(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Inspection Report
MONTHYEARIR 05000089/20200012020-03-30030 March 2020 General Atomics - NRC Inspection Report 05000089/2020001; 05000163/2020001 IR 05000089/20190012019-09-0606 September 2019 General Atomics - NRC Inspection Report 050-00089/2019-001; 050 00163/2019-001 IR 05000089/20180012018-11-19019 November 2018 General Atomics; NRC Inspection Report 050-00089/18-001, 050-00163/18-001, and 070-00734/18-001 IR 05000089/20150012015-11-24024 November 2015 IR 05000089/2015001, 05000163/2015001, and 07000734/2015001, September 8-9, 2015, General Atomics IR 05000089/20130012013-12-0202 December 2013 IR 05000089-13-001, 05000163-13-001 & 07000734-13-001; 10/30/2013 General Atomics, NRC Inspection Report IR 05000089/20120012012-11-16016 November 2012 IR 05000089-12-001, 05000163-12-001, 07000754-12-001, 10/16-18/2012 for General Atomics IR 05000089/20100012010-11-0101 November 2010 IR 05000163-10-001; IR 0500089-10-001, 02/10/2010 Through 08/30/2010, General Atomics IR 05000089/20062012006-08-17017 August 2006 NRC Inspection Report Nos. 05000163-06-201 and 05000089-06-201 for General Atomics Triga Reactors Facility IR 05000089/20032012003-10-0202 October 2003 IR 05000163-03-201 and IR 05000089-03-201, on 08/18-21/03 for General Atomics Triga Reactors Facility IR 05000089/19982021998-06-11011 June 1998 Insp Repts 50-089/98-202 & 50-163/98-202 on 980504-07. Violations Noted.Major Areas Inspected:Organization & Staffing,Review & Audit Functions,Emergency Preparedness, Safeguards & Security IR 05000089/19982011998-03-18018 March 1998 Insp Repts 50-089/98-201 & 50-163/98-201 on 980217-18.No Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensee Class III Nonpower Reactor Including;Organization & Staffing & Radiation Protection IR 05000089/19930011993-09-0101 September 1993 Partially Withheld Insp Repts 50-089/93-01 & 50-163/93-01 on 930803-06.Non-cited Violations Identified.Major Areas Inspected:Reactor Operations,Review & Audit,Experiments, Transportation Activities & EP Program & Drills IR 05000089/19900011990-08-15015 August 1990 Forwards Safeguards Insp Repts 50-089/90-01 & 50-163/90-01 on 900710-27.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790(d)) IR 05000089/19890011989-03-24024 March 1989 Insp Rept 50-089/89-01 on 890314-16.No Violations,Deviations or Safety Concerns Noted.Major Areas Inspected:Training for Computer Control Console,Associated Training Records,Console Operation by Operators & Exit Interview IR 05000089/19870031988-01-0707 January 1988 Insp Rept 50-089/87-03 on 871217.No Violations or Deviations Noted.Major Areas Inspected:Bypassing of Reactor Safety Interlock & Insp Procedures 40750,90712 & 92700 Addressed IR 05000089/19870011987-03-13013 March 1987 Insp Repts 50-089/87-01 & 50-163/87-01 on 870227.No Violations & Deviations Noted.Major Areas Inspected:Followup on Allegations Pertaining to Release of Irradiated Matl from Facility W/O Radiation Surveys & Followup on LER IR 05000089/19860021986-11-0505 November 1986 Insp Repts 50-089/86-02 & 50-163/86-02 on 861007-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Review & Audit,Experiments,Qualification Training,Lers & Emergency Preparedness Program IR 05000089/19860011986-07-10010 July 1986 Forwards Safeguards Insp Repts 50-089/86-01 & 50-163/86-01 on 860623-27.No Violations Noted.Repts Withheld (Ref 10CFR2.790) IR 05000089/19850011985-06-0505 June 1985 Forwards Safeguards Insp Repts 50-089/85-01,50-163/85-01 & 70-0734/85-08 on 850521-24 & Notice of Violation.Encls Withheld (Ref 10CFR2.790) 2020-03-30
[Table view] Category:Letter
MONTHYEARML21281A1712021-12-0707 December 2021 General Atomics Triga Reactor Facility - Approval of License Termination Based on the Final Status Survey Report and Supporting Information ML21232A6982021-09-28028 September 2021 General Atomics Triga Reactors - U.S. EPA MOU Consultation Letter ML21012A2732020-12-14014 December 2020 General Atomics Triga Reactor Facility Final Status Survey Report -Cover Letter IR 05000089/20200012020-03-30030 March 2020 General Atomics - NRC Inspection Report 05000089/2020001; 05000163/2020001 ML20049A0392020-02-0505 February 2020 Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020 ML21246A2672019-11-26026 November 2019 5339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California ML19337D3822019-11-26026 November 2019 General Atomics Confirmatory Survey Report from Orau ML21246A2552019-09-17017 September 2019 Letter to M. Doell, NRC, from M. Grogan, Ga - Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 1 ML19266A5092019-09-17017 September 2019 General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1 IR 05000089/20190012019-09-0606 September 2019 General Atomics - NRC Inspection Report 050-00089/2019-001; 050 00163/2019-001 ML19247C5492019-08-0202 August 2019 Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility ML19079A2462019-03-18018 March 2019 Submittal of General Atomics Triga Mark 1 and Mark F Annual Reports for Calendar Year 2018 (3 Copies Each) IR 05000089/20180012018-11-19019 November 2018 General Atomics; NRC Inspection Report 050-00089/18-001, 050-00163/18-001, and 070-00734/18-001 ML18303A1242018-03-19019 March 2018 General Atomics Triga Mark I and Mark F Annual Reports for 2017 ML18303A1722017-03-17017 March 2017 General Atomics Triga Mark I and Mark F Annual Reports for 2016 ML16285A3002017-02-0101 February 2017 Ga Release Criteria Approval Letter ML16242A3192016-08-15015 August 2016 General Atomics, Request for Approval of Release Criteria for General Atomics' Triga Reactor Facility ML18303A1512016-03-24024 March 2016 General Atomics Triga Mark I and Mark F Annual Reports for 2015 ML15362A5062015-12-18018 December 2015 Request for Approval of Release Criteria for General Atomics Triga Reactor Facility IR 05000089/20150012015-11-24024 November 2015 IR 05000089/2015001, 05000163/2015001, and 07000734/2015001, September 8-9, 2015, General Atomics ML15317A3402015-10-15015 October 2015 Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures ML15273A0592015-03-17017 March 2015 General Atomics Triga Mark I and Mark F Annual Reports for Calendar Year 2014 ML15069A3702015-02-20020 February 2015 General Atomics Transmittal of Semiannual Effluent Report ML14073A1712014-03-0404 March 2014 General Atomics, Submittal of Mark I and Mark F Annual Reports for Calendar Year 2013 ML14014A0912014-01-22022 January 2014 K. Asmussen Ltr Change in U.S. Nuclear Regulatory Commission Project Manager for the General Atomics Triga Reactors IR 05000089/20130012013-12-0202 December 2013 IR 05000089-13-001, 05000163-13-001 & 07000734-13-001; 10/30/2013 General Atomics, NRC Inspection Report ML13260A4192013-09-0505 September 2013 General Atomics Letter Submittal of Revised Financial Documents (2012) Financial Assurance for Decommissioning ML13112A2382013-03-28028 March 2013 J. Shepherd Ltr. Submittal of General Atomics Triga Mark 1 and Mark F Annual Reports for Calendar Year 2012R IR 05000089/20120012012-11-16016 November 2012 IR 05000089-12-001, 05000163-12-001, 07000754-12-001, 10/16-18/2012 for General Atomics ML12081A2852012-03-20020 March 2012 Submittal of General Atomics Trigak Mark I and Mark F Annual Reports for Calendar Year 2011 (3 Copies Each) ML11158A0152011-06-0202 June 2011 Submittal of General Atomics' Interim Revised Triga Reactors Facility, Decommissioning Schedule ML11132A1232011-05-10010 May 2011 General Atomics Submittal of Revised Financial Documents (2010) Financial Assurance for Decommissioning ML1107306872011-03-0404 March 2011 J. Shepherd Ltr. Submittal of General Atomics Triga Mark I and Mark F Annual Reports for Calendar Year 2010 IR 05000089/20100012010-11-0101 November 2010 IR 05000163-10-001; IR 0500089-10-001, 02/10/2010 Through 08/30/2010, General Atomics ML1009903602010-04-0707 April 2010 Submittal of General Atomics' Triga Mark I and Mark F Annual Reports for Calendar Year 2009 ML0910603672009-04-10010 April 2009 Submittal of General Atomics' Triga Mark I and Mark F Annual Reports for Calendar Year 2008 ML0827600332008-09-17017 September 2008 General Atomics Transmittal of Semiannual Effluent Report (2 Copies) ML0803706052008-02-0101 February 2008 General Atomics - Semiannual Effluent Report for 07/01/2007 Through 12/13/2007 ML0804203342008-02-0101 February 2008 General Atomics - Transmittal of Semiannual Effluent Report - License No. SNM-696 - February 1, 2008 ML0734705862007-12-13013 December 2007 General Atomics, Transmittal of Semiannual Effluent Report, Received 12/11/2007 ML0721403562007-08-16016 August 2007 Ltr to Ms. Charlotte Engstrom - General Atomics Triga Reactors Facility - NRC Mc & a Inspection Report ML0711501032007-08-0101 August 2007 Keith Asmussen Ltr Issuance of Order Imposing Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to the General Atomics Research and Test Reactors ML0707905842007-03-15015 March 2007 Y020070071 Trtr (National Organization Fo Test, Research and Training Reactors) Letter and Response on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0707401202007-03-0101 March 2007 Letter Trasnmitting Annual Reports for Calendar Year 2006 ML0705303292007-02-0505 February 2007 Ltr from General Atomics Dated 02/05/2007; Transmittal of Semiannual Effluent Report for the Period 07/01/2006 - 12/31/2006 (Docket Nos. 50-89, 50-163 and 70-734; License Nos. R-38, R-67 and SNM-696, Respectively) ML0702200022007-01-26026 January 2007 National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0629800772006-10-23023 October 2006 E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases ML0626902242006-09-28028 September 2006 Change in NRC Staff Project Management for General Atomics Reactor Facilities, Effective 10/01/06 ML0625403122006-09-22022 September 2006 Radiological Contingency Plan Changes for General Atomics (TAC No. MD2686 and MD2687) 2021-09-28
[Table view] |
Text
ber 2, 2003
SUBJECT:
NRC INSPECTION REPORT NOS. 50-163/2003-201 AND 50-089/2003-201
Dear Mr. Walti:
This letter refers to the inspection conducted on August 18-21, 2003, at your General Atomics TRIGA Reactors Facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, the NRC has identified a violation of NRC requirements.
10 CFR 55.21 states, in part, that a licensee shall have a medical examination by a physician every two years. Although all operators have had physicals through their personal physicians they had not, since active decommissioning stopped in 2000, had medical exams to meet 10 CFR 55.21 requirements. The circumstances surrounding this are described in detail in the subject inspection report. In accordance with the General Statement of Policy and Procedure for NRC Enforcement Actions (Enforcement Policy), NUREG-1600, this violation would be categorized at Severity Level IV (Supplement I).
The corrective actions taken by your staff to have the operators get medical exams to meet 10 CFR 55.21 requirements and to insure they will continue to have them every two years was immediate and comprehensive. Based on these corrective actions made during the inspection, the NRC has determined that no further enforcement action is necessary to ensure compliance.
No response to this letter is required.
Mr. In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
Should you have any questions concerning this inspection, please contact Stephen Holmes at 301-415-8583.
Sincerely,
/RA/
James E. Lyons, Program Director New, Research and Test Reactors Program (RNRP)
Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-163, 50-89 License Nos.: R-67, R-38 Enclosure: NRC Inspection Report Nos. 50-163/2003-201 and 50-089/2003-201 cc w/encl.: Please see next page
General Atomics Docket Nos .: 50-163, 50-89 cc:
Steve Hsu Radiologic Health Branch State Department of Health Service P.O. Box 942732 Sacramento, CA 94234-7320 Dr. Keith E. Asmussen, Director Licensing, Safety, and Nuclear Compliance General Atomics P.O. Box 85608 San Diego, CA 92186-9784 Ruben Develasco, Manager Decommissioning Project General Atomics P.O. Box 85608 San Diego, CA 92186-9784 John S. Greenwood Manager, TRIGA Reactor Facility General Atomics P.O. Box 85608 San Diego, CA 92186-9784 TRTR Newsletter Department of Nuclear Engineering Sciences University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
M