Arkansas Units 1 & 2 Technical Requirements Manual, TRM-U2-102, Revision 12, Change AP-12
ML022050127
Person / Time
Site: Arkansas Nuclear  
Issue date: 07/17/2002
From:
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TRM-U2-102, Rev 12
Download: ML022050127 (24)


Text

Arkapsas Niclear One - Administrative Services Document Control Wednesday, July 17, 2002 Document Update Notification COPYHOLDER NO:

TO:

ADDRESS:

DOCUMENT NO:

TITLE:

RE VISION NO:

CHANGE NO:

SUBJECT.

TRM-U2-102 GSB-NRC OS-DOCUMENT CONTROL, WASHINGTON, D.C. 20555 TRM-U2 TECHNICAL REQUIREMENTS MANUAL (UNIT 2) 012 AP-12 MAKE LISTED UPDATES AND REMOVE OLD TABS AND INSERT NEW TABS BEFORE APPROPRIATE SECTIONS S*- If this box is checked, please sign, date, and return within 5 days.

Q* ANO-1 Docket 50-313 ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:

ATTN: DOCUMENT CONTROL ARKANSAS NUCLEAR ONE 1448 SR 333 RUSSELLVILLE, AR 72801

TECHNICAL REQUIREMENTS MANUAL REVISION: 12 ARKANSAS NUCLEAR ONE, UNIT NO. 2 Revise the following pages of the associated Technical Requirements Manual with the attached pages.

REMOVE PAGES INSERT PAGES Index Pages i-2 i-3

-- -- -i-2 i-3 3.6-1 Technical Requirements Pages

LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3.1 REACTIVITY CONTROL SYSTEMS (Continued) 3.1.2.6 Boric Acid Makeup Pumps - Operating.............................................

3.1-7 3.1.2.7 Borated Water Sources - Shutdown.................................................

3.1-8 3.1.2.8 Borated Water Sources - Operating.................................................

3.1-10 3.3 INSTRUMENTATION 3.3.1.1 Reactor Protective Instrumentation..................................................

3.3-1 3.3.3.3 Seismic Instrumentation...................................................................

3.3-4 3.3.3.4 Meteorological Instrumentation.........................................................

3.3-7 3.3.3.7 Chlorine Detection Systems.............................................................

3.3-10 3.3.4.1 Turbine Overspeed Protection..........................................................

3.3-11 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Containment Recirculation System...................................................

3.6-1 3.9 REFUELING OPERATIONS 3.9.3 Decay Time and Spent Fuel Storage................................................

3.9-1 BASES SECTION PAGE B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.2 Boration System s.............................................................................

B 3.1-1 ANO-2 TRM i-2 Rev. 12

BASES SECTION PAGE B 3.3 INSTRUMENTATION B 3.3.1.1 Reactor Protective Instrumentation...................................................

B 3.3-1 B 3.3.3.3 Seismic Instrumentation....................................................................

B 3.3-1 B 3.3.3.4 Meteorological Instrumentation.........................................................

B 3.3-2 B 3.3.3.7 Chlorine Detection Systems..............................................................

B 3.3-2 B 3.3.4.1 Turbine Overspeed Protection..........................................................

B 3.3-2 B 3.9 REFUELING OPERATIONS B 3.9.3 Decay Time...........................................................................................

B 3.9-1 ADMINISTRATIVE CONTROLS SECTION PAGE 6.9 None IL ANO-2 TRM 1-3 r*,e~v.

122.

i-3 ANO-2 TRM

CONTAINMENT SYSTEMS CONTAINMENT RECIRCULATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 At least two independent containment recirculation fans shall be OPERABLE.

APPLICABILITY:

MODES I and 2.

ACTION:

With one containment recirculation fan inoperable, restore the inoperable fan to OPERABLE status within 30 days. If not restored within 30 days or with more than one containment recirculation fan inoperable, initiate a condition report to document the condition and determine any limitations for continued operation of the plant.

SURVEILLANCE REQUIREMENTS 4.6.4.3 Each of the above containment recirculation fans shall be demonstrated OPERABLE:

a At least once per 92 days on a STAGGERED TEST BASIS BY:

1.

Verifying that the fan can be started on operator action in the control room, and

2.

Verifying that the fan operates for at least 15 minutes.

b.

At least once per 18 months by verifying a flow rate of at least 4500 cfm per fan.

Af

r¶tv.

IL

ANO-2 TRM 3.6-1 lRev. 12--

3.6-1 ANO-2 TRM

1.0 Use & Applicatons

)

)

2.2 LSSS

)

)

)

3.0 Applicability

)

)

3.4 RCS

) ~))

)

i

3.5 ECCS

)

)

))

)

3.8 Electrical Power

)

)

)

r*

3.9 Refueling

) )

)

/

  • )

3.10 STE

) ~))

)

5.0 Admin Controls

)

)

BASES

) )

))