3F0703-12, Clarification of Exemption from the Requirements of 10 CFR Part 55, Section 55.59

From kanterella
Revision as of 15:48, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Clarification of Exemption from the Requirements of 10 CFR Part 55, Section 55.59
ML032250340
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/31/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0703-12, TAC MB8135
Download: ML032250340 (1)


Text

e, Progress Eergy Crystal Rivcr Nuclear Plant Docket No. S0-302 Operating License No. DPR-72 Ref: 10 CFR 55.11 10 CFR 55.59 July 31, 2003 3F0703-12 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Clarification of Exemption from the Requirements of 10 CFR Part 55, Section 55.59

References:

1. FPC to NRC letter, 3F0303-02, dated March 6, 2003, Crystal River Unit 3 -

Request for Exemption from Certain Requirements of 10 CFR 55.59

2. NRC to FPC letter, 3N0503-06, dated May 14,2003, Crystal River Unit 3-Exemption From the Requirements of 10 CFR Part 55, Section 55.59 (TAC No. MB8135)

Dear Sir:

Reference 2 approved the exemption to 10 CFR 55.59 requested in Reference 1 in that the current Licensed Operator Requalification Program will now end on February 28, 2005.

Reference 1 included extending the annual operating test period to end on February 28, 2004. As a result of subsequent discussions with the NRC staff, Progress Energy Florida, Inc. understands that the Reference 2 approval of the extension of the Licensed Operator Requalification Program includes the extension of the current annual operating test to February 28, 2004.

This letter establishes no new regulatory commitments. -

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

o A. Franke General Plant Manager JAF/rmb xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Progress Energy Flrida, Inc.

Crystal River Nuclear Plant 15760 W. Power line Street Crystal River, FL 34428

",4, r k