- I--- ,

it s_ %\- Arkansas Nuclear One - Administrative Services

- Document Control Friday, April 25,2003 Document Update Notification COPYHOLDER NO: TRM-U2-102 TO: GSB-NRC ADDRESS: OS-DOCUMENT CONTROL, WASHINGTON, D.C. 20555 DOCUMENTNO: TRM-U2 TITLE: TECHNICAL REQUIREMENTS MANUAL (UNIT 2)

CHANGE NO: 013 ADDITIONAL INFO:

ed, please sign, date, and returnwithin S days.

13 ANO-J Docket 50-313 a ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:

ATTN: DOCUMENT CONTROL-(N-GSB-67)

ARKANSAS NUCLEAR ONE 1448 SR 333 1

RUSSELLVILLE, AR 72801

  • Y_ t: - - , ., --

TECHNICAL REQUIREMENTS MANUAL REVISION 13 ARKANSAS NUCLEAR ONE. UNIT NO. 2 Replace the following pages of the associated Technical Requirements Manual with the attached pages.

REMOVE PAGES INSERT PAGES Index Pa-es na na Technical Requirements Pages 3.6-1 ---- 3.6-1

CONTAINMENT SYSTEMS CONTAINMENT RECIRCULATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.3 At least two independent containment recirculation fans shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

With one of the above required containment recirculation fans inoperable, restore the inoperable fan to OPERABLE status within 30 days. If not restored within 30 days or with no containment recirculation fan OPERABLE, initiate a condition report to document the condition and determine any limitations for continued operation of the plant.

SURVEILLANCE REQUIREMENTS 4.6.4.3 Each of the above containment recirculation fans shall be demonstrated OPERABLE:

a. At least once per 92 days on a STAGGERED TEST BASIS BY:
1. Verifying that the fan can be started on operator action in the control room, and
2. Verifying that the fan operates for at least 15 minutes.
b. At least once per 18 months by verifying a flow rate of at least 4500 cfm per fan.

ANO-2 TRM 3.6-1 Rev. 42,13