ML20102C282

From kanterella
Revision as of 04:59, 28 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Replacing Six Manual Valves W/Eight Solenoid Operated Valves to Provide Capability to Install Hydrogen Recombiner
ML20102C282
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/27/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20102C276 List:
References
NUDOCS 8503050448
Download: ML20102C282 (4)


Text

. .. . . . ..

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

4. CIV-41* iso. CI sys. fr. RB 60 CIV-40
  • 60 CIV-34
  • 60 CIV-35* 60
5. DHV-93 check iso. DH system fr. pzr. NA DHV-91
  • 60 DHV-43 # iso. DH sys. fr. RB sump 120 DHV-42 # 120 DHV-4# & 41# iso. DH sys. fr. RC 120 DHV-6 # iso. DH system from Reactor Vessel 60 DHV-5 # 60
6. DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)* 60
7. FWV-44 check # iso. feedwater from RCSG-1A NA FWV-45 check # NA FWV-43 check # iso. feedwater from RCSG-1B NA FWV-46 check # NA l 8. LRV 87 & 88* iso. H2 recombiner ports from RB NA l LRV 89 & 90* NA

[ LRV 91 & 92* "

NA LRV 93 & 94* NA

9. MSV-130 #(A/B)* iso. MDT-1 from RCSG-1 A 60 l

[

l MSV-148 #(A/B)* iso. MDT-1 from RCSG-1B 60 MSV-411 #

$g[0{D 2 P

CRYSTAL RIVER - UNIT 3 3/46-18

TACLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

10. MUV-40 (A)* iso. MU system from RC 60 l MUV-41 (A)* 60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 60 MUV-258 60 MUV-253 60 MUV-163 check # open during HPI and closed dur. NA nor. operation MUV-25 60 MUV-164 check # NA MUV-26 # 60 MUV-160 check # NA MUV-23 # 60 MUV-161 check # NA MUV-24 # 60 MUV-27 # open dur nor, operation and closed during RB Isolation 60
11. SWV-39 # iso. NSCCC from AHF-IC 60 l

SWV-45 # 60 SWV-35 # iso. NSCCC from AHF-1 A 60 SWV-41 # 60 SWV-37 # iso. NSCCC from AHF-1B 60 SWV-43 # 60 SWV-48 #

  • iso. NSCCC from MUHE-1A & IB and WDT-5 60 SWV-47 #
  • 60 SWV-49 #
  • 60 SWV-50 #
  • 60 SWV-80 # iso. NSCCC from RCP-1A 60 SWV-84 # 60 SWV-82 # iso. NSCCC from RCP-lC 60 SWV-86 # 60 SWV-81 # iso. NSCCC from RCP-ID 60 SWV-85 # 60 SWV-79 # iso. NSCCC from RCP-1B 60 SWV-83 # 60 SWV-109 # iso. NSCCC from DRRD-1 60 SWV-Il0 # 60 CRYSTAL RIVER - UNIT 3 3/46-19

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

12. WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3 (A) "

60 WDV-60 (A)* iso. WDT-4 from WDT-5 60 WDV-61 (B)* 60 WDV-94 (A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-406 (A)* iso. waste gas disposal from 60 vents in RC system WDV-405 (B)* "

60

13. WSV-3 iso. containment monitoring 60 system from RB l WSV-4 "

60 WSV-5 "

60 WSV-6 "

60 B. CONTAINMENT PURGE AND EXHAUST

1. AHV-IC (A) iso. pur. sup. system fr. RB 60 AHV-ID (B) 60 AHV-1B (A) iso. pur. exhaust system fr. RB 60 AHV-1 A (B) 60 C. MANUAL
1. IAV-28 iso. IA from RB NA IAV-29 "

NA

2. LRV-50 iso. leak rate test system fr. RB NA LRV-36 NA CRYSTAL RIVER - UNIT 3 3/4 6-20

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

LRV-45 iso. LR test panel from RB NA LRV-44 NA LRV-46 NA

3. MSV-146 # iso, misc. waste storage NA tank from RCSG-1B MSV-128 # NA l
4. NGV-62 iso. NG system from steam NA generators NGV-81 # NA NGV-82 iso. NG system from pzr. NA
5. SAV-24 iso. SA from RB NA SAV-23 & 122 NA
6. SFV-18 iso SF system NA SFV-19 NA SFV-Il9 # iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 # NA 7 WSV-1 iso. containment monitoring NA system from RB WSV-2 NA D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA CRYSTAL RIVER - UNIT 3 3/4 6-21