MONTHYEARML20087E7911992-01-15015 January 1992 NPDES Noncompliance Notification for Dec 1991.Several Boron & Sodium Nitrate & Residual Chlorine Concentration Discharges Occurred During Month of Dec 1991 Prior to Entering Cape Cod Bay.Levels Lowered ML20133P9511985-08-0606 August 1985 NPDES Noncompliance Notification:On 850731,1,000-2,000 Juvenile River Herring & Adult Atlantic Silversides Observed Showing External Symptoms & Behavioral Characteristics of Gas Bubble Disease.Gas Saturation Measurements Taken ML20133M0391985-08-0505 August 1985 NPDES Noncompliance Notification:On 850630,malfunction of Sanitary Septic Sys Automatic Pumps & High Level Warning Lights Occurred.Sys Overflowed to Storm Drains.Investigation Underway.Septic Sys Repaired ML20206K4851975-10-28028 October 1975 NPDES Noncompliance Notification:During Second Quarter of 1975,notification Point of 0.5 Ci/Reactor for I-131 Exceeded.Cause Under Investigation.Program Defined & Initiated to Reduce Release Rates ML20206K4441975-07-30030 July 1975 NPDES Noncompliance Notification:During Second Quarter of 1975,notification Point of 0.5 Ci/Reactor Surpassed.Total Amount of I-131 Released Was 0.558 Ci.Cause Under Investigation.Program Initiated to Reduce Release Rates 1992-01-15
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20217P4311999-09-30030 September 1999 NPDES Discharge Monitoring Rept for Sept 1999 for Pilgrim Nuclear Power Station. with ML20212B3991999-08-31031 August 1999 NPDES Discharge Monitoring Rept for Aug 1999 for Pilgrim Nuclear Power Station. with ML20211B3901999-07-31031 July 1999 NPDES Discharge Monitoring Rept for July 1999 for Pilgrim Nuclear Power Station. with ML20209J0011999-06-30030 June 1999 NPDES Discharge Monitoring Rept for June 1999 for Pilgrim Nuclear Power Station. with ML20195J5681999-05-31031 May 1999 NPDES Discharge Monitoring Rept for May 1999 for Pilgrim Nuclear Power Station. with ML20206R5451999-04-30030 April 1999 Discharge Monitoring Rept for Pilgrim Nuclear Power Station for Apr 1999. with ML20205L2841999-03-31031 March 1999 NPDES Discharge Monitoring Rept for Mar 1999, for Pilgrim Nuclear Power Station.With ML20204F6621999-02-28028 February 1999 NPDES Discharge Monitoring Rept for Pilgrim Nuclear Power Station, for Month of Feb 1999.With ML20203C4521999-01-31031 January 1999 NPDES Discharge Monitoring Rept for Jan 1999 for Pilgrim Nuclear Power Station. with ML20199K6651998-12-31031 December 1998 NPDES Discharge Monitoring Rept for Pilgrim Nuclear Power Station for Dec 1998. with ML20206P1191998-12-31031 December 1998 Radioactive Effluent & Waste Disposal Rept,Jan-Dec 1998. with ML20206Q0681998-12-31031 December 1998 Radiological Environ Monitoring Program Rept 31 for Jan-Dec 1998. with ML20205S2991998-12-31031 December 1998 Marine Ecology Studies Related to Operation of Pilgrim Station Semi-Annual Rept Number 53,Jan-Dec 1998. with ML20206Q7771998-11-30030 November 1998 Rev 5 to Pilgram Station Evacuation Time Estimates & Traffic Mgt Plan Update ML20206N8291998-11-30030 November 1998 NPDES Discharge Monitoring Rept for PNPS for Nov 1998.With ML20195G7971998-10-31031 October 1998 Discharge Monitoring Rept for Pilgrim Nuclear Power Station for Oct 1998 ML20154M1691998-09-30030 September 1998 NPDES Discharge Monitoring Rept for Sept 1998 for Pilgrim Nuclear Power Station. with ML20153A9831998-08-31031 August 1998 NPDES Discharge Monitoring Rept for Aug 1998 for Pilgrim Nuclear Power Station. with ML20237A7751998-07-31031 July 1998 NPDES Discharge Monitoring Rept for July 1998 for Pilgrim Nuclear Power Station ML20236R3091998-06-30030 June 1998 NPDES Discharge Monitoring Rept for June 1998 for Pilgrim Nuclear Power Station ML20154M1201998-06-30030 June 1998 Marine Ecology Studies Re Operation of Pilgrim Station, Semi-Annual Rept 52,Jan-June 1998. with ML20249A0551998-05-31031 May 1998 NPDES Discharge Monitoring Rept for Pilgrim Nuclear Power Station for May 1998 ML20247M6831998-04-30030 April 1998 Discharge Monitoring Rept for Pilgrim Nuclear Power Station for Apr 1998 ML20216J7241998-03-31031 March 1998 NPDES Discharge Monitoring Rept for Mar 1998 ML20217A8581998-02-28028 February 1998 1998 Discharge Monitoring Rept for Pilgrim Nuclear Power Station ML20203C0421998-01-31031 January 1998 NPDES Discharge Monitoring Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20216G6201997-12-31031 December 1997 Personnel Whole Body Exposure for CY97 ML20217N5511997-12-31031 December 1997 Annual Dose Assessment to General Public 970101-1231 ML20203J3471997-12-31031 December 1997 Radioactive Effluent & Waste Disposal Rept Including Meteorological Data,Jul-Dec 1997 ML20198S5481997-12-31031 December 1997 NPDES Discharge Monitoring Rept for Dec 1997, for Pilgrim Nuclear Power Station ML20203J1401997-12-31031 December 1997 Number of Personnel & Man-Rem by Work & Job Function, for 1997,IAW Requirements of Pilgrim Nuclear Power Station TS Section 6.9.A.3 ML20217N6091997-12-31031 December 1997 Radiological Environ Monitoring Program Rept No 30 for Jan-Dec 1997 ML20247F2551997-12-31031 December 1997 Marine Ecology Studies Re Operation of Pilgrim Station Semi-Annual Rept 51 Jan-Dec 1997 ML20197A7411997-11-30030 November 1997 NPDES Discharge Monitoring Rept for Nov 1997 ML20199H1611997-10-31031 October 1997 NPDES Discharge Monitoring Rept for Oct 1997 ML20217K4901997-09-30030 September 1997 NPDES Discharge Monitoring Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20217B0311997-08-31031 August 1997 NPDES Discharge Monitoring Rept for Aug 1997 ML20141J5071997-07-31031 July 1997 NPDES Discharge Monitoring Rept for Jul 1997 ML20216C9611997-06-30030 June 1997 Radioactive Effluent & Waste Disposal Rept Including Meteorological Data,Jan-June 1997 ML20149J0891997-06-30030 June 1997 NPDES Discharge Monitoring Rept for June 1997 ML20212C5771997-06-30030 June 1997 Marine Ecology Studies Re Operation of Pilgrim Station Semi-Annual Rept 50 Jan-Jun 1997 ML20141C6121997-05-31031 May 1997 NPDES Discharge Monitoring Rept for May 1997 ML20141G1701997-04-30030 April 1997 NPDES Discharge Monitoring Rept for Apr 1997 ML20138A3061997-03-31031 March 1997 NPDES Discharge Monitoring Rept for Mar 1997 ML20137B8901997-02-28028 February 1997 NPDES Discharge Monitoring Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20134M5961997-01-31031 January 1997 NPDES Discharge Monitoring Rept for Jan 1997 ML20137M6021996-12-31031 December 1996 Annual Dose Assessment to General Public 960101-1231 ML20140J4201996-12-31031 December 1996 Marine Ecology Studies Re Operation of Pilgrim Station Semi-Annual Rept 49 Jan-Dec 1996 ML20138Q6841996-12-31031 December 1996 Radioactive Effluent & Waste Disposal Rept Including Meteorological Data for 1996. W/ ML20138F3211996-12-31031 December 1996 Radiological Environ Monitoring Program Rept No 29,Jan-Dec 1996 1999-09-30
[Table view] |
Text
_
i .
H BOSTON EDISON 25 Braintree Hill Otheo Park Braintree, Massachusetts 02184 January 15, 1992 kdhTsf Nuclear Engineerino BECo 5.92-008 NPDES Program Operations Section (W:P)
Environmental Protection Agency P. O. Box 8127 Boston, MA 02114 Massachusetts Division of Ha&^r Pollution Lakeville Hospital Lakeville, MA 02346 DISCHARGE MONITORING REP 0F1
Dear Sirs:
Enclosed is the Discharge Monitoring Report for Pilgrim Huclear Power Station (PNPS), NPDES Permit Number HA0003557 (Federal) and Number 359 (State).
The period covered by this report is December 1991.
/ . . Hag
~
RDA/ cab /6438 Attachments: 1. Summary
- 2. Discharge Monitoring Report cc: U. S. Necleai Regulatory Commission Document Control Desk Hashington, DC 20555 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road ~
K9g of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station 9201220154 920115 PDR A00CK 05000293-S PDR {Qf
. , l ATTACHMENT 1 TO BECO LETTER 5.92 008
SUMMARY
PILGRIM I DISCHARGE HONITORING REPORT s
In accordance with the Federal Clean Hater Act, as amended (33USC 1251 e.1 Leg: ,
the "CHA"), and the Massachusetts Clean Water Act, as amended (H.G.L.; Chap. 4 21, 26-53), regarding effluent limitations, mc.nitoring requirements and other conditions set forth in the Pilg'im NPDES Permit (Federal Permit Number HA0003557, and State Permit Number 359), parts I and II. the following information is submitted for the period December 1991.
I. Discharae Points Covered in this Report Discharae Point Discharge Identification 001 Condenser Cooling Hater 002 Thermal Backwash for Blofouling Control 003 Intake Screen Hash 004, 005, 006, and 007 Yard Drains (April and September) 010 Service Cooling Hater l 011 Hakeup Hater and Demineralizer Haste Discharge .
II. Summary and Notes of Disiharae Reoort .
A. The flow at points 001 and 010 are calculated from system pump capacity and are equal to the total for all pumps in each system running at full capacity for-a 24-hour period. The flow at point 011 is measured by noting sump levels before and after discharge. Flow at point 002 is a conservative figure obtained by calculating flow it backwashing took place for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Flow at point 003 is calculated from system pump capacity and mean operating time.
B. The temperaturns at points 001 and 002 are measured by resistance temperature detectors (RTD's).
C. Periodically, total residual chlorine (TRC) concentration in the service cooling water (010) exceeds Permit requirements (0.50 ppm daily average TRC and 1.00 ppm daily maximum TRC) prior to mixing with any other stream, primarily because of the number of service water L pumps in operation. Chlorine injection levels are lowered as a f corrective measure. The dilution provided by the PNPS circulating L
water flow keeps total residual chlorine concentrations discharged to j Cape Cod Bay below the NPDES Permit limit of 0.1 ppm.
l l-
l D. Intake traveling water screens were operated with dechlorination I pumps operating. I E. Sawdust was applied to seek and seal PNPS condenser leaks on ,
December 1 (960 pounds), 2 (1,000 pounds), 3 (200 pounds), 10 (1,280 pounds),_12 (520 pounds), 13 (800 pounds), 15 (600 pounds) ,
and 17 (360 pounds) 1991, j F. The following boron and sodium nitrite discharges (ppm) occurred in December 1991 from discharge point #001. All discharges were below NPDES Permit limits prior to entering Cape Cod Bay.
Date Gallons Concentration Concentration Discharaed Discharced Before DischgLqe Discharaed Boron 12/10 13,026 0.11 <0.001 12/14 12,692 <0.05 <0.001 12/28 12,024 0.09 <0.001 Sodium Nitrite 12/10 13,026 20.0 0.026 12/14 12,692 <20.0 <0.026 12/28 12,024 24.4 0.032 G. On December 10, 1991 a telephone call (BECo Telecon 4.91.031) was made to USEPA to inform them of a discharge, residual chlorine ,
concentration violation between 1235 and 1305 on 12/8/91. The discharge chlorine limit of 0.1 ppm was exceeded for a total of 30 minutes during this period with a maximum of 0.22 ppm being r recorded. l H. The Pilgrim Station 1992 Environmental Honitoring. Thermal ;
Discharge Fish Surveillance, and Dissolved Nitrogen Saturation l Reduction Program and Plans were submitted to the USEPA and Hass.
l Div. of Hater Pollution Control on December 16, 1991 in L conformance with the NPDES Permit #HA0003557 (BECo Letter 5.91.121).
. 4 l
L l
- I ATTACHMENT 2 TO BECO LETTER 5.92 008 1
DISCHARGE MONITORING REPORT r
Ii .
}?
I:
s.
f-1 e
.~
i s
.g.
n 1:
l '.
t i
i
_l i,
p i l
--N.- - - -
= - m - ege
~ v