Letter Sequence Draft Other |
---|
|
|
MONTHYEARRNP-RA/03-0022, Request for Exemption from 10 CFR 54.21(b)2003-03-0404 March 2003 Request for Exemption from 10 CFR 54.21(b) Project stage: Request ML0311307262003-04-22022 April 2003 Draft Response to Open Items with Attachment 1 St. Lucie, Units 1 & 2 - Enclosure 3 to 03/05/2003 Summary of Meeting Dated 04/22/2003 ML0312806442003-05-0808 May 2003 Westinghouse Electric Co., Llc. (Wec), Request for Withholding Information from Public Disclosure for St. Lucie, Units 1 & 2 (TAC Nos. MB3406 & MB3412), Request Granted Project stage: Withholding Request Acceptance ML0313207612003-05-12012 May 2003 Request for Clarification of the Supplemental Response to the Request for Additional Information (RAI) 2.1-2 Concerning the Nonsegregated-phase Bus Related to the Application for Renewed Operating Licenses for St. Lucie Units 1 and 2 TAC MB Project stage: RAI ML0318204112003-06-30030 June 2003 Transmittal of Draft Report on Phosphate Attack on Concrete Prepared by a Member of the Advisory Committee on Reactor Safeguards (Tac Nos. MB3406 and MB3412) Project stage: Draft Other 2003-05-12
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20240032024-11-0707 November 2024 Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report 2024-09-09
[Table view] |
Text
June 30, 2003 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
DRAFT REPORT ON PHOSPHATE ATTACK ON CONCRETE PREPARED BY A MEMBER OF THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (TAC NOS. MB3406 AND MB3412)
Dear Mr. Stall:
During the Advisory Committee on Reactor Safeguards (ACRS) meeting on April 9, 2003, your staff presented information concerning the St. Lucie, Units 1 and 2, application for renewed operating licenses. One of the items discussed was the potential aging effect of phosphates on concrete structures. Following the meeting, Dr. Dana Powers, ACRS member, developed a draft report detailing his comments. The report is enclosed to assist your staff in preparing for the September 2003 ACRS full committee meeting. The NRC staff would be interested in discussing your position on the effects of phosphates prior to the September 2003 ACRS meeting.
/RA/
Noel F. Dudley, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos: 50-335 and 50-389
Enclosure:
As stated cc w/encls: See next page
Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
DRAFT REPORT ON PHOSPHATE ATTACK ON CONCRETE PREPARED BY A MEMBER OF THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (TAC NOS. MB3406 AND MB3412)
Dear Mr. Stall:
During the Advisory Committee on Reactor Safeguards (ACRS) meeting on April 9, 2003, your staff presented information concerning the St. Lucie, Units 1 and 2, application for renewed operating licenses. One of the items discussed was the potential aging effect of phosphates on concrete structures. Following the meeting, Dr. Dana Powers, ACRS member, developed a draft report detailing his comments. The report is enclosed to assist your staff in preparing for the September 2003 ACRS full committee meeting. The NRC staff would be interested in discussing your position on the effects of phosphates prior to the September 2003 ACRS meeting.
/RA/
Noel F. Dudley, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos: 50-335 and 50-389
Enclosure:
As stated cc w/encls: See next page DISTRIBUTION:
See next page Document Name: C:\ORPCheckout\FileNET\ML031820411.wpd OFFICE PM: RLEP/DRIP SC:RLEP/DRIP NAME NDudley SLee DATE 6/ 23 /03 6/ 30 /03 OFFICIAL RECORD COPY
DISTRIBUTION: Date: June 30, 2003 HARD COPY RLEP RF N. Dudley T. Liu E-MAIL:
PUBLIC W. Borchardt D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo P. Shemanski H. Nieh H. Walker S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)
S. Duraiswamy C. Munson RLEP Staff D. Jeng
ST. LUCIE PLANT Florida Power and Light Company cc:
Senior Resident Inspector Mr. Don Mothena St. Lucie Plant Manager, Nuclear Plant Support Services U.S. Nuclear Regulatory Commission Florida Power & Light Company P.O. Box 6090 P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, FL 33408-0420 Mr. Craig Fugate, Director Mr. Rajiv S. Kundalkar Division of Emergency Preparedness Vice President - Nuclear Engineering Department of Community Affairs Florida Power & Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, FL 33408-0420 M. S. Ross, Attorney Mr. J. Kammel Florida Power & Light Company Radiological Emergency P.O. Box 14000 Planning Administrator Juno Beach, FL 33408-0420 Department of Public Safety 6000 SE. Tower Drive Mr. Douglas Anderson Stuart, Florida 34997 County Administrator St. Lucie County Attorney General 2300 Virginia Avenue Department of Legal Affairs Fort Pierce, Florida 34982 The Capitol Tallahassee, Florida 32304 Mr. William A. Passetti, Chief Department of Health Mr. Steve Hale Bureau of Radiation Control St. Lucie Nuclear Plant 2020 Capital Circle, SE, Bin #C21 Florida Power and Light Company Tallahassee, Florida 32399-1741 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. William Jefferson, Jr.
Site Vice President Mr. Fred Emerson St. Lucie Nuclear Plant Nuclear Energy Institute 6501 South Ocean Drive 1776 I Street, N.W., Suite 400 Jensen Beach, Florida 34957 Washington, DC 20006-3708 Mr. R. E. Rose Mr. David Lewis Plant General Manager Shaw Pittman, LLP St. Lucie Nuclear Plant 2300 N Street, N.W.
6501 South Ocean Drive Washington, D.C. 20037 Jensen Beach, Florida 34957 Mr. J. T. Voorhees Acting Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, Florida 34957