ML20069D159
From kanterella
ML20069D159 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 08/20/1982 |
From: | Selan J LAWRENCE LIVERMORE NATIONAL LABORATORY |
To: | NRC |
Shared Package | |
ML20069D164 | List: |
References | |
CON-FIN-A-0250, CON-FIN-A-250 UCID-18689, UCID-18689-R01, UCID-18689-R1, NUDOCS 8209130461 | |
Download: ML20069D159 (13) | |
Similar Documents at Pilgrim | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20212J2601998-03-31031 March 1998
[Table view]Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final Rept L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station1996-06-30030 June 1996 TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station ML20128K2061996-05-31031 May 1996 Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final Rept ML20128K2131996-04-11011 April 1996 Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final Rept ML20128K1871996-04-0909 April 1996 Pilgrim,Technical Evaluation Rept on IPE Front End Analysis L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant1994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant ML20044E7391993-06-23023 June 1993 Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. ML20116J6851992-10-31031 October 1992 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power Station ML20094F0551992-01-31031 January 1992 Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20073E5641991-03-31031 March 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20072P7751990-06-30030 June 1990 Conformance to Reg Guide 1.97:Pilgrim ML19327B6761989-10-0303 October 1989 Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept. ML19327B6731989-10-0303 October 1989 Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station. ML20245G7601989-04-12012 April 1989 In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station ML20245G7791989-04-12012 April 1989 In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds ML20235H5971989-01-30030 January 1989 Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2 ML20154P6801988-05-31031 May 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20214S5201987-03-31031 March 1987 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206Q0531986-08-28028 August 1986 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20212A7071986-07-24024 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept ML20206N2791986-06-30030 June 1986 Estimated Safety Significance of Generic Safety Issue 61 ML20205N8571986-05-14014 May 1986 Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1 ML20244D6301986-01-17017 January 1986 Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....' ML20138B5931985-10-31031 October 1985 Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D0461985-05-0101 May 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1 ML20127D6311985-04-10010 April 1985 Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station ML20106C1661985-01-31031 January 1985 Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20106A5791984-09-30030 September 1984 Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept ML20106A5571984-09-26026 September 1984 Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation Rept ML20091J5701984-04-0909 April 1984 Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415) ML20084E6761984-01-31031 January 1984 Rev 1 to Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other ESF Signals for Pilgrim Nuclear Power Station,Unit 1 ML20093A5761983-08-31031 August 1983 Technical Evaluation of Integrity of Pilgrim Nuclear Power Station Unit 1 Reactor Coolant Boundary Piping Sys ML20204F2601983-03-0808 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents, Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20076B6561982-09-28028 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Boston Edison Co,Pilgram Nuclear Power Station, Technical Evaluation Rept ML20071L3881982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20069D1591982-08-20020 August 1982 Technical Evaluation Rept (Revision 1) on Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Pilgrim Nuclear Power Station,Unit 1 ML20028C6811982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20062B7941982-04-29029 April 1982 Monitoring of Electric Power to Reactor Protection Sys for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20049J4051982-03-0101 March 1982 Technical Evaluation of Response to Attachment 2 of Item II.F.1 of NUREG-0737,Addl Accident Monitoring Instrumentation. ML19331E0861980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Pilgrim Unit 1, Technical Evaluation Rept ML19323G1631980-05-20020 May 1980 Miscellaneous Nozzle Cracking,Pilgrim Unit 1, Technical Evaluation Rept ML20150B6301978-10-31031 October 1978 Evaluation of Radioiodine Measurements at Pilgrim Nuclear Power Plant 1998-03-31 Category:QUICK LOOK MONTHYEARML20212J2601998-03-31031 March 1998
[Table view]Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final Rept L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station1996-06-30030 June 1996 TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station ML20128K2061996-05-31031 May 1996 Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final Rept ML20128K2131996-04-11011 April 1996 Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final Rept ML20128K1871996-04-0909 April 1996 Pilgrim,Technical Evaluation Rept on IPE Front End Analysis L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant1994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant ML20044E7391993-06-23023 June 1993 Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. ML20116J6851992-10-31031 October 1992 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power Station ML20094F0551992-01-31031 January 1992 Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20073E5641991-03-31031 March 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20072P7751990-06-30030 June 1990 Conformance to Reg Guide 1.97:Pilgrim ML19327B6761989-10-0303 October 1989 Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept. ML19327B6731989-10-0303 October 1989 Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station. ML20245G7601989-04-12012 April 1989 In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station ML20245G7791989-04-12012 April 1989 In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds ML20235H5971989-01-30030 January 1989 Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2 ML20154P6801988-05-31031 May 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20214S5201987-03-31031 March 1987 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206Q0531986-08-28028 August 1986 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20212A7071986-07-24024 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept ML20206N2791986-06-30030 June 1986 Estimated Safety Significance of Generic Safety Issue 61 ML20205N8571986-05-14014 May 1986 Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1 ML20244D6301986-01-17017 January 1986 Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....' ML20138B5931985-10-31031 October 1985 Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D0461985-05-0101 May 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1 ML20127D6311985-04-10010 April 1985 Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station ML20106C1661985-01-31031 January 1985 Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20106A5791984-09-30030 September 1984 Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept ML20106A5571984-09-26026 September 1984 Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation Rept ML20091J5701984-04-0909 April 1984 Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415) ML20084E6761984-01-31031 January 1984 Rev 1 to Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other ESF Signals for Pilgrim Nuclear Power Station,Unit 1 ML20093A5761983-08-31031 August 1983 Technical Evaluation of Integrity of Pilgrim Nuclear Power Station Unit 1 Reactor Coolant Boundary Piping Sys ML20204F2601983-03-0808 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents, Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20076B6561982-09-28028 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Boston Edison Co,Pilgram Nuclear Power Station, Technical Evaluation Rept ML20071L3881982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20069D1591982-08-20020 August 1982 Technical Evaluation Rept (Revision 1) on Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Pilgrim Nuclear Power Station,Unit 1 ML20028C6811982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20062B7941982-04-29029 April 1982 Monitoring of Electric Power to Reactor Protection Sys for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20049J4051982-03-0101 March 1982 Technical Evaluation of Response to Attachment 2 of Item II.F.1 of NUREG-0737,Addl Accident Monitoring Instrumentation. ML19331E0861980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Pilgrim Unit 1, Technical Evaluation Rept ML19323G1631980-05-20020 May 1980 Miscellaneous Nozzle Cracking,Pilgrim Unit 1, Technical Evaluation Rept ML20150B6301978-10-31031 October 1978 Evaluation of Radioiodine Measurements at Pilgrim Nuclear Power Plant 1998-03-31 Category:ETC. (PERIODIC MONTHYEARML20212J2601998-03-31031 March 1998
[Table view]Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final Rept L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station1996-06-30030 June 1996 TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station ML20128K2061996-05-31031 May 1996 Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final Rept ML20128K2131996-04-11011 April 1996 Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final Rept ML20128K1871996-04-0909 April 1996 Pilgrim,Technical Evaluation Rept on IPE Front End Analysis L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant1994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant ML20044E7391993-06-23023 June 1993 Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. ML20116J6851992-10-31031 October 1992 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power Station ML20094F0551992-01-31031 January 1992 Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20073E5641991-03-31031 March 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20072P7751990-06-30030 June 1990 Conformance to Reg Guide 1.97:Pilgrim ML19327B6761989-10-0303 October 1989 Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept. ML19327B6731989-10-0303 October 1989 Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station. ML20245G7601989-04-12012 April 1989 In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station ML20245G7791989-04-12012 April 1989 In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds ML20235H5971989-01-30030 January 1989 Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2 ML20154P6801988-05-31031 May 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20214S5201987-03-31031 March 1987 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206Q0531986-08-28028 August 1986 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20212A7071986-07-24024 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept ML20206N2791986-06-30030 June 1986 Estimated Safety Significance of Generic Safety Issue 61 ML20205N8571986-05-14014 May 1986 Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1 ML20244D6301986-01-17017 January 1986 Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....' ML20138B5931985-10-31031 October 1985 Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D0461985-05-0101 May 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1 ML20127D6311985-04-10010 April 1985 Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station ML20106C1661985-01-31031 January 1985 Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20106A5791984-09-30030 September 1984 Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept ML20106A5571984-09-26026 September 1984 Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation Rept ML20091J5701984-04-0909 April 1984 Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415) ML20084E6761984-01-31031 January 1984 Rev 1 to Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other ESF Signals for Pilgrim Nuclear Power Station,Unit 1 ML20093A5761983-08-31031 August 1983 Technical Evaluation of Integrity of Pilgrim Nuclear Power Station Unit 1 Reactor Coolant Boundary Piping Sys ML20204F2601983-03-0808 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents, Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20076B6561982-09-28028 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Boston Edison Co,Pilgram Nuclear Power Station, Technical Evaluation Rept ML20071L3881982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20069D1591982-08-20020 August 1982 Technical Evaluation Rept (Revision 1) on Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Pilgrim Nuclear Power Station,Unit 1 ML20028C6811982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20062B7941982-04-29029 April 1982 Monitoring of Electric Power to Reactor Protection Sys for Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20049J4051982-03-0101 March 1982 Technical Evaluation of Response to Attachment 2 of Item II.F.1 of NUREG-0737,Addl Accident Monitoring Instrumentation. ML19331E0861980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Pilgrim Unit 1, Technical Evaluation Rept ML19323G1631980-05-20020 May 1980 Miscellaneous Nozzle Cracking,Pilgrim Unit 1, Technical Evaluation Rept ML20150B6301978-10-31031 October 1978 Evaluation of Radioiodine Measurements at Pilgrim Nuclear Power Plant 1998-03-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20212J2601998-03-31031 March 1998
[Table view]Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final Rept L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station1996-06-30030 June 1996 TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station ML20128K2061996-05-31031 May 1996 Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final Rept ML20128K2131996-04-11011 April 1996 Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final Rept ML20128K1871996-04-0909 April 1996 Pilgrim,Technical Evaluation Rept on IPE Front End Analysis L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant1994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant ML20044E7391993-06-23023 June 1993 Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. ML20116J6851992-10-31031 October 1992 High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power Station ML20094F0551992-01-31031 January 1992 Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20073E5641991-03-31031 March 1991 Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station ML20072P7751990-06-30030 June 1990 Conformance to Reg Guide 1.97:Pilgrim ML19327B6731989-10-0303 October 1989 Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station. ML19327B6761989-10-0303 October 1989 Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept. ML20245G7791989-04-12012 April 1989 In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds ML20245G7601989-04-12012 April 1989 In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station ML20235H5971989-01-30030 January 1989 Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2 ML20155B7391988-06-0101 June 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20155B7531988-06-0101 June 1988 Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites ML20154P6801988-05-31031 May 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1 ML20150D9001988-03-17017 March 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20150D9091988-03-17017 March 1988 Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20149F1311988-01-11011 January 1988 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20149F1691988-01-11011 January 1988 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20236P2181987-08-10010 August 1987 Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites ML20236P2051987-08-10010 August 1987 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co ML20206S7131987-04-0808 April 1987 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co ML20206S7871987-04-0808 April 1987 Mod 1,changing Billing Address as Result of NRC Reorganization,To Local Telephone Svc for Yankee Rowe, Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20214S5201987-03-31031 March 1987 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal Rept ML20211N4261987-02-23023 February 1987 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20211N3981987-02-23023 February 1987 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206Q0531986-08-28028 August 1986 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20212A7071986-07-24024 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept ML20206N2791986-06-30030 June 1986 Estimated Safety Significance of Generic Safety Issue 61 ML20205N8571986-05-14014 May 1986 Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1 ML20153H0851986-02-20020 February 1986 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Company ML20153H0471986-02-20020 February 1986 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20244D6301986-01-17017 January 1986 Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....' ML20138B5931985-10-31031 October 1985 Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D0461985-05-0101 May 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1 ML20127D6311985-04-10010 April 1985 Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station ML20106C1661985-01-31031 January 1985 Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation Rept ML20106A5791984-09-30030 September 1984 Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept ML20106A5571984-09-26026 September 1984 Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation Rept ML20091J5701984-04-0909 April 1984 Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415) 1998-03-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20069D159&oldid=2719367"