MONTHYEARML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML22179A3102022-06-22022 June 2022 Connecticut, Inc - 2021 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirement of 10 CFR 50.46 ML22115A1142022-04-25025 April 2022 Annual Radiological Environmental Operating Report ML21110A1552021-04-19019 April 2021 2020 Annual Radiological Environmental Operating Report ML20181A5392020-06-29029 June 2020 Submittal of 2019 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML20181A5302020-06-29029 June 2020 Milestone Power Station, Units 1, 2, 3 and ISFSI - 10 CFR 20.59 Biennial Change Report for 2018 and 2019: Annual Regulatory Commitment Change Report for 2019 ML20120A4302020-04-28028 April 2020 Transmittal of 2019 Annual Radiological Environmental Operating Report ML19179A1472019-06-21021 June 2019 2018 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19122A3862019-04-28028 April 2019 Annual Radiological Environmental Operating Report ML18184A3462018-06-28028 June 2018 2017 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML18184A4342018-06-21021 June 2018 1, 2, 3, and ISFSI 10 CFR 50.59, 10 Crf 72.48 Change Report for 2017, and Commitment Change Report for 2017 ML18127A2172018-05-0101 May 2018 Annual Radioactive Effluent Release Report ML18127A2162018-05-0101 May 2018 Transmittal of 2017 Annual Radioactive Effluent Release Report ML18033A3422018-01-22022 January 2018 Technical Specifications 2017 Annual Report ML17184A1462017-06-27027 June 2017 Transmittal of 2016 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML16179A2052016-06-21021 June 2016 2015 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14188C0562014-06-27027 June 2014 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14129A1522014-04-30030 April 2014 2013 Annual Radiological Environmental Operating Report ML13183A0682013-06-26026 June 2013 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13191A8232013-06-20020 June 2013 ISFSI 10 CFR 50.59 10 CFR 72.48 Change Report for 2012, and Commitment Change Report for 2012 ML13116A3482013-04-17017 April 2013 2012 Annual Environmental Protection Plan Operating Report ML1219103392012-06-28028 June 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12131A5232012-04-30030 April 2012 2011 Annual Radiological Environmental Operating Report ML12128A1612012-04-12012 April 2012 Annual Environment Protection Plan Operating Report ML1118004992011-06-27027 June 2011 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry ML1112504372011-04-28028 April 2011 2010 Annual Environmental Protection Plan Operating Report ML1018104352010-06-29029 June 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML1006103482010-02-18018 February 2010 Submittal of Technical Specifications 2009 Annual Report ML0918202722009-06-30030 June 2009 Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0913502172009-04-30030 April 2009 Annual Radiological Environmental Operating Report ML0913205612009-04-27027 April 2009 Annual Environmental Protection Plan Operating Report ML0905700472009-02-13013 February 2009 Submittal of Technical Specifications 2008 Annual Report ML0817904372008-06-26026 June 2008 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0805801982008-02-14014 February 2008 Technical Specifications Annual Report for 2007 ML0712401782007-04-24024 April 2007 2006 Annual Report of Individual Monitoring ML0712300712007-04-23023 April 2007 2006 Annual Radiological Environmental Operating Report for Period January Through December 2006 ML0612902602006-04-28028 April 2006 Annual Environmental Protection Plan Operating Report ML0604101152006-01-31031 January 2006 Technical Specifications Annual Operating Reports for 2005 ML0519600482005-07-13013 July 2005 ISFSI Annual Reporting of Changes to the Quality Assurance Program Revision 27 to the Dominion Nuclear Connecticut. Inc. Quality Assurance Program Topical Report ML0518603972005-06-30030 June 2005 Annual Report of Emergency Core Cooling System Model Changes ML0413205862004-04-30030 April 2004 Annual Environmental Protection Plan Operating Report ML0410703772004-04-0808 April 2004 Annual Reporting of Changes to and Errors in Emergency Core Cooling System Models or Applications ML0319206062003-06-25025 June 2003 CFR 50.59 and Commitment Change Report for 2002 ML0213000242002-04-30030 April 2002 2001 Annual Radiological Environmental Operating Report ML0209401772002-03-20020 March 2002 Annual Reporting of Changes and Errors in Emergency Core Cooling System Models or Applications 2023-06-26
[Table view] Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] |
Text
Dominion Nuclear Connecticut, Inc. -Dominion Millstone Power Station Rope Ferry Road Waterford, CT 06385 KAR 20 il0 Docket No. 50-336 B1 8612 RE: 10 CFR 50.46(a)(3)(ii)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 2001 Annual Reporting of Changes to and Errors in Emergency Core Cooling System Models or Applications In accordance with 10 CFR 50.46(a)(3)(ii), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits changes to and errors in the Emergency Core Cooling System (ECCS) evaluation models or applications of those models for Millstone Unit No. 2.
Attachment 1 transmits the annual report for the period January 2001 through December 2001. The following is a synopsis of the information provided in Attachment 1.
- 1. Attachment 1 reports the Framatome ANP (FRA-ANP) modifications in the ECCS models applicable to Millstone Unit No. 2. These modifications have resulted in permanent peak cladding temperature (PCT) margin allocations for Unit No. 2.
- 2. FRA-ANP identified one change or error in the Small Break Loss of Coolant Accident (SBLOCA) analysis during the 2001 calendar year. As summarized in Attachment 1, assessment of this item resulted in a 0°F change in PCT. The overall SBLOCA PCT is 2064 0 F.
- 3. FRA-ANP identified six changes or errors in the Large Break Loss of Coolant Accident (LBLOCA) analysis during the 2001 calendar year. As summarized in Attachment 1, assessment of these items resulted in a I°F change in PCT. The overall LBLOCA PCT is 1812 0 F.
- 4. Considering the changes summarized in Attachment 1, the corrected PCTs for the limiting SBLOCA and LBLOCA remain below the 2200°F limit defined by 10 CFR 50.46(b)(1).
U.S. Nuclear Regulatory Commission B18612/Page 2 DNC believes that this information satisfies the annual reporting requirements of 10 CFR 50.46(a)(3)(ii).
There are no regulatory commitments contained within this letter.
Should you have any questions regarding this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.
Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.
J.,tl1a rice Sitice President - Millstone Attachment (1) cc: H. J. Miller, Region I Administrator R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 NRC Senior Resident Inspector, Millstone Unit No. 2
Docket No. 50-336 B1 8612 Attachment 1 Millstone Nuclear Power Station, Unit No. 2 2001 Annual Reporting of 10 CFR 50.46 Margin Utilization
U.S. Nuclear Regulatory Commission B18612/Attachment 1/Page 1 2001 Annual Reporting of 10 CFR 50.46 Margin Utilization Small Break Loss of Coolant Accident (SBLOCA)
Plant Name: Millstone Unit No. 2 Utility Name: Dominion Nuclear Connecticut, Inc.
Analysis Information EM: EXEM/PWR 2
Small Break Limiting Break Size: 0.06 ft Analysis Date: 03/00 Vendor: Framatome ANP Peak Linear Power: 14.6 kW/ft Notes: None Clad Temp (OF) Notes LICENSING BASIS Analysis of Record PCT 2061 (1)
MARGIN ALLOCATIONS (Delta PCT)
A. Prior Permanent ECCS Model Assessments (Through 12/2000)
- 1. RODEX2 Corrosion Enhancement Factor in Millstone Cycle 14 SBLOCA Analysis -22
- 2. Variability in SBLOCA Analysis 25 (2)
B. Planned Plant Change Evaluations
- 1. None 0 C. 2001 Permanent ECCS Model Assessments
- 1. Errors Discovered During RODEX2 V&V 0 D. Temporary ECCS Model Issues
- 1. None 0 E. Other Margin Allocations
- 1. None 0 LICENSING BASIS PCT + MARGIN ALLOCATIONS PCT = 2064 NOTES:
(1) New Analysis of Record to support Cycle 14 operation with reduced charging flow.
(2) Limiting break size shifts to 0.07 ft 2.
U.S. Nuclear Regulatory Commission B18612/Attachment 1/Page 2 2001 Annual Reporting of 10 CFR 50.46 Margin Utilization Large Break Loss of Coolant Accident (LBLOCA)
Plant Name: Millstone Unit No. 2 Utility Name: Dominion Nuclear Connecticut, Inc.
Analysis Information EM: SEM/PWR-98 Limiting Break Size: 1.0 DECLG Analysis Date: 11/98 Vendor: Framatome ANP Peak Linear Power: 15.1 kW/ft Notes: None Clad Temp(°F) Notes LICENSING BASIS Analysis of Record PCT 1814 (1)
MARGIN ALLOCATIONS (Delta PCT)
A. Prior Permanent ECCS Model Assessments (Through 12/2000)
- 1. Corrected Corrosion Enhancement Factor -1
- 2. ICECON Coding Errors 0
- 3. Setting RFPAC Fuel Temperatures at Start of Reflood -2
- 4. SISPNCH/ujun98 Code Error 0
- 5. Error in Flow Blockage Model in TOODEE2 0
- 6. Change in TOODEE2-Calculation of QMAX 0
- 7. Change in Gadolinia Modeling 0
- 8. PWR LBLOCA Split Break Modeling 0
- 9. TEOBY Calculation Error 0 B. Planned Plant Change Evaluations
- 1. None 0 C. 2001 Permanent ECCS Model Assessments
- 1. Inappropriate Heat Transfer in TOODEE2 0
- 2. End-of-Bypass Prediction by TEOBY 0
- 3. R4SS Overwrite of Junction Inertia 0
- 4. Incorrect Junction Inertia Multipliers 1
- 5. Errors Discovered During RODEX2 V&V 0
- 6. Error in Broken Loop SG Tube Exit Junction Inertia 0 D. Temporary ECCS Model Issues
- 1. None 0 E. Other Margin Allocations
- 1. None 0 LICENSING BASIS PCT + MARGIN ALLOCATIONS PCT = 1812 Notes:
(1) New Analysis of Record with SEM/PWR-98 LOCA Evaluation Model.