ML031410016

From kanterella
Jump to navigation Jump to search
Change 006-R2 to TRM-U1-102, Technical Requirements Manual (Unit 1)
ML031410016
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/09/2003
From:
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TRM-U1-102, Change 006-R2
Download: ML031410016 (3)


Text

Arkansas Nuclear One - Administrative Services Document Control Friday, May 09, 2003 Document Update Notification COPYHOLDER NO: TRM-U1-102 TO: GSB-NRC/DOCUMENT CONTROL ADDRESS. OS-WASHINGTON, D.C. 20555 DOCUMENTNO: TRM-U1 TITLE: TECHNICAL REQUIREMENTS MANUAL (UNIT 1)

CHANGE NO: 006-R2 ADDITIONAL INFO: RE-DISTRIBUTION OFPA GE 1.0-2 ONL Y X(-If this box is checked, please sign, date, and return within 5 days.

O ANO-1 Docket 50-313 O1ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:

ATTN: DOCUMENT CONTROL-(N-GSB-67)

ARKANSAS NUCLEAR ONE 1448 SR 333 AoDI RUSSELLVILLE, AR 72801 I

SUPPLEMENTAL FORM Section: 1.0 Record/Document No.: Ul TRM Page 1 of 1 File No.: Rev. Date: 5/6/03 Transmittal No: LIC-03-014

==

Description:==

Re-issue of ANO-1 TRM Page 1.0-2.

Reason:

Minor wording error noted on page that did not match the wording of the last two revisions which affected this paragraph on Page 1.0-2. This is a continuation of errors resulting from the installation of new computers and software at or about the time the ANO-1 TSs were being converted to the improved standard which resulted in dramatic changes to the TRM.

APPROVALS:

Originator: Date: S 3 Section Supervisorv i Date:

I 7

-0l7 'a&t AD-1 03, ATTACHMENT 9.3 j

.;rl. , "

L 1.0 USE AND APPLICATIONS (continued) 1.0.4 Changes To The TRM Design modifications, procedure changes, license amendments, etc. have the potential to affect the TRM. If this occurs, the initiating department should complete a License Based Document Change form for submitting changes to the TRM. TRM changes are subject to the requirements of 10 CFR 50.59 due to the TRM being considered a part of the SAR and therefore a licensing basis document. Changes to the TRM will be issued on a replacement page basis to controlled document holders following approval of the change in accordance with site procedures on document control.

1.0.5 NRC Reporting Of TRM Revisions Like the SAR, changes to the TRM are controlled under 10 CFR 50.59 and therefore do not require prior NRC approval unless the change involves a change to the TS or the need for a license amendment in accordance with 10 CFR 50.59 is required. The most recent revision of the TRM will be sent to the NRC as part of the periodic SAR update process.

1.0.6 TS Applicability To The TRM The TRM may reference a TS LCO or Surveillance Requirement (SR) that applies to the relocated information. All TRM references to the TS will be preceded by "TS" or "Technical Specification" and then the associated specification number. I ANO-1 TRM 1.0-2 Rev. 5 I