ML20078R594

From kanterella
Revision as of 11:27, 24 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Requiring Sampling of Secondary Coolant Sys for Radioactivity on Weekly Basis & Deletion of Requirement for Secondary Radiation Detector
ML20078R594
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 12/14/1994
From:
RHODE ISLAND, STATE OF
To:
Shared Package
ML20078R589 List:
References
NUDOCS 9412270113
Download: ML20078R594 (1)


Text

. - , ~ _ ._

, :a a e

-e' TECHNICAL SPECIFICATIONS

'Rhode Island Nuclear Science Center Docket 50-193, License R-95

, Revision 1 I

Annual pool . system inspections are made to provide assurance that other cooling system components (eg. gate valves, gasketing etc.) are functioning properly.
b. Secondary Coolant System  ;

Applicability: ,

This specification applies to the surveillance of the secondary coolant water.

Objective:

To assure the conditions of the coolant meet specification 3.3.(b) and to detect a primary to secondary water leak.

Specification:

1. The pH shall be measured weekly during reactor operation.

t

2. A sample shall be drawn weekly and analyzed for sodium-24 activity, during reactor operation.

Bases:

Proper secondary coolant conditions - are obtained by blowdown and makeup water systems which maintain the proper water quality pH. Radioactive concentrations are measured in accordance with written procedures.

1I I

1 l

l Page 42 Auendment No. 19 9412270113 941214 PDR ADOCK 05000193 1 p PDR