ML20217R360
| ML20217R360 | |
| Person / Time | |
|---|---|
| Site: | Rhode Island Atomic Energy Commission |
| Issue date: | 08/20/1997 |
| From: | RHODE ISLAND, STATE OF |
| To: | |
| Shared Package | |
| ML20217R358 | List: |
| References | |
| NUDOCS 9709050096 | |
| Download: ML20217R360 (3) | |
Text
_
?.-
- J TECHNICAL SPECIFICATIONS Rhode -1sland Nuclear Science Center Docket 50193, License R 95 -
Revision 1 reactor operation, _ fuel movement and handling _ off radioactive materials in the reactor building.
Objective:
To assure - that - radiation monitoring. equipment is available-for evaluation-of radiation conditions and - that the release of airborne radioactive material is maintained below the limits established in 10CFR20.
Specification:
1.
When the reactor is operating, gaseous. and particulate sampling of the stack effluent shall be monitored by a stack monitor with a readout _ in the control room.
The particulate activity monitor _ and the gaseous. activity monitor for the facility _
~
exhaust stack shall-be operating.
If either unit is' to be. out 'of service, either the reactor shall be shut down or the unit shall be replaced by one of comparable -
monitoring capability:
2.
When the reactor is operating,. at least one-constant -- air monitoring unit (Table - 3.2.11) located. in the. confinement-building shall. be-operating.
Temporary shutdown of: this unit shall be limited as in 3.7.1 above.
3.
The reactor shall-not be continuously
- operated -without. a minimum of one area radiation monitor (Table 3.2.8) on the-experimental level of the reactor building and one area monitor (Table 3.2.6) over the reactor - pool (reactor. bridge) operating and capable - of _ warning personnel of high radiation : levels, 9709050096 970820 PDR ADOCK 05000193 Page 29 Admendment 24
=P' PDR
j y
l TECHNICAL SPECIFICATIONS 3
Rhode Island Nuclear Science Center -
Docket 50193, License R 95 Revision 1~
l.
The reactor will be shut down-and reactor operations will - not be resumed until authorization is obtained from the NRC.'
j 2.
Immediate. notification shall be made to the NRC in accordance with paragraph 6.8 'of these specifications-c-
and to the-Director.
3.
A prompt report shall be prepared by the Senior Reactor Operator.
The report shall include. a complete analysis of the causes' of the event and the extent of possible damage together with recommendations to-prevent or' reduce the probability - of recurrence.
This report shall be submitted to the NRSC for review and appropriate
- action, and a
suitable similar report shall be submitted to the NRC in accordance -with Paragraph 6.8 of these specifications and in support of-a request for. authorization for resumption of _ operations.
6.8 Reporting Requirements.
t In addition to the regt%ments of.-applicable regulations, all 4
written - reports shall be sent to the U. S. Nuclear Regulatory Commission, Attn:
Document Control Desk, Washington, DC 20555, with a _ copy to the Region I Administrator.
The written reports include - the following:
1.
Within-24 hours, a; report by telephone through - the NRC Operations Center, Washington, DC and the NRC Region 1:
a.
Any accidental-release of radioactivity to unrestricted areas above permissible
- limits, whether or not the release resulted -in property damage, personal injury or exposure, b.
Any significant variation of measured values from a corresponding predicted or previously measured value of safety related operating characteristics occurring during operation of the reactor.
Page 62 Admendment 24
,, e : c, -
' TECllNICAL SPECIFICATIONS-t: 4 ;i ' ' ' _. ;
Rhode Island Nuclear Science Center Docket-50-193, License R 95 Revision 1
- g.. --Fuel inventories and transfers; and h.
Changes ; tot procedures-; systems, components, Land equipment, _
2.
~ Records to be retained for the life of the _ facility:
a.
Gaseous and' liquid radioactive Jeffluents released to the environs;
- b. -. Off-site environmental monitoring surveys; c.
- Personnel radiation exposures; d..
Updated, "as-built" drawings - of the facility; and-e.
Minutes of the NRSC- (and previous Reactor Utilization Committee) meetings.
Page 66' A'dmendment 24 I
,.__-m
-tm
---A---m-
'*"?-
- P' 7'**