+ GENERAL ATOMICS June 2, 2011 38/67-4477 VIA OVERNIGHT DELIVERY Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Mr. James Shepherd Docket Nos.: 50-89 and 50-163; License Nos. R-38 and R-67, Respectively
Subject:
Submittal of General Atomics' Interim Revised TRIGA Reactors Facility Decommissioning Schedule.
Dear Mr. Mr. Shepherd:
As you are aware, General Atomics' (GA's) TRIGA Reactors Facility (TRF) is where GA's two TRIGA research reactors are located and where their associated fuel had been located. The two reactors are possessed under Nuclear Regulatory Commission (NRC) License Nos. R-38 and R-67; designated as the Mark I and Mark F reactors respectively. The Mark F was permanently shut down on April 11, 1995 and the Mark I was permanently shut down on August 4, 1997. GA initiated the decontamination and decommissioning of its TRF shortly after the Mark I reactor was shut down.
GA commenced TFR decommissioning by physically transferring all of the fuel from the Mark I reactor into the fuel storage canals of the Mark F reactor. GA then proceeded to dismantle the Mark I reactor, empty its pool, remove the aluminum liner, and decontaminate the Mark I reactor room as well as certain adjoining rooms. GA pursued its TRF decommissioning activities to the extent it was feasible to do so without compromising the structural integrity of the facility related to the physical protection requirements associated with storing the Mark I and Mark F fuel in the Mark F reactor's fuel storage canals. Further decommissioning was put on hold pending removal of all of the fuel from GA's site.
After an unanticipated lengthy delay, the TRIGA fuel associated with GA's reactors was shipped off of GA's site in September 2010. Accordingly, GA has re-commenced activities associated with the decommissioning of its TRF pursuant to its NRC-approved decommissioning plan (Plan) dated July 1999 (Reference).
A schedule for TRF decommissioning was provided in the Plan as Figure 2-6 "Decommissioning Schedule." However, because of the unanticipated and prolonged delay between the time the Plan was written and when GA was authorized to ship its TRIGA fuel off site, there have been numerous changes in circumstances which necessitate revisions to the previously prepared schedule. Accordingly, enclosed is a revised schedule to replace Figure 2-6.
Please note the enclosed schedule is an "interim" and "living" schedule in that there are some items outside of GA's control that cannot be scheduled accurately at this time. For example, there are, at the moment, some unknowns regarding the options for disposing of certain activated items currently in the Mark F reactor pool (e.g., two 3550 GENERAL ATOMICS COURT, SAN DIEGO, CA 92121-1122 PO BOX 85608, SAN DIEGO, CA 92186-5608 (858) 455-3000
Document Control Desk June 2, 2011 GA Letter 38/67-4477 Page 2 neutron sources) and of the scope of work for certain key activities, e.g., the extent of soil contamination beyond the concrete biological shields and the resulting extent of building demolition necessary to excavate contaminated soil. Thus, the enclosed schedule is subject to further revision as new information becomes known.
! You will note that the enclosed schedule identifies significant action items (in their approximate sequence) to be accomplished between now and the completion of decommissioning activities, but no associated milestone dates are given beyond December 2012. This is because the schedule beyond December 2012 is strongly dependent on the results of the radiological (and hazardous material) characterization of the facility and soil (e.g. extent of soil contamination) which won't be available until about the third quarter of 2012. These results will be the most significant factor impacting the recommendations of the demolition engineering consultant regarding how best to de-construct the building, remove the concrete biological shields, and gain access to the soil that must be excavated.
The recommendations of the demolition engineering consultant will be factored into a revised TRF decommissioning schedule with milestones and dates which will be submitted to the NRC in a timely manner. It is currently estimated that during 2012 and 2013, GA would complete major decommissioning activities, followed by final radiological surveys, submittal of final release request, confirmatory surveys, and release to unrestricted use in 2014.
If you should have any questions regarding this submittal, please do not hesitate to contact me at (858) 455-2823 or at keith.asmussen@.qat.com.
Very truly yours, Keith E. Asmussen, Ph.D., Director Licensing, Safety and Nuclear Compliance
Enclosure:
Figure 2-6 Decommissioning Schedule, Revised 06/02/2011
Reference:
General Atomics' NRC-approved decommissioning plan. GA document no. PC-
- 000482, Revision 3,
titled:
"General Atomics TRIGA Reactor Facility Decommissioning Plan," dated July 1999.
ID 1 A iN.rwDrao Start Finish redecesmors lo. De19 '10 IFnb6 1 '11 1Mar27, '1 M 51 ul MI A1 T 10t
'11 INo2 1
a1 2Mr 1
2 2J,1 2Jr2 1 S
16.'12 INov4'12 De2 '2Fb1 S S T
TOct9 27 'F11 MJan T5.12 T
MarF12 4.10,W 12 i uF29 12 ISeM 1
N Dec23 12TFeb1S S
'I..
F ISSMIT IWT T
FIS I STIW T I M I Y ITIW I
F S
SlM I T IJW IT I F I I
2 3
4 5
7 10 13 14 15 16 17 15 is 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 38 37 3,8 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
-- 9--
s55 57 s8 58g-f ii D&D TRIGA Reactor Facility D&D TRIGA MkF Disposition of Remaining Items in MkF Pool Disposition of Neutron Sources MRC-AmBe-2290 MRC-AmBe-2289 SbBe Sources Thermionic Spacers Remaining SST Items Drain MkF Pool Establish Contract with NNSS for Waste Disposal Procure Waste Containers Re-Establish Gamma Spectrometer System Radiological Characterization of Mkl and MkF Prepare RFP for Core Drilling Contractor Review Bids and Award Core Drilling Contract Core Drill MkF Biological Shield HPs Sample Roof/Walls/Deck/MkF Biological Shield HP Lab Analysis of Samples Hazardous Material Assessment of TRF Asbestos characterization Summarize facility Rad/Hazardous/Asbestos sample results for use in defining extent of structural demolition required Contract with Structural/Demolition Engineer to assess entire demolition/excavation job.
Determine extent of building demolition required to access MkF and Mkl I Determine extent of Roof demolition required Determine extent of masonry Wall demolition required Determine types of WVll buttressing required to proceed with partial build Determine types/extent of shoring required to safely remove Biological St Structural Engineer to prepare demolition plan Prepare facility for partial demolition Remove/disposition MkF Control Console, MkF Bridge, and all other fumi Remove/disposition overhead Cranes Remove TRF HEPA Ventilation System, as appropriate Prior to installed HEPA system removal, HPs declare areas are free Set up portable HEPA ventilation systems, as required by HP for built Procure radioactive waste containers/fixtures for building demo debris Top-Loading Sea-Land Containers for major building and roof debris Y-4 Boxes/Liners/banding for smaller items Pallets/shrinkwrap/banding for masonry Wall sections Building Demo Sequence Shore-up all exterior and interior walls Remove roof; package/disposition debris Asbestos Abatement service vendor required for roof removal Section/cut masonry Walls to be removed into 4' x 4' squares; package/dispo Section/cut concrete decks to be removed into 4' x 4' squares; package/dispc Remove all Gunnite from MkF Pool Liner; package/disposition Torch cut/section MkF Pool steel Liner; package/disposition Excavate/remove MkF Fuel Storage Walls; package/disposition Remove contaminated soil from behind the MkF Biological Shield (to assure I Cut/section MkF concrete Biological Shield/package/disposition debris Section/remove Sump system from around the MkF Pool; package/disposito Excavate contaminated backing soil from around/under MkF Pool; package/r Section/cut Mkl concrete Biological Shield (to assure the soil does not collapt Excavate contaminated backing soil from around Mkl Pool; package/dispositi GA HP Survey building/soil for residual contamination Submit final radiological survey plan/design to NRC for concurrence HP conducts final survey report / Project remediates, as needed Prepare GA final survey results report and submit release request to NRC NRC/ORISE perform confirmatory surveys in Mkl and MkF facilities 501 days?
260 days 260 days 260 days 260 days 260 days 260 days 260 days 260 days 45 days 20 days 1 day?
1 day?
87 days 87 days 87 days 87 days 87 days 87 days 22 days 10 days 44 days 65 days 64 days 65 days 65 days 65 days 65 days 65 days I day?
1 day 1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
I day?
1 day?
I day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
1 day?
60 days?
60 days 1 day?
1 day?
1 day?
Mon 113111 Mon 1213112 Mon 1/3/11 Fri 12/30/11 Mon 113111 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/3/11 Fri 12/30/11 Mon 1/2/12 Fri 3/2/12 3 Fri 5/13/11 Thu 6/9/11 Fri 5/13/11 Fri 5/13/11 Fri 5/13/11 Fri 5/13/11 Fri 3/2/12 Mon 7/2/12 Fri 3/2/12 Mon 7/2/12 Fri 3/2/12 Mon 7/2/12 Fri 3/2/12 Mon 7/2112 Fri 3/2/12 Mon 7/2/12 Fri 3/2/12 Mon 7/2/12 Fri 3/2/12 Mon 4/2/12 Fri 5/13/11 Thu 5/26/11 Tue 7/3/12 Fri 8/31/12 Mon 9/3/12 Fri 11/30/12 22 Mon 9/3/12 Thu 11/29/12 Mon 9/3/12 Fri 11/30/12 Mon 9/3/12 Fri 11130/12 Mon 9/3/12 Fri 11/30/12 Mon 9/3/12 Fri 11/30/12 Mon 9/3/12 Fri 11/30/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3112 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 2/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Fri 2/22/13 Mon 12/3/12 Fri 2/22/13 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3/12 Mon 12/3112 Mon 12/3/12 I
t t
U m
Project: TRF DThu 682011 Schedule Dr Task Progress Surnurry V -
External Tasks Q
Deadline Date: Thu 6/2/11 Spli Milestone Project Surrerary External Milestone 4 Page 1 F-igure 2-6 uecommissioning S cedule, Revised June 2, 2U11