NRC Job Performance Measure; JPPF-113; Fill the CST Using the Fire Service System
ML022630214
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/16/2002
From:
NRC/RGN-II
To:
References
FOIA/PA-2002-0371
Download: ML022630214 (8)


Text

V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPPF-113 FILL THE CST USING THE FIRE SERVICE SYSTEM Revision No. 1 Faulted JPM

PAGE 0 II FILL THE CST USING THE FIRE SERVICE SYSTEM II il hi II II I_

II TRAINEE EVALUATOR II II II EVALUATOR SIGNATURE DATE III II EVALUATION METHOD: SIMULATE T

EI ALUATION LOCATION: PLANT II II II II ESTIMATED TIME: 10.0 MINUTES TIME STARTED: II II II I1OCFR55.45(a)6 PERFORM CONTROL MANIPULATIONS REQUIRED TO II OBTAIN DESIRED OPERATING RESULTS DURING NORMAL, ABNORMAL, AND EMERGENCY SITUATIONS II II TIME CRITICAL: No FAULTED JPM: Yes II TRINEE PERFORMANCE: SATISFACTORY UNSATISFACTORY II IIII &\.

  • A' II II ii READ TO OPERATOR:

AS DIRECTED IN THE II ii WHEN I TELL YOU TO BEGIN, YOU ARE TO PTIONS UNDER WHICH THIS TASK II II INITIATING CUES. I WILL DESCRIBE GENE WITH WHICH TO PERFORM THIS II II IS TO BE PERFORMED AND PROVIDE THE NEC INITIAL CONDITIONS, WHICH STEPS II II TASK. BEFORE STARTING, I WILL EXPLAIN THE 'I CUES.

II TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING II II WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS II II It- -

JOB PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITIONS:

1. The Plant has experienced on ESF Bus Blackout with the CRS implementing EOP-6.0. CST level is < 5 ft and must be locally filled.
2. Demineralized Water Tank level is 20 feet.

TOOLS AND EQUIPMENT NEEDED:

1. EOP-6.0 ATT. 3
2. SOP-509, PAGE 15 & 16 REFERENCED DOCUMENTS: REV DATE LOSS OF ALL ESF AC POWER 06/30/97
1. EOP*6.0 09/03/97
2. SOP*509 FIRE SUPPRESSION SYSTEM

PAGE 1 FILL THE CST USING THE FIRE SERVICE SYSTEM II I1 TASK STANDARDS:

1. CST water level is increasing by tranferring water from the Fire Service System per EOP-6.0. Att. 3.

INITIATING CUES:

1. CRS directs filling CST per EOP-6.0 Attachment 3 TERMINATING CUES:
1. Flow has been established to CST via Fire Service System per EOP-6.0, Att. 3 or when examinee returns EOP-6.0, Att. 3 to examiner SAFETY CONSIDERATIONS:

NONE

J P JOB PERFORMANCE MEASURE CHECKLIST PAGE 2 (S) DENOTES SEQUENCED ELEMENT

(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.

INOTE 1: Evaluator need only determine that student can locate a 2-1/2" fire hose. Actual laying of the hose is not required. Do "NOT" break seal I

I on Hose House.

STEP STANDARD Connects 2-1/2" Fire hose Shows location of fire hose house S*1.

between XVT-06020A-FS (outside containing hose, and wrench, and shows Alt. Fire PP Bldg.) and location of FS test header ISOL VLV XVA10304-AS. (BH-436) XVT-6020A-FS, and FS to CST ISOL VALVE XVA-10304-AS.

COMMENTS:

STEP STANDARD

  • 2. Opens XVA-10304-AS (BH-436) Simulates opening XVA-10304-AS, FS to CST ISOL VALVE, by operating handwheel counter clockwise COMMSTS:

STEP STANDARD Simulates opening ALT FIRE PPS TEST {DR

-3. Open XVT0602OA-FS (outside alt. Fire pp house) _ ISOL VLV XVT-6020A-FS by operating handwheel counter clockwise COMMENTS:

INOTE 4: When examines identifies the need for SOP-509 to start the Alt. Diesel save time. Cue that I* Pump, provide examinee with copy of procedure to all initial conditions have been met.

I

JOB PERFORMANCE MEASURE CHECKLIST PAGE 3 (S) DENOTES SEQUENCED ELEMENT

(-) DENOTES CRITICAL ELEMENT SAT. UNSAT.

PERFORMANCE CHECKLIST:

JOB PERFORMANCE MEASURE CHECKLIST PAGE 4 (S) DENOTES SEQUENCED ELEMENT

(*) DENOTES CRITICAL ELEMNT PERFORMANCE CHECKLIST: SAT. UNSAT.

STEP STANDARD

4. Inspects batteries for Batteries verified in good condition.

leaks/corrosion.

STEP STANDARD S*5. Select battery for Alt. Diesel Places either battery switch (1 or 2) to Pump. ON at local panel.

COMMENTS:

STEP STANDARD S'6. Select Alt. Diesel Pump start Selects MAN 1 or MAN 2 (to correspond to ciruit on AUTO/MAN switch. battery bank selected in previous step) on local panel.

COMMENTS:

INOTE 7: Cue operator that adequate flow is visible STEP STANDARD 7 Verifies engine cooling water Cooling water flow observed to yard flow drain.

INOTE 8: Cue examinee that engine cranked for 30 seconds and did not start.

JOB PERFORANCE MEASURE CHECKLIST PAGE 5 (S) DENOTES SEQUENCED ELEMENT

(-) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.

STEP STANDARD Depresses pushbutton on local control S 8. Starts the alternate diesel fire pump at XPN-7315-FS panel for MAN CRANK 1 or MAN CRANK 2 (previously selected)

STEP STANDARD FS to CST Simulates closing XVA-10304-AS, FS to

9. Close XVA10304-AS, CST ISOL VLV, by operating handwheel ISOL VLV (BH-436) clockwise location of hoses & I INOTE 10: Cue exasinee that it is only necessary to show valve connection points. NOTE: Do "NOT" break seal on Hose House.

STEP STANDARD Shows location of Fire Hose house S-10. Connects 2 1/2" fire hose containing hose, wrench, and shows between XFXOOO1M, Fire Hydrant location of FS to CST Isol VLV for FHHH#2, and XVA-10304-AS (BH-436) XVA-10304-AS and XFX0001M, Fire Hydrant for FHHH#2 COMMENTS:

STEP STANDARD Simulates opening XVA-10304-AS by "11. Open XVA10304-AS FS TO CST operating handwheel counter clockwise ISOL VLV (BH-436)

0 JOB PERFORMANCE MEASURE CHECKLIST 0 PAGE 6 (S) DENOTES SEQUENCED ELEMENT

(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.

STEP STANDARD

"*12. Open XFX0001M, Fire Hydrant Simulates opening XFX0001M by operating for FHHH#2 handwheel counter clockwise COMMENTS:

Examiner Stops JPM At This Point TIME STOPPED.

GENERAL COMMENT

S:

NRC KA

REFERENCES:

KA NUMBER IMPORTANCE FACTOR RO SRO 086000.A4.01 Ability to manually operate 3.3 3.3 and monitor fire water pumps.