Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode
ML20097A192
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/01/1996
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20097A185 List:
References
NUDOCS 9602050204
Download: ML20097A192 (3)


Text

. . . __

I BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of )  :

NEW YORK POWER AUTHORITY ) Docket No. 50-333 l James A. FitzPatrick Nuclear Power Plant ) i APPLICATION FOR AMENDMENT TO OPERATING LICENSE 1

The New York Power Authority requests an amendment to the Technical Specifications  ;

contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick l Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the '

Nuclear Regulatory Commission's regulations.

t l

l This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) ,

proposes to allow reactor coolant system pressure tests to be performed while remaining in  ;

the Cold Shutdown Mode. Primary containment integrity is not required in the Cold Shutdown l Mode thus allowing unrestricted access to the primary containment for the performance of j inspections. The changes will also allow outage activities on other systems to continue. The j changes, with minor exceptions, adopt Special Operations Section 3.10.1, " Inservice Leak and j Hydrostatic Testing Operation," from Standard Technical Specifications (STS), NUREG-1433. '

Minor exceptions are required to ensure consistency within FitzPatrick TS, reflect differences l between FitzPatrick TS and STS, and ensure the same level of ECCS redundancy afforded by

l STS during pressure testing. These exceptions will be eliminated when the FitzPatrick TS are i converted to STS.

Editorial changes to improve the table of contents, relocate text, use consistent terminology, and reflect the addition of new TS pages are also proposed. l l

Attachment I contains the proposed new Technical Specification pages and Attachment 11 is the Safety Evaluation for the proposed changes. Attachment lll is a markup of the affected pages.

l New York Power Authority STATE OF NEW YORK COUNTY OF WESTCHESTER l Subscribed and sworn to before me

/

this / s / day of )h/cuu 1996.

W. J. Cahill, Jr. F Chief Nuclear Officer .  !

l

/

Ih h .

Notary Public'

  • d l 1 l

l GERAl. DINE STRAND Notary Public. State og g,g No. 4991272 E*W 2 a [7 l 9602050204 960201 t

PDR ADOCK 05000333 l p PDR

. i Attachment I to JPN-96-005 REVISED TECHNICAL SPECIFICATION PAGES INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004) l New York Power Authority I JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59

1 LIST OF PAGE CHANGES l l

INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004)

.i 1

Revise Appendix A as follows:  !

Remove Pages insert Pages i i ii ii iil lii 30b 30b i 30c 30c 30d 30d ,

30e 30e  !

30f 30f l 30g 30g 30h 118 118 120 120 121 121 137 137 143 143 148 148 244a 244a 244b i

l 1