ML20076K762

From kanterella
Revision as of 08:26, 26 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1983
ML20076K762
Person / Time
Site: Crystal River 
Issue date: 08/01/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20076K758 List:
References
NUDOCS 8309150262
Download: ML20076K762 (1)


Text

- -

we.m c'M

^

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 8/1/83 COMPLETED BY D- %grt .

TELEPHONE (0041 795-6486 OPERATING STATUS Notes Net Electrical Energy

1. Unit Name: Crvstal River Unit #3 generated for July was
2. Reporting Period: 7/1/83 - 7/31/83 wrong. Corrections are 2544 circled.
3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 850 811
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe): 79.92% FP
10. Reasons For Restrictions,1f Any: RCP-lC seal is bad.

O This Month Yr..to.Date Cumulative 744 5087 55967 i1. Hours In Reporting Period 170.9 2030.2 34237.4

12. Number Of Hours Reactor Was Critical 0 0 1280.3
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 11R 1 1077 4 11444.1
15. Unit Re crve Shutdown Hours 0 0 0
16. Gross Thermal Energy Gencrated (MWH) 122161 4610565 75135520 -

37450 _ 1611346 25577963

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) (32573 3 (T534R263 M 970 C
19. Unit Service Factor 15.9% 38.9% 59.8%.

15.9% 38.9% 59.8%

20. Unit Avai! ability Factor 5.4% 37.2% 55.0%
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 5.3% 36.6% 52.6%

7.1% 0.5% 24.9%

l 23. Unit Forced Outage Rate l 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

Maintenance outace to replace RCP-1C seal package scheduled for October 1 to last 11 days. - S - .

. g-

25. If Shut Down At End Of Report Period Estimated Date of Startup: N/A >

l

) 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved l

" INITIAL CRITICALITY l/14/77-n l E INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8309150262 830912 PDR ADOCK 05000302 (9/77)

R PDR '

c i

E , ^ w yr aqsp . ]k h -h )" A P ,

,a

-