Application for Amend to Licenses DPR-51 & NPF-6,changing Radiological Effluent Tech Specs.Updated Offsite Dose Calculation Manual & Solid Waste Control Program Encl
ML20084J232
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/13/1984
From: Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
To: John Miller, Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20084J234 List:
References
0CAN04808, CAN4808, NUDOCS 8405090042
Download: ML20084J232 (4)


Text

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (501) 371-4000 April 13, 1984 OCANO48408 Director of Nuclear Reactor Regulation ATTN: Mr. J. F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 Director of Nuclear Reactor Regulation ATTN: Mr. James R. Miller, Chief Operating Reactors Br anch 43 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Arkansas Nuclear One - Units 1 &2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Proposed Technical Specification Chagge_Bevisigg_;_@pgegdig_1_1BEISl Gentlemen:

As requested by your Mr. Bob Lee, the purpose of this letter is to provide NRC with the enclosed submittals:

1. Updated ANO-1 Radiological Effluent Technical Specifications (ANO-1 RETS) Change Request;
2. Updated ANO-2 Radiological Effluent Technical Specifications (ANO-2 RETS) Change Request;
3. Updated Offsite Dose Calculation Manual (ODCM) for Arkansas Nuclear One;
4. Solid Waste Process Control Program (PCP) for Arkansas Nuclear One.

()

8405090042 840413 'Si PDR ADOCK 05000 P

MEMBEA MIDOLE SOUTH UTIUTIES SYSTEM

w. _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .______________._.m

Mr. Stolz/Mr. Miller 2 April 13, 1984 It is AP&L's intent that Enclosures 1, 2, and 3 supercede our September 30, 1983, submittal (OCANO98310). Additionally, Enclosure 4 is intended to be a descriptive overview or

" umbrella" document which provides controlled guidance on the appropriate handling of solid radwaste at ANO. Any deviations from or changes to the Process Control Program are to be approved by the ANO Plant Safety Committee prior to the implementation of the deviation or change.

Enclosure 5 provides an overview of the NRC's requested revisions to the ANO-1 and 2 RETS submittal. Compliance with the Process Control Program as described in Enclosure 4 herein will ensure that the major elements of the model Technical Specifications

-referenced above are adequately addressed. Proposed ANO-1 Technical Specifications 6.8.1h and proposed AND-2 Technical Specification 6.8.1i provide for required implementation of the PCP. Also, as presently written, provisions for surveillance requirements are contained within the body of the PCP.

Therefore, we feel that the intent of specifications such as 6.13 and 6.15 is adequately addressed by Enclosure 4 and such specifications would be inconsistent with other ANO-1&2 Technical Specifications.

As agreed with your staff the reduced dose commitments and dose rates as proposed in Enclosures 1 and 2 are contingent on the use of the methodology and various numerical factors as defined in the enclosed ODCM (Bioaccumulation Factor, Reactor Building Purge Factor, etc.). These revisions to the ODCM (Enclosure 3) were the result of negotiation with the NRC staff during the RETS revision process.

Additionally, per our discussions with the NRC staff, AP&L was requested to provide NRC with a requested implementation date for the ANO-1&2 RETS. Provided the NRC approves by June 30, 1984, both the ANO-1 and ANO-2 RETS as proposed in Enclosures 1 and 2 herein, AP&L could commit to a January 1, 1985, effective date f or RETS implementation at ANO. Our basis for this date is:

1) the logistics of implementing RETS would be better served if the effective date was at the beginning of a calendar year, in as much as new criteria would be applied to calendar year annual dose calculations and;
2) we currently need at least six (6) months lead time to procure, develop and implement the necessary software to support the RETS programs as proposed.

Mr. Stolz/Mr. Miller 3 April 13, 1984 Since these are revisions to previous AND-1842 Technical Specification Change Requests submitted before the Sholly amendment procedures went into effect, no Significant Hazards Consideration determination is provided. Also, since these are revisions to change requests currently under NRC review, no further fee is remitted.

Very truly yours, John M. Griff n, Sr. Vice President Energy Supply JMG:DET:jte Enclosures (5)

STATE OF ARKANSAS )

) SS COUNTY OF PULASKI )

I, John M. Griffin, being duly sworn, subscribe to and say that I am Senior Vice President, Energy Supply for Arkansas Power & Light Company; that I have full authority to execute this oath; that I have read the document number OCANO48408 and know the contents thereof; and that to the best of my knowledge, information and belief the statements in i t are true.

d John M.

SUBSCRIBED AND SWORN before me, a Notary Public in and for the County and State above named, this _ h b ay of __ ____ ____,

1984, a

Notary Public My Commission Expires:

19-23_____