ML20203J140

From kanterella
Jump to navigation Jump to search
Number of Personnel & Man-Rem by Work & Job Function, for 1997,IAW Requirements of Pilgrim Nuclear Power Station TS Section 6.9.A.3
ML20203J140
Person / Time
Site: Pilgrim
Issue date: 12/31/1997
From: Desmond N
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.016, RTR-REGGD-1.016 BECO-#2.98.022, NUDOCS 9803030430
Download: ML20203J140 (3)


Text

, ..

TCCh Spec 6.9.A 3 O Reg. Guide 1,16 8'wfore Ecssor, Pugnm Nuclear Power Station Rocky Hill Road P'ymouth. Massachusetts 02360 5599 Nancy L Desmond Regulatory Relations Group Manager hbruary 27, 1998 BECo Ltr. 2.98.022 U.S. Nuclear Regulatory Coriimission Attn: Document Control Desk Washington, DC 20555 Docket No. 50 293 Licensa No. DPR 35 The enclosed table," Number of Personnel and Man Rem by Work and Job Function", for the year 1997 is submitted in accordance with the requirements of the Pilgrim Nuclear Power Station Technical Specification (T.S.), Section 6.9.A.3, and as recommended by U.S. NRC Regulatory Guide 1.16.

The total dose measured by self indicating dosimeter (SID) was 584.232 man rem. SID measurements are used for tracking dose assigned to job functions. As required by T.S.

6.9.A.3, at least 80% of the total whole body dose received from extemal sources was accountad for via radiation work permits assigned to :;pecific major work functions.

Please do not hesitste to contact me directly if you have any questions, b

N.L Desmond RLC/deg/2980:2/ttra 2

Enclosure:

Number of Personnel and Man Rem by Work and Job Function ec: Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road -

gh King of Prussia, PA 19406 Sr. Resident inspector - Pilgrim n

l 9

  • i NUM2ER OF PERSONNEL AND MAN-REM CY WORK AND JOB FUNCTION [

ALL PERSONNEL

  • TOTAL MAN-REM " '

! i Station Utility Contractors Station Utility Contractors l WORK & JOB FUNCTION Empicyees Employees and Othen Employees Empkwees and Others i

REACTOR OPERATION &

SURVEILIANCES

-Maintenance 46 10 43 2.495 0.108 1.604  :

-Operations Personnel 69 2 74 3' ~427 0.370 2.574

-Health Physics 17 0 9 0.541 0.000 0.104 ,

-Supervisory Personnel 23 3 5 1.441 0.226 0.136 i

-Engineering Persvanel 18 2 5 1.995 0.051 0.348 ROUTINE MAINTENANCE

-Maintenance 168 58 914 61.070 I1.788 115.420 i

-Operations Personnel 100 7 125 11.485 0.041 6.426 ,

-Health Physics 4: 3 120 15.322 0.087 23.790 ,

-Supervisory Personnel 108 15 81 13.429 1.027 1.760

-Engineering Personnel 114 27 120 6.072 0.931 8.049 i INSERVICE INSPECTION

-Maintenance 42 7 291 3.036 0 226 53.175

-Operations Personnel 21 0 3 1.246 0.000 0.153 ,

-Health Physics 10 0 9 0.799 0.000 0.306

-Supervisory Personnel 9 4 7 0.232 0.038 1.423

-Engineering Personnel 19 2 26 1.418 G.166 5.339 SPECIAL MAINTENANCE"*

-Maintenance 75 13 469 5.943 1.123 118.139

-Operations Personnel 23 1 13 0.594 0.002 0.263

-Health Physics 1I O 26 0.998 0.000 4.164

-Supervisory Personnel 25 6 27- 0.799 0.123 8.138

-Engineering Personnel 29 8 36 L151 0.253 7.920  !

a Au FERSONNEL 'IvrAL MAN-REM .. y Station Utility Contractors Station Utility Contractors .

WORK & JOB FUNCTION E... A;w Eu,A,w and Others E.,A,a E A;w and Others-l - WASTE PROCESSING ,.

j~ -Maintenance 28 6 13 0.230 0.024 0.090

-Operations Persmnel 20. 1 3 1.757 0.120 0.475

-Health Physics 18 0 8 0.266 0.000 0.073

-Supervisory Personnel 1 0 0 0.145 0.000 0.000

-Er@amLg Personnel 2 0 1 0.243 0.000 0.047 r

l REFUELING -

-Maintenance 53 35 126 3.408 9.034 14.011

-Operations Personnel 38 1 7 0.695 0.001 0.757

-Heahh Physics 10 0 34 0.791 0.000 5.435 j

-Supervisory Personnel 23 3 9 1.289 0.002 0.426 l

-Ergir~m'ug Personrr3 23 3 26 1.652 0.079 3.993 i i i

TOTALS BY JOB FUNCTION i 1 -Maintenance 412 129 1856 76.183 22303 302.439 L -Operations Personnel 271 12 225 49.104 0.534 10.648

-Health Physics 112 3 206 18.717 0.087 33.872  ;

-Supervisory Personnel 189 31 129 17337 1.416 11.884

-Ergiracing Personnel 205 41 214 12.530 1.481 25.696 I!89 216 2630 __173.872 25.821 384.539 GRAND _ TOT _ALS** - _ _ _ _

t

  • Workers may be counted in more than one category.

4

" Total dose by self-iridimirg dosimeter is 584.232 REM. Actual record dose (y TLD is 587.072. TotalN doseis 588383 REM.

i t

I Generic Letter 89-10 MOV Modifications.

j ECCS Strainer Upgrade.

j Electrical Drywell Penetration Upgrades.

Inspection of Abandoned Radwaste Equipment.

1 Test Spent Fuel Storage Racks for Boradex Stability.

._. . -. _ _.