(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Manual
MONTHYEAR0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML0906410232009-02-26026 February 2009 Attachment 2 to 0CAN020901, Offsite Dose Calculation Manual, Revision 16 ML0904103222008-04-15015 April 2008 Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 ML0606101662004-12-15015 December 2004 Offsite Dose Calculation Manual Arkansas Nuclear One, Revision 014-03-0 ML0506601912004-12-15015 December 2004 Offsite Dose Calculation Manual (014-03-0) ML0506601942004-09-30030 September 2004 Process Control Program ENS-RW-105 (Revision #2) ML0512602792004-05-14014 May 2004 LAR 02-06 Print-Ready TS Page Changes ML0406301542003-12-31031 December 2003 Offsite Dose Calculation Manual, Attachment 2 to 0CAN020405 ML0335101682003-12-0303 December 2003 Technical Requirements Manual, Revision 7 (Unit 1), Change 007 ML0329605232003-09-30030 September 2003 Technical Requirements Manual, Revision 16, Arkansas Nuclear One, Unit No. 2 ML0326602302003-08-27027 August 2003 Change No. 015 to Technical Requirements Manual (Unit 2) ML0326602332003-08-27027 August 2003 Change No. 015 to Technical Requirements Manual (Unit 2) Table of Contents ML0316904642003-06-11011 June 2003 TRM-U2, Technical Requirements Manual, Change No. 014-R1 for Arkansas Nuclear One ML0314100162003-05-0909 May 2003 Change 006-R2 to TRM-U1-102, Technical Requirements Manual (Unit 1) ML0312700512003-04-25025 April 2003 Technical Requirements Manual ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 ML0312000392003-04-24024 April 2003 TRM-U1, Technical Requirements Manual, Change No. 006-R1 ML0311905762003-04-24024 April 2003 Technical Requirements Manual, TRM-U2 ML0228302522002-09-30030 September 2002 Revision 006, Change AP-06 to Document TRM-U1, Technical Requirements Manual, (Unit 1). ML0220501272002-07-17017 July 2002 Arkansas Units 1 & 2 Technical Requirements Manual, TRM-U2-102, Revision 12, Change AP-12 ML0219106282002-07-0505 July 2002 Change AP-05 to Rev 5 to Technical Requirements Manual TRM-U1, Controlled Document, for Arkansas Nuclear One, Unit 1 ML0212805272002-04-24024 April 2002 TRM-U2, Revision No. 011, Change No. AP-11, Technical Requirements Manual (Unit 2). ML0212303422002-04-12012 April 2002 Document TRM-U2, Revision 10, Change No. 10, Technical Requirement Manual (Unit 2). ML0212303042002-04-11011 April 2002 Technical Requirements Manual, Revision No. 10, Change No. AP-10, for Arkansas Nuclear One Unit 2 ML0210905112002-04-0909 April 2002 Revision 009-01, Change AP-09 to TRM-U2, Technical Requirements Manual 2023-08-17
[Table view] |
Text
- I--- ,
it s_ %\- Arkansas Nuclear One - Administrative Services
- Document Control Friday, April 25,2003 Document Update Notification COPYHOLDER NO: TRM-U2-102 TO: GSB-NRC ADDRESS: OS-DOCUMENT CONTROL, WASHINGTON, D.C. 20555 DOCUMENTNO: TRM-U2 TITLE: TECHNICAL REQUIREMENTS MANUAL (UNIT 2)
CHANGE NO: 013 ADDITIONAL INFO:
ed, please sign, date, and returnwithin S days.
13 ANO-J Docket 50-313 a ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL-(N-GSB-67)
ARKANSAS NUCLEAR ONE 1448 SR 333 1
RUSSELLVILLE, AR 72801
TECHNICAL REQUIREMENTS MANUAL REVISION 13 ARKANSAS NUCLEAR ONE. UNIT NO. 2 Replace the following pages of the associated Technical Requirements Manual with the attached pages.
REMOVE PAGES INSERT PAGES Index Pa-es na na Technical Requirements Pages 3.6-1 ---- 3.6-1
CONTAINMENT SYSTEMS CONTAINMENT RECIRCULATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 At least two independent containment recirculation fans shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
With one of the above required containment recirculation fans inoperable, restore the inoperable fan to OPERABLE status within 30 days. If not restored within 30 days or with no containment recirculation fan OPERABLE, initiate a condition report to document the condition and determine any limitations for continued operation of the plant.
SURVEILLANCE REQUIREMENTS 4.6.4.3 Each of the above containment recirculation fans shall be demonstrated OPERABLE:
- a. At least once per 92 days on a STAGGERED TEST BASIS BY:
- 1. Verifying that the fan can be started on operator action in the control room, and
- 2. Verifying that the fan operates for at least 15 minutes.
- b. At least once per 18 months by verifying a flow rate of at least 4500 cfm per fan.
ANO-2 TRM 3.6-1 Rev. 42,13