Letter Sequence Other |
---|
|
|
MONTHYEARML0333800022003-12-0303 December 2003 License Amendment, Extend the Surveillance Interval for the Train B Memories Test Portion of the Actuation Logic Test Project stage: Other ML0333902692003-12-0303 December 2003 Technical Specification, Extend the Surveillance Interval for the Train B Memories Test Portion of the Actuation Logic Test Project stage: Other 2003-12-03
[Table View] |
Technical Specification, Extend the Surveillance Interval for the Train B Memories Test Portion of the Actuation Logic TestML033390269 |
Person / Time |
---|
Site: |
Vogtle |
---|
Issue date: |
12/03/2003 |
---|
From: |
NRC/NRR/DLPM/LPD2 |
---|
To: |
|
---|
References |
---|
TAC MC1256 |
Download: ML033390269 (8) |
|
|
---|
Category:Technical Specifications
MONTHYEARML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23243A9802023-12-19019 December 2023 VEGP Unit 3 Amendment Attachment ML23243B0572023-12-19019 December 2023 VEGP Unit 4 Amendment Attachment ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23159A0992023-07-31031 July 2023 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001) ML23158A2092023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Attachment NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23072A2752023-05-0101 May 2023 Attachment to Enclosure 1 - VEGP U3 Amendment 191 LAR-22-005 ML23037A0902023-02-0808 February 2023 Amend Attachment - Vogtle 3 Amend No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML23037A9212023-02-0606 February 2023 SNC Presentation - Draft Vogtle TSTF-339 LAR - Pre-Submittal Meeting - February 13 2023 ML23013A2192023-01-13013 January 2023 Amendment No. 189 - Amendment Attachment ND-22-0219, Technical Specifications Setpoint Report2022-08-11011 August 2022 Technical Specifications Setpoint Report ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20247J4632020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 183 (LAR-20-004) ML20247J4602020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 185 (LAR-20-004) ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ML20013G7122020-02-0303 February 2020 Amendment 173 (LAR-19-016) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19298A1042019-10-25025 October 2019 Attachment - VEGP U4 Amendment XX5 (LAR-19-001) NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ML19238A3482019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR-19-004) ML19238A3492019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR-19-004) ML19063C6402019-04-11011 April 2019 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 158 (LAR-18-027) ML19063C6412019-04-11011 April 2019 Attachment - VEGP U4 Amendment 156 (LAR-18-027) ML19038A4572019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 4 (LAR 18-025) ML19038A4552019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 3 (LAR 18-025) ML19035A7602019-02-22022 February 2019 Attachment for Amendment 153 - LAR-18-024 ML19035A7582019-02-22022 February 2019 Attachment for Amendment 154 - LAR-18-024 ML18351A1942019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 4 LAR 18-017 ML18351A1922019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-017 ML18341A0832018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant - Unit 3 Amendment 149(LAR-18-022) ML18341A0852018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 148 (LAR-18-022) ML18296A4182018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 4 ML18296A4172018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 3 ML18263A0392018-10-29029 October 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) ML18180A0622018-08-10010 August 2018 Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization Process ML18173A3062018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 134 (LAR-18-003) ML18173A3042018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 135 (LAR-18-003) ML18082B3772018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 134(LAR-18-005) 2024-07-23
[Table view] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 108 FACILITY OPERATING LICENSE NO. NPF-81 DOCKET NO. 50-425 Replace the following pages of the Appendix A Technical Specifications and associated Bases with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3.3.1-10 3.3.1-10 3.3.1-bOa
3.3.1-lOb 3.3.2-7 3.3.2-7
B 3.3.1-57a
B 3.3.1-57b B 3.3.2-46 B 3.3.2-46
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.4 ------------ NOTE - ---------------------
This Surveillance must be performed on the reactor trip bypass breaker prior to placing the bypass breaker in service.
Perform TADOT. 31 days on a STAGGERED TEST BASIS SR 3.3.1.5 -----------------------------NOTE --------------------
The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the test of the Power Range Block of the Source Range Neutron Flux Trip Block for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.
Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.1.6 -------------------------- NOTES---- --- ------------
- 1. Not required to be performed until 7 days after THERMAL POWER is Ž 75% RTP.
- 2. Neutron detectors are excluded from CHANNEL CALIBRATION.
Calibrate excore channels to agree with incore 92 EFPD detector measurements.
(continued)
Vogt.le Unit 2 3.3.1 -10 Amendment No. 108 (Unit 2)
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY I.
SR 3.3.1.7 ---------------------------- NOTES--------------------------
- 1. For the Source Range Instrumentation this surveillance shall include verification that interlocks P-6 and P-1 0 are in their required state for existing unit conditions.
- 2. Not required to be performed for Source Range Instrumentation prior to entering MODE 3 from MODE 2 until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entry into MODE 3.
Perform COT. 92 days (continued)
Vogtle Unit 2 3.3.11-1 Oa Amendment No. 108 (Unilt 2)
RTS Instrumentation 3.3.1 This page intentionally left blank.
Vogtle Unit 2 3.3.1 -1Ob Amendment No. 108 (Unit 2)
ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS
-- . ---------------------------------NOTE ---------------------
Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.
SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 -------- NOTE--------------------------
The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the portions of the ACTUATION LOCIC TEST for Feedwater Isolation on P14 or SI that pass through the memories circuits for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.
Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days SR 3.3.2.5 Perform SLAVE RELAY TEST. 18 months SR 3.3.2.6 ------ - -- - -------- NOTE---------------------------
Verification of setpoint not required for manual initiation functions.
Perform TADOT. 18 months (continued)
Vogtle Unit 2 3.3.2-7 Amendment No. 108 (Unit 2)
RTS Instrumentation B 3.3.1 BASES SURVEILLANCE SR 3.3.1.5 (continued)
REQUIREMENTS SR 3.3.1.5 is modified by the following Note: The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the test of the Power Range Block of the Source Range Neutron Flux Trip Block for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.
(continued)
Vogtle Units 1 and 2 B 3.3.1-57a Rev. 0
RTS Instrumentation B 3.3.1 BASES (continued)
This page intentionally left blank.
(continued)
Vogtle Units 1 and 2 B 3.3.1-57b Rev. 0
ESFAS Instrumentation B 3.3.2 BASES SURVEILLANCE SR 3.3.2.1 (continued)
REQUIREMENTS channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between the two instrument channels could be an indication of excessive instrument drift in one of the channels or of something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria are determined by the unit staff, based on a combination of the channel instrument uncertainties, including indication and reliability. If a channel is outside the criteria, it may be an indication that the sensor or the signal processing equipment has drifted outside its limit.
The Frequency is based on operating experience that demonstrates channel failure is rare. The CHANNEL CHECK supplements less formal, but more frequent, checks of channels during normal operational use of the displays associated with the LCO required channels.
SR 3.3.2.2 SR 3.3.2.2 is the performance of an ACTUATION LOGIC TEST.
The SSPS is tested every 31 days on a STAGGERED TEST BASIS, using the semiautomatic tester. The train being tested is placed in the bypass condition, thus preventing inadvertent actuation. Through the semiautomatic tester, all possible logic combinations, with and without applicable permissives, are tested for each protection function. In addition, the master relay coil is pulse tested for continuity. This verifies that the logic modules are OPERABLE and that there is an Intact voltage signal path to the master relay coils. The Frequency of every 31 days on a STAGGERED TEST BASIS is adequate. It is based on industry operating experience, considering instrument reliability and operating history data.
SR 3.3.2.2 is modified by the following Note: The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the portions of the ACTUATION LOGIC TEST for Feedwater Isolation on P14 or Si that pass through the memories circuits for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.
(continued)
_.... Units I and 2 Vnrtfl B 3.3.246 Rev. 1