Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys U-602320, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years1994-08-12012 August 1994 Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years U-602316, Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel Generators1994-08-0505 August 1994 Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel Generators U-602303, Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys1994-06-20020 June 1994 Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys U-602272, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period1994-06-13013 June 1994 Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period ML20029C7811994-04-18018 April 1994 Application for Amend to License NPF-62,revising TS 3/4.6.6.3, SGTS & 3/4.7.2, CR Ventilation Sys to Update Rev of ASTM Std Utilized to Periodically Perform Lab Testing of Charcoal Adsorber Samples ML20029C7941994-04-18018 April 1994 Application for Amend to License NPF-62,revising TS 3/4.1.3.1,3/4.1.3.2 & 3/4.10.2 as follow-up to Util 930416 Application to Correct Noted Surveillance Number Refs to Be Consistent W/License Amend 81 Issued 930715 JSP-079-94, Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation1994-02-25025 February 1994 Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation U-602192, Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves1993-12-10010 December 1993 Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves JSP-505-93, Application for Amend to License NPF-62,chnaging Tech Spec 3/4.8.1.1, AC Sources-Operating, Including Requirement of DGs to Insp in Accordance W/Mfg Recommendations for Class of Standby Svc1993-11-0404 November 1993 Application for Amend to License NPF-62,chnaging Tech Spec 3/4.8.1.1, AC Sources-Operating, Including Requirement of DGs to Insp in Accordance W/Mfg Recommendations for Class of Standby Svc JSP-504-93, Application for Amend to License NPF-62,changing Tech Spec 3/4.8.2.1, DC Sources-Operating1993-11-0404 November 1993 Application for Amend to License NPF-62,changing Tech Spec 3/4.8.2.1, DC Sources-Operating 1999-08-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARU-603247, Application for Amend to License NPF-62,re Various Administrative Changes Involving Deletion of Certain License Conditions Currently Contained in OL That Are Obsolete & No Longer Apply1999-08-23023 August 1999 Application for Amend to License NPF-62,re Various Administrative Changes Involving Deletion of Certain License Conditions Currently Contained in OL That Are Obsolete & No Longer Apply ML20210K8281999-07-23023 July 1999 Application for Amend to License NPF-62,consenting to License Transfer & Approving Conforming Administrative License Amend U-603131, Application for Amend to License NPF-62,changing CPS Design Requirements for Physical Protection from Tornado Missiles for safety-related Equipment,As Described in Plant Usar. Revised USAR Pages,Encl1999-03-0101 March 1999 Application for Amend to License NPF-62,changing CPS Design Requirements for Physical Protection from Tornado Missiles for safety-related Equipment,As Described in Plant Usar. Revised USAR Pages,Encl U-603146, Application for Amend to License NPF-62,changing TS Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c, 1.d,2.c & 2.d of Table1999-01-20020 January 1999 Application for Amend to License NPF-62,changing TS Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c, 1.d,2.c & 2.d of Table U-603032, Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys1998-10-23023 October 1998 Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys ML20154H8011998-10-0505 October 1998 Application for Amend to License NPF-62,revising TS 5.5.13 to Allow Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) U-603067, Application for Amend to License NPF-65,revising Acceptance Criteria for Meeting ready-to-load Requirement Denoted by TS SR 3.8.1.17 for Division 3 DG1998-08-24024 August 1998 Application for Amend to License NPF-65,revising Acceptance Criteria for Meeting ready-to-load Requirement Denoted by TS SR 3.8.1.17 for Division 3 DG U-603030, Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability1998-08-17017 August 1998 Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability U-603043, Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.201998-07-31031 July 1998 Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 U-602983, Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,Encl1998-05-20020 May 1998 Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,Encl U-602972, Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS1998-05-0404 May 1998 Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS U-602982, Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant1998-04-27027 April 1998 Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant U-602796, Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition1997-07-22022 July 1997 Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition ML20137K8271997-04-0101 April 1997 Application for Amend to License NPF-62,consisting of TS Table 3.3.8.1-1, Loss of Power Instrumentation U-602675, Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership1996-12-13013 December 1996 Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership U-602657, Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items1996-11-19019 November 1996 Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items ML20129E5351996-10-17017 October 1996 Application for Amend to License NPF-62,requesting Consent to Proposed Transfer of Soyland Power Cooperative 13.21% Minority Ownership Interest in Plant to Illinova Power Inc ML20128K0351996-10-0404 October 1996 Revised Application for Amend to License NPF-62,adding Action Statement & Note to TS 3.3.8.1 Requiring Restoration of Inoperable Degraded Voltage Relay U-602624, Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 71996-08-15015 August 1996 Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602587, Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable1996-06-28028 June 1996 Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable ML20113A8781996-06-21021 June 1996 Application for Amend to License NPF-62,allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area,Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures U-602565, Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B1996-05-0101 May 1996 Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B U-602569, Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met1996-04-19019 April 1996 Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met U-602549, Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier1996-02-22022 February 1996 Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier U-602522, Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months1996-02-22022 February 1996 Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months U-602554, Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function1996-02-22022 February 1996 Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function U-602551, Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv1996-02-22022 February 1996 Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv U-602520, Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules1995-12-14014 December 1995 Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules U-602499, Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys1995-12-14014 December 1995 Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys U-602508, Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys1995-12-14014 December 1995 Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20094D1971995-10-27027 October 1995 Application for Amend to License NPF-62,consisting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20094D2081995-10-27027 October 1995 Application for Amend to License NPF-62,consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions U-602463, Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program1995-06-23023 June 1995 Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program U-602454, Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary1995-06-0909 June 1995 Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary U-602417, Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be Operable1995-02-14014 February 1995 Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be Operable U-602406, Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys1995-02-10010 February 1995 Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys U-602376, Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements1995-01-27027 January 1995 Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements ML20078L8831994-11-18018 November 1994 Application for Amend to License NPF-62,requesting Revision of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 U-602364, Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 19921994-10-31031 October 1994 Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 U-602320, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years1994-08-12012 August 1994 Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years U-602297, Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys1994-08-12012 August 1994 Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys U-602316, Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel Generators1994-08-0505 August 1994 Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel Generators U-602303, Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys1994-06-20020 June 1994 Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys U-602272, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period1994-06-13013 June 1994 Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period ML20029C7811994-04-18018 April 1994 Application for Amend to License NPF-62,revising TS 3/4.6.6.3, SGTS & 3/4.7.2, CR Ventilation Sys to Update Rev of ASTM Std Utilized to Periodically Perform Lab Testing of Charcoal Adsorber Samples ML20029C7941994-04-18018 April 1994 Application for Amend to License NPF-62,revising TS 3/4.1.3.1,3/4.1.3.2 & 3/4.10.2 as follow-up to Util 930416 Application to Correct Noted Surveillance Number Refs to Be Consistent W/License Amend 81 Issued 930715 JSP-079-94, Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation1994-02-25025 February 1994 Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation U-602192, Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves1993-12-10010 December 1993 Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves JSP-505-93, Application for Amend to License NPF-62,chnaging Tech Spec 3/4.8.1.1, AC Sources-Operating, Including Requirement of DGs to Insp in Accordance W/Mfg Recommendations for Class of Standby Svc1993-11-0404 November 1993 Application for Amend to License NPF-62,chnaging Tech Spec 3/4.8.1.1, AC Sources-Operating, Including Requirement of DGs to Insp in Accordance W/Mfg Recommendations for Class of Standby Svc JSP-504-93, Application for Amend to License NPF-62,changing Tech Spec 3/4.8.2.1, DC Sources-Operating1993-11-0404 November 1993 Application for Amend to License NPF-62,changing Tech Spec 3/4.8.2.1, DC Sources-Operating 1999-08-23
[Table view] |
Text
. . . - . ~ . - - - ._. _ - ~ -._~_ -_~~._..- - ._.. - -
a .* Ilknois Power Company
, Chnton Power Station
. P.O. Box 678 Chnton. IL 61727 Tel 217 935 5623 Fax 217 935-4632 John G. Cook Vice President P6WER U-602508 L47 95(12 14 )LP 8E.100a JGC-526-95 December 14, 1995 Docket No. 50-461 10CFR50.90 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Clinton Power Station Proposed Amendment of Facility Operating License No. NPF-62 (NS-95-017)
Dear Sir:
l l
1 Pursuant to 10CFR50.90, Illinois Power (IP) hereby applies for amendment of Facility Operating License No. NPF-62, Appendix A - Technical Specifications, for
. Clinton Power Station (CPS). This request consists of various proposed changes to the Technical Specifications for instrumentation associated with the High Pressure Core Spray System, Reactor Core Isolation Cooling System, and the Residual Heat Removal System.
- A description of the proposed changes and the associated justification (including a Basis For No Significant Hazards Consideration) are provided in Attachment 2. Marked-up copies of the affected pages from the current Technical Specifications are provided in Attachment 3. In addition, marked-up copies of the affected pages from the CPS TS Bases are provided in Attachment 4. Upon approval of this request by the NRC, IP will revise the CPS TS Bases in accordance with CPS TS 5.5.11, " Technical Specification Bases Control Program," to reflect the changes provided in Attachment 4. Further, an aflidavit supporting the facts set forth in this letter and its attachments is provided in Attachment 1.
IP has reviewed the proposed changes against the criteria of 10CFR51.22 for categorical exclusion from environmental impact considerations. The propased change does not involve a significant hazards consideration, or significantly increase individual or
-: r, , . .
1 V 'v U .* /j 9512210129 951214 -
PDR ADOCK 05000461 P PDR ' @v\l }
t
U-602508 i
Page 2 ;
l cumulative occupational radiation exposures. Based on the foregoing, IP concludes that the proposed changes meet the criteria given in 10CFR51.22(c)(9) for a categorical exclusion from the requirement for an Environmental Impact Statement. )
4 Sincerely yours,
)
l l
l
. . Cook Vice President AJP/csm Attachments cc: NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety 1
. _ . . ._~ _. . . .
o . .- ,
Attachment I to U-602508 J. G. Cook, being first duly sworn, deposes and says: That he is Vice President ofIllinois Power; that the application for amendment of Facility Operating License NPF-62 has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge and belief said letter and the facts contained therein are true and correct.
Date: This / day of December 1995.
Signed:
J.G. Cook STATE OF ILLINOIS l SS. l
- l Jeopsine 8.Masdas f fiossymeno,senes ogan,m:s ;;
~30l[# COUNTY J MFoommissionExpiresttrMg7 <
c::::::::::: .:::_ _ . . :
Subscribed and sworn to before me this /Y' day of December 1995.
outbit <J/$rzrIs
/ otary Public) '
a e
, , ,. Attachment 2 to U-602508
. NS-95-017 i Page1 of7 I Dackground This submittal consists of several proposed changes to the Clinton Power Station (CPS)
Technical Specifications (TS) related to instrumentation. The proposed changes are required due to engineering reanalyses or plant modifications. The affected instrumentation includes: (1) steam line flow high channels for the Reactor Core Isolation Cooling (RCIC) System which have been impacted by plant modification, (2) ambient temperature channels in the Residual Heat Removal (RHR) System heat exchanger ;
room (s) which have also been impacted by plant modification, (3) reactor vessel pressure
, channels that provide a permissive for operation of the shutdown cooling mode of the RHR system which have been impacted due to revision of the associated setpoint calculation to address concerns related to NRC Generic Letter (GL) 89-10, " Safety-Related Motor Operated Valve Testing and Surveillance," and (4) RCIC storage tank water level instrument channels which have also been impacted by revision of the associated setpoint calculation.
Description of Proposed Change In accordance with 10CFR50.90, the following changes to the CPS TS are being a proposed:
l j (1) Revise the descriptions for 3.a and 3.i of TS Table 3.3.6.1-1, " Primary Containment and Drywell Isolation Instrumentation," such that the former would be identified as " Auxiliary Building RCIC Steam Line Flow-High" and the latter would be identified as "Drywell RCIC Steam Line Flow-High",
(2) Delete the present Function 3 h, "RHR Heat Exchanger Ambient Temperature -
High" from Table 3.3.6.1 1, (3) Change the Allowable Value as given in Table 3.3.6.1-1 for Function 5.e (" Reactor Vessel Pressure-High") from s 150 psig to s 110 psig, and (4) Change the Allowable Value for Table 3.3.5.1-1, " Emergency Core Cooling System Instrumentation," Function 3.d and Table 3.3.5.2-1, " Reactor Core Isolation Cooling Instrumentation," Function 3 ("RCIC Storage Tank Level-Low")
from 2 0 inches to 2 2.50 inches.
The proposed TS changes are reflected on a marked-up copy of the affected pages from the CPS TS in Attachment 3. (NOTE: The marked-up pages in Attachment l 3 include a mark-up of the heading to Table 3.3.6-1 where the total number of table pages is indicated. The mark-up is a correction to reflect the fact that Table i
I I
_. _ _.- . . - _ - . _ . . _ . . . . _ . , _, m _ , ,
. o- ,,
Attachment 2 f to U-602508 i NS-95-017
( Page 2 of 7 3.3.6.1-1 is comprised of a total of six pages (vice the currently but incorrectly indicated seven pages). This heading change was submitted as part of a previous TS change request (IP letter U-602498 dated October 27,1995) for which approval is pending at the time of this submittal).
Justification for Proposed Change This submittal consists of several proposed changes to the CPS TS related to l instrumentation. The changes are required due to engineering reanalyses or plant l modifications. The affected instrumentation includes: (1) the steam line flow instmment channels that formerly provided a trip of the RCIC system in response to a high steam i flow condition in piping common to the RCIC and RHR systems (for intended use of the steam condensing mode of operation), (2) the ambient temperature channels in the RHR heat exchanger room (s) that currently provide automatic isolation capability for the RHR and RCIC system in the event of a high temperature condition (steam leak) in the room (s),
(3) the reactor vessel pressure instrument channels that provide a permissive for operation of the shutdown cooling mode of RHR, and (4) the RCIC storage tank water level instrument channels that provide a trip for transfer of the RCIC and High Pressure Core l Spray (HPCS) System suctions to the suppression pool in the event oflow water level in the RCIC storage tank. Each of these changes is further discussed below.
1 RCIC Steam Line Flow Instrumentation During the initial licensing of CPS, IP informed the NRC ofits intent to not utilize the steam condensing mode of RHR. Administrative controls were promptly established to preclude its use. Subsequently, a plant modification (RH-033) was implemented to permanently disable the steam condensing mode.' This modification included changes to the piping originally intended to route reactor steam to the RHR heat exchanger from the RCIC steam supply piping. Specifically, the connecting piping (spool pieces) was eliminated and was flanged off within the Auxiliary Building steam tunnel to permanently preclude use of the steam condensing mode for RHR.
The RCIC system is designed such that automatic isolation is effected in the event of a break in the associated steam piping. This capability is provided via flow sensors (flow elbows)in two different locations of the RCIC steam supply piping. One set of sensors is located in the larger-diameter (eight-inch) portion of the RCIC steam supply piping
- upstream of the former connection to the piping from the RHR heat exchanger. Another ;
! set is located downstream of the former RHR/RCIC steam connection where the RCIC steam supply reduces to a smaller diameter (four inches). The steam line flow instrumentation was provided to detect a break of the RCIC steam line and initiate closure of the RCIC steam supply line isolation valves. Originally, the sensors located in the
! eight-inch portion of the RCIC steam supply piping were also designed to effect automatic 1
+
, ,, Attachment 2 to U-602508 NS-95-017 Page 3 of 7 isolation of the RCIC system in the event of a line break in the piping that branched off the RCIC piping to the RHR heat exchanger. To stop steam from continuing to flow out of the break, the isolation is initiated on high flow to thus prevent or minimize damage to the reactor core. Specific credit for this function is not assumed in any USAR accident analyses since the bounding analysis is performed for large breaks such as the reactor recirculation line and main steam line breaks. However, these instruments prevent the RCIC steam line break from becoming bounding.
As noted previously, a plant modification eliminated the branch connection from the RCIC steam supply piping to the RHR heat exchanger which was originally designed to permit the RHR system to be used in the steam condensing mode of operation. It should be noted that evaluation of that plant modification included an evaluation of the upstream and downstream steam line flow sensors and that, despite the climination of the steam flow path to the RHR heat exchanger, this evaluation determined that both sets of flow sensors should remain in place to continue to provide automatic isolation capability for the spectrum ofline breaks that may be postulated to occur in the RCIC steam supply piping in either the eight-inch or four-inch portion of the piping. In addition, the current setpoints are sufficient to perform this safety function. As a result, there is no change to the associated trip setpoints or Allowable Values.
Section 3 of TS Table 3.3.6.1-1 lists the various instrumentation trip Functions for automatic isolation of the RCIC system. The "RCIC Steam Line Flow-High" trip channels are listed as Function "a," and the "RCIC/RHR Steam Line Flow-High" trip channels are listed as Function "i." The RCIC Steam Line Flow-High instrument channels (Function "a") provide the trip that originates from instrument flow channel differential pressure sensing nozzles in the downstream (Auxiliary Building) four-inch RCIC line. The RCIC Steam Line Flow-High" instrument channels (Function "i") provide the trip that originates from instrument flow channel differential pressure sensing nozzles in the upstream (Drywell) eight-inch RCIC line. As noted above, this instrumentation (Functions "a" and "i") is still in place and will continue to monitor RCIC steam flow and provide automatic isolation capability of the RCIC system. Thus, these instrument trip functions need to continue to be listed in Section 3 of Table 3.3.6.1-1. However, because there is no longer steam line piping common to the RCIC and RHR systems, it is inappropriate for the Function "i" to be identified as "RCIC/RHR Steam Line Flow-High" since this instrumentation now only monitors RCIC steam line flow. Merely deleting the "/RHR" portion of the Function description would render Function "i" indistinguishable from Function "a." IP therefore proposes to revise the descriptions for Functions "a" and "i" such that Function "a" would be identified as " Auxiliary Building RCIC Steam Line Flow-High" and Function "i" would be identified as "Drywell RCIC Steam Line Flow-High."
These descriptions are based on the physical location of the flow sensors associated with each trip channel and would bring the TS into conformance with the CPS as-built design (as modified by plant modification RH-033).
e
) .
' Attachment 2 to U-602508 NS-95-017 Page 4 of 7 The RCIC steam line flow trips will continue to operate as before for both trip Functions.
The drywell RCIC steam line flow-high isolation trip as described in Table 3.3.6.1-1 Function "i" will continue to isolate the RCIC system when steam flow through the eight-inch RCIC steam supply line exceeds the trip level. The Auxiliary Building RCIC steam line flow-high isolation trip as described in Table 3.3.6.1-1 Function "a" will continue to 1 isolate the RCIC system when steam flow through the four-inch RCIC steam supply line
- exceeds the trip level. The "Drywell RCIC Steam Line Flow-High" instrument includes -
4 two input channels with each channel in one trip system. Each of the two trip systems is connected to one of the two isolation valves on each RCIC penetration so that operation of either trip system isolates the penetration.> Shutting the primary containment isolation valves upon initiation of a trip signal, in combination with the other accident mitigation systems will limit fission product release during and following a postulated Design Basis Accident.
Ambient Temperature Monitoring Instrumentation Ambient temperature monitoring instrumentation is provided in the RHR heat exchanger room (s) to detect and isolate a leak from the associated RHR piping. Under the original design (that supported use of the steam condensing mode of operation) this trip function would automatically isolate the RHR system as well as the RCIC system in the event of a leak in the RHR heat exchanger room since, during the onset of such a leak, steam could
, be being supplied by the RCIC steam supply piping during the steam condensing mode of l_ operation of the RHR system. Changes made to the plant during plant modification RH-033 as discussed above, have removed the connection from RCIC to RHR. Thus, the RHR ambient temperature isolation signal need only isolate the RHR system since there is no longer a possibility for RCIC piping to leak steam into the RHR room. Accordingly, the RHR ambient temperature isolation trip will be changed to only isolate the RHR supply line when the RHR ambient temperature setpoint is exceeded. Also, as there is no longer a possibility that the RCIC steam supply line can supply any steam to the RHR heat exchanger room, removing the RHR room ambient temperature input will preclude the 1
- - possibility of spurious isolation of the RCIC system due to high temperature in a RHR j heat exchanger room. IP therefore proposes to delete the present Function 3.h, "RHR Heat Exchanger Ambient Temperature - High," from Table 3.3.6.1-1 because of the described piping changes made during plant modification RH-033. High RHR room ambient temperature will continue to isolate the RHR System.
Reactor Vessel Pressure Instrumentation The RHR Shutdown Cooling System, Reactor Vessel Pressure - High Function is provided to isolate the shutdown cooling portion of the RHR system. Since the RHR shutdown cooling system piping is designed for pressures less than rated reactor vessel pressure, the interlock (RHR cut-in permissive) was originally provided for equipment
.. - - - - . = . . . . - - = - - .- .. .- .
. o-l , ,, Attachment 2 l
to U-602508 NS-95-017 Page 5 of 7 protection to prevent an intersystem LOCA, though credit for the interlock is not assumed in the accident or transient analyses in the USAR. The Allowable Value for this interlock is currently specified as s 150 psig per Table 3.3.6.1-1, Function 5.e. However, because of assumptions IP made in response to NRC Generic Letter (GL) 89-10, IP will use a lower Allowable Value for the Reactor Vessel Pressure - High trip function. (The Allowable Value for the RHR cut-in pressure establishes the difYerential pressure at which the RHR suction valves must close in the event of a piping break downstream of the suction valves.) IP thus proposes to change the Reactor Vessel Pressure - High Allowable Value as given in Table 3.3.6.1-1 Function 5.e to s 110 psig. This new Allowable Value is more conservative with respect to considerations for shutting the shutdown cooling I
motor-operated valves and providing protection from overpressurizing the low pressure RHR shutdown cooling system piping.
RCIC Storage Tank Level Instrumentation Low water level in the RCIC storage tank indicates the unavailability of an adequate supply of makeup water from this normal source for the HPCS and RCIC systems.
Normally, the suction valves between HPCS and the RCIC storage tank are open and, upon receiving a HPCS initiation signal, water for HPCS injection would be taken from
, the RCIC storage tank. However, if the water level in the RCIC storage tank falls below a l
preselected level, first the suppression pool suction valve automatically opens, and then the RCIC storage tank suction valve automatically closes. This insures that an adequate supply of makeup water is available to the HPCS pump. The RCIC suction operates in a similar manner using different instmmentation from that described for the HPCS system.
With RCIC storage tank water level within its acceptable limit, a sufficient supply of water exists for injection to minimize the consequences of a vessel draindown event.
Formerly, the Allowable Value for the RCIC storage tank Level - Low Function did not include consideration of the potential for a loss of pump head due to vortexing in the RCIC tank. IP has calculated a more conservative Allowable Value to address this concern. To provide additional margin for this concern, the Allowable Value for the i
RCIC Storage Tank Level-Low instrumentation identified on Table 3.3.5.1-1 Function 3.d and Table 3.3.5.2-1 Function 3.d is being conservatively changed from 2 0 inches to 2 2.50 inches. Although the Allowable Value has been changed, the low level setpoint i remains unchanged. Calculation by IP based on design and actual instmment drift shows that the margin between the new allowable value and the unchanged low level setpoint is adequate. Therefore, the usable volume (125,000 gallons) of the RCIC tank is unchanged.
In addition, no credit is taken for the volume in the RCIC storage tank for the HPCS or RCIC systems in performing their safety-related functions.
e
~
2 . .
Attachment 2 to U-602508 i-
. NS-95-017 j Page 6 of 7 Basis for No Significant Hazards Determination a In accordance with 10CFR50.92, a proposed change to the Operating License (Technical l Specifications) involves no significant hazards considerations if operation of the facility in 1 accordance with the proposed change would not: (1) involve a significant increase in the probability or consequences of any accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The proposed changes are evaluated against each of these criteria below.
, (1) None of the proposed changes involve a significant increase in the probability or consequences of any accident previously evaluated. The changes to Table
- 3.3.6.1-1 Functions 3.a and 3.i are administrative in nature and bring the TS into conformance with the CPS as-built design. The RCIC steam line flow trip i Function names have been changed to reflect the elimination of the RHR steam
' condensing mode. However, these trips have not been physically altered and thus I will continue to operate as before. As a result of the elimination of the RHR steam condensing mode, the possibility of a leak in the RCIC steam supply resulting in an increase in the RHR heat exchanger room ambient temperature has also been eliminated. Accordingly, the RHR ambient temperature isolation trip is changed to only isolate the RHR system when the RHR heat exchanger room ambient temperature setpoint is exceeded. The Shutdown Cooling System Reactor Vessel Pressure - High function is provided to isolate the shutdown cooling portion of the RHR system since this piping is designed for pressures lower than rated reactor vessel pressure. This interlock (RHR cut in permissive) is provided only for equipment protection to prevent an intersystem LOCA scenario and credit for the interlock is not assumed in the accident or transient analysis in the USAR. The
, proposed change to the setpoint (Allowable Value) is conservative with respect to considerations for shutting the RHR shutdown cooling motor-operated valves and providing overpressurization protection for the low pressure RHR shutdown cooling system piping. With respect to the RCIC storage tank water level setpoints, no accident or transient analysis takes credit for the volume of water in the RCIC storage tank. In addition, the setpoint (Allowable Value) has been changed to ensure RCIC system operation is not adversely affected by a low level in the storage tank.
The proposed changes do not affect any of the parameters or conditions that contribute to initiation of any accidents previously evaluated. In addition, the proposed changes do not affect the ability of the associated instrumentation to operate as assumed in the safety analyses. As a result, the proposed changes will not result in a significant increase in the consequences of any accident previously evaluated.
.m.e , -- , , , ,.---..v .- - . . , - ~ .. - - , , . , -,. --v r n.w--m.- . ,- r-- - nm *-r -- - - -----e , v- ,- --
. - . . . - - - . - - - - . - . - - - - . - . . - _ . - - . . . - . . - - . - ~
. c Attachment 2 to U-602508 NS-95-017 Page 7 of 7 4
(2) None of the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed changes for I RHR/RCIC Steam Line Flow - High is administrative in nature and will simply 4 make this item description accurate. The RCIC steam supply line no longer supplies any steam to the RHR heat exchanger room. As a result, the associated isolation of the RCIC system is no longer required. The Shutdown Cooling System Reactor Vessel Pressure - High function will still perform as designed.
The RCIC Storage Tank Level - Low trip will continue to perform in accordance with design. None of the above listed changes willintroduce any new failure modes or changes in plant operation. As a result, the proposed changes cannot create the possibility of a new or different kind of accident from any accident previously evaluated.
(3) None of the proposed changes involve a significant reduction in a margin of safety.
The proposed changes for RHR/RCIC Steam Line Flow - High do not involve a j significant reduction in a margin of safety because the change is administrative in nature and will simply make the descriptions accurate and consistent with ;
completed modifications. The elimination of RCIC system isolation in response to a high RHR room ambient temperature is no longer required due to the elimination of the RHR steam condensing mode. Removing the RHR room ambient temperature isolation of the RCIC will reduce the number of unnecessary isolations of RCIC. The Shutdown Cooling System Reactor Vessel Pressure - High function '
]'
will still perform as designed. The proposed change to the setpoint (Allowable I Value) is conservative with respect to considerations for shutting the RHR shutdown cooling motor-operated valves and providing overpressurization protection for the low pressure RHR shutdown cooling system piping. The Allowable Value for the RCIC Storage Tank Level Storage Tank Level - Low Function has been changed to be more conservative to ensure the RCIC and IIPCS ;
systems will perform their system safety function. No credit is taken for the volume in the RCIC storage tank for the HPCS or RCIC systems in performing their safety-related functions.
Based on the foregoing, IP concludes that this request does not involve a significant hazards consideration.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . -. -. - .-_