ML033030205

From kanterella
Revision as of 16:15, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Management Change
ML033030205
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/30/2003
From: Louden P
NRC/RGN-III
To:
References
MR-III-03-0030
Download: ML033030205 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III October 30, 2003 Licensee/Facility: Notification:

NUCLEAR MANAGEMENT CO., LLC Point Beach MR Number: 3-2003-0030 Hudson, Wisconsin Date: 10/30/2003 Dockets: 050-00266 050-00301 Fax from Resident Inspctr.

[1] W-2-LP, [2] W-2-LP License No:

Subject:

Management Change Discussion:

On Thursday, October 29, 2003, Mr. Fred Cayia, the Site Vice-President, announced the appointment of Mr. Jim McCarthy to the new position of Director of Site Operations. In this position, Mr. McCarthy will have the plant manager, training manager, engineering director, and the regulatory affairs manager reporting to him. Mr. McCarthy will also function as the plant manager until a permanent replacement is chosen. Mr. McCarthy is currently the plant manager at Kewaunee and has previous experience at Surry and Susquehanna.

Contact:

Org: Phone No: Email:

P. LOUDEN (360) 829-9627