ML033450174

From kanterella
Revision as of 06:42, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Management Change, Point Beach
ML033450174
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/11/2003
From: Anton Vegel
NRC/RGN-III
To:
References
MR 3-2003-0035
Download: ML033450174 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III December 11, 2003 Licensee/Facility: Notification:

NUCLEAR MANAGEMENT CO., LLC Point Beach MR Number: 3-2003-0035 Hudson, Wisconsin Date: 12/11/2003 Dockets: 050-00266 050-00301 Fax from Resident Inspctrs

[1] W-2-LP, [2] W-2-LP License No:

Subject:

Management Change Discussion:

On Wednesday, December 10, 2003, Mr. Fred Cayia, the Site Vice-President, announced the appointment of Mr. Jim Schweitzer as the Site Engineering Director for Point Beach. Mr. Schweitzer is currently the Production Planning Manager at Point Beach and has served as Maintenance Manager and System Engineering Manager at Point Beach and Engineering Director at Kewaunee, where he also obtained an SRO certification. The appointment is effective Monday, December 15.

Contact:

Org: Phone No: Email:

VEGEL, A EIC3 (630) 829-9620 AXV@nrc.gov