MONTHYEARML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24152A1992024-07-0101 July 2024 Richie Garcia, Water Filtration Supervisor-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No. 50-0255 ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma ML24152A1972024-07-0101 July 2024 Mayor Annie Brown, South Haven-Palisades-NOI to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization of Power Operation 2024-09-06
[Table view] |
Text
April 4, 2003 Mr. Douglas E. Cooper Site Vice President Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES PLANT - STEAM GENERATOR TUBE INSERVICE INSPECTION
Dear Mr. Cooper:
Inservice inspections (ISI) of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the Palisades Technical Specifications, reporting requirements range from submitting a special report within 15 days following completion of each ISI of SG tubes that identifies the number of tubes plugged and/or repaired, to submitting a special report within 12 months following completion of the inspection that provides complete results of the SG tube ISI. The special report containing the complete results shall include the following:
- 1. The number and extent of tubes inspected.
- 2. The location and percent of wall-thickness penetration for each indication of an imperfection.
- 3. Identification of tubes plugged and/or repaired.
A teleconference has been arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the current Palisades refueling outage. This phone call will occur after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. Enclosed is a list of discussion points to facilitate this teleconference.
The Nuclear Regulatory Commission staff plans to document a brief summary of the conference call, as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Johnny H. Eads, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
List of Discussion Points cc w/encl: See next page
ML030930551 *Previously Concurred OFFICE PDIII-1/PM PDIII-1/LA EMCB/SC PDIII-1/SC NAME JEads RBouling** LLund* LRaghavan DATE 04/04/03 04/04/03 04/04/03 04/04/03 Palisades Plant cc:
Mr. Robert A. Fenech, Senior Vice President Michigan Department of Attorney General Nuclear, Fossil, and Hydro Operations Special Litigation Division Consumers Energy Company 630 Law Building 212 West Michigan Avenue P.O. Box 30212 Jackson, MI 49201 Lansing, MI 48909 Arunas T. Udrys, Esquire Mr. Roy A. Anderson Consumers Energy Company Executive Vice President 212 West Michigan Avenue Nuclear Management Company, LLC Jackson, MI 49201 700 First Street Hudson, WI 54016 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Manager, Regulatory Affairs 801 Warrenville Road Nuclear Management Company, LLC Lisle, IL 60532-4351 27780 Blue Star Memorial Highway Covert, MI 49043 Supervisor Covert Township Steven T. Wawro P. O. Box 35 Nuclear Asset Director Covert, MI 49043 Consumers Energy Company Palisades Plant Office of the Governor 27780 Blue Star Memorial Highway P. O. Box 30013 Covert, MI 49043 Lansing, MI 48909 Mr. John Paul Cowan U.S. Nuclear Regulatory Commission Chief Nuclear Officer Resident Inspectors Office Nuclear Management Company, LLC Palisades Plant 27780 Blue Star Memorial Highway 27782 Blue Star Memorial Highway Covert, MI 49043 Covert, MI 49043 Jonathan Rogoff, Esquire Michigan Department of Environmental Quality General Counsel Waste and Hazardous Materials Division Nuclear Management Company, LLC Hazardous Waste and Radiological 700 First Street Protection Section Hudson, WI 54016 Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 March 2003
STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION PALISADES PLANT DOCKET NO. 50-255 The following discussion points have been prepared to facilitate the teleconferences arranged between the Nuclear Regulatory Commission (NRC) staff and the Nuclear Management Company, LLC (the licensee), to discuss the results of the steam generator (SG) tube inspections to be conducted during the current Palisades Plant refueling outage. This teleconference is scheduled to occur towards the end of the planned SG tube inspection interval, but before the unit exits its refueling outage.
The NRC staff plans to document a brief summary of the teleconference, as well as any material that the licensee may provide to the NRC staff in support of the teleconference.
- 1. Discuss whether any primary-to-secondary leakage existed in this unit prior to shutdown.
- 2. Discuss the results of secondary side pressure tests.
- 3. For each SG, provide a description of areas examined, including the expansion criteria utilized and type of probe used in each area. Also, be prepared to discuss the inspection of the tube within the tubesheet, particularly the portion of the tube below the expansion/ transition region.
- 4. Discuss any exceptions taken to the industry guidelines.
- 5. Provide a summary of the number of indications identified to date, of each degradation mode and SG tube location (e.g., tube support plate, top-of-tubesheet, etc.). Also provide information (such as voltages) and estimated depths and lengths of the most significant indications.
- 6. Describe repair/plugging plans for the SG tubes that meet the repair/plugging criteria.
- 7. Discuss the previous history of SG tube inspection results, including any "look backs" performed. Specifically for significant indications or indications where look backs are used in support of dispositioning (e.g., manufacturing burnish marks).
- 8. Discuss, in general, new inspection findings (e.g., degradation mode or location of degradation new to this unit).
- 9. Discuss the use or reliance on inspection probes (eddy current or ultrasonic) other than bobbin and typical rotating probes, if applicable.
- 10. Describe in-situ pressure test plans and results, if applicable and available, including tube selection criteria.
ENCLOSURE
- 11. Describe tube pull plans and preliminary results, if applicable and available, including tube selection criteria.
- 12. Discuss the assessment of tube integrity for the previous operating cycle (i.e., condition monitoring).
- 13. Provide the schedule for SG related activities during the remainder of the current outage.