Text
Arkansas Nuclear One - Administrative Senices Document Control Monday, September 30, 2002 Document Update Notification COPYHOLDER NO:
TO:
ADDRESS.
DOCUMENT NO:
TITLE:
REVISION NO:
CHANGE NO:
TRM-Ul-102 GSB-NRC/DOCUMENT CONTROL OS-WASHINGTON, D.C. 20555 TRM-U1 TECHNICAL REQUIREMENTS MANUAL (UNIT 1) 006 AP-06
SUBJECT:
CONTROLLED DOCUMENT F
- T If this box is checked, please sign, date, and return within 5 days.
ANO-1 Docket 50-313 This ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL ARKANSAS NUCLEAR ONE 1448 SR 333 RUSSELLVILLE, AR 72801 YA
TECHNICAL REQUIREMENTS MANUAL REVISION: 6 ARKANSAS NUCLEAR ONE, UNIT NO. I Revise the following pages of the associated Technical Requirements Manual with the attached pages.
REMOVE PAGES INSERT PAGES Index Pages N/AN/A Technical Requirements Pages 3.4.4-2 3.4.4-2 3.4.7-1 3.4.7-1 3.7.3-1
-3.7.3-1 33.7.3-2 3.8.3-1 3.8.3-1 B 3.7.3-1 B 3.7.3-1
RCS Chemistry 3.4.4 AtrTirmc~ (r'nntiniiPril SJN~
CONDITION 1.
B.
Required Actions and associated Completion Times not met OR RCS coolant concentration of oxygen
> 1.0 ppm with concentration of chloride
> 1.0 ppm OR RCS coolant concentration of oxygen
> 1.0 ppm with concentration of fluoride
> 1.0 ppm.
REQUIRED ACTION B.1 Initiate a condition report to document the condition and determine any limitations for continued operation of the plant COMPLETION TIME Immediately TEST REQUIREMENTS SURVEILLANCE FREQUENCY TR 3.4.4.1
NOTE --.-.----.-........--------
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Verification of oxygen concentration is not required when RCS temperature is < 250'F.
Verify reactor coolant concentration of oxygen, as 02, < 0.10 ppm.
TR 3.4.4.2 Verify reactor coolant concentration of chloride, as 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CI1, < 0.15 ppm.
TR 3.4.4.3 Verify reactor coolant concentration of fluoride, as 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> F-, *0.15 ppm.
Rev. 6 ANO-1 TRM
'S 3.4.4-2
Reactor Coolant Boron Sampling 3.4.7 TRM 3.4 REACTOR COOLANT SYSTEM (RCS)
TRM 3.4.7 Reactor Coolant Boron Sampling TRO 3.4.7 Reactor coolant boron concentration shall be sampled.
APPLICABILITY:
At all times.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Requirement not met.
A.1 Initiate a condition report Immediately to document the condition and determine any limitations for continued operation of the plant.
TEST REQUIREMENTS SURVEILLANCE FREQUENCY TR 3.4.7.1 Sample reactor coolant boron concentration.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Rev. 6 ANO-1 TRM L
I 3.4.7-1
SFP-MODE6 3.7.3 TRM 3.7 PLANT SYSTEMS TRM 3.7.3 Spent Fuel Pool (SFP) - MODE 6 TRO 3.7.3 APPLICABILITY:
During full core offload, the heat load in the SFP shall remain within the limits specified in Figure 3.7.3-1.
During movement of irradiated fuel between the reactor pressure vessel and the SFP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRO not met.
A.1 Suspend transfer of Immediately irradiated fuel to the SFP.
TEST REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1.
The sum of the total heat load to be transferred to the Prior to and during SFP plus the existing SFP heat load shall be each full core determined to be less than the limits specified in offload.
Figure 3.7.3-1.
Rev. 6 ANO-1 TRM F
I I
I 3.7.3-1
SFP - MODE 6 3.7.3 Figure 3.7.3-1 Spent Fuel Cooling Capacity 50 55 60 65 70 75 80 85 90 95 SWTemp (F)
Note: 2 SFP Cooling Heat Exchangers and Pumps are required for full core off load ANO-1 TRM F
50 45 40 I
(U o 35
-J (U
30 2C 45
,2 lC ooersAvaiab
/1for SFP Cooling I ICW Cooler Available Ifor SFP Cooling i\\
0 I
25 Rev. 6 3.7.3-2
DG Testing 3.8.3 If-TRM 3.8 ELECTRICAL POWER SYSTEMS TRM 3.8.3 Diesel Generator (DG) Testing TRO 3.8.3 APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Manual start of DG not A.1 Initiate a condition report Immediately performed to document the condition and determine any OR limitations for continued operation of the plant.
Inspection not performed per manufacturer's recommendations.
TEST REQUIREMENTS SURVEILLANCE FREQUENCY TR 3.8.3.1 Each DG shall be manually started during the 31 days performance of Technical Specification Surveillance Requirement 3.8.1.2.
TR 3.8.3.2 Each diesel generator shall be given an inspection following manufacturer's recommendations for this class of standby service except for the fuel oil filters and turbo filters, which are addressed in TR 3.8.3.3.
24 months TR 3.8.3.3 NOTE -.--------...--
The 25% interval extension provided by TR 3.0.2 is not applicable.
Replace the diesel generator lube oil filters and turbo 24 months filters.
3.8.3-1 ANO-1 TRM I
I Rev. 6
SFP-MODE6 I B 3.7.3 TRM B 3.7 PLANT SYSTEMS TRM B 3.7.3 Spent Fuel Pool (SFP) - MODE 6 BASES BACKGROUND Compliance with this requirement provides assurance that the maximum design I
temperature of the spent fuel pool cooling system will not be exceeded during a full core I offload.
ANO-1 TRMB7 Rev. 6 B 3.7.3-1